some channels takes much time and using pen and page and having very noise in background....... ..but you took short time and doing work with computer and very well management very good bro .thanks
Your estimate for volume of concrete is on a professional level, yet your speaking to un-experinced TH-cam viewer. If the viewer finally got this, no way would they know how to build the forms to hold the concrete, no to mention, how to finish the concrete, when to strip the riser forms to finish that too What I am saying: this video is correct, but over qualified for the apprentice viewer on TH-cam.
Thank you. This video was so helpful for me 🙏
some channels takes much time and using pen and page and having very noise in background.......
..but you took short time and doing work with computer and very well management very good bro .thanks
Thank u so much for the excellent Lecture!
I have watched 10 videos of yours in one today morning no stop
😂😂 LOVE YOU 😘 BROTHER 💙
Thanks for ur good explanation
Nice video brother....URS explaination is very good....all d best....👍
Excellent message brother good information about staircase concrete good explanation thank you brother
So beautiful explain video sir ji👌👌👌🥰🥰🥰plz make another video for fresher civil engineer 👏👏👏🌷🌷🌷
Thanks Engineer 👍
Hii sir pls upload staircase BBS septic tank bbs foundation ,and thx a lot for this lecture
Super method sir
I don't understand were u got the 3m used as adjecent 🙏🙏
Interesting thank bro am great full I understand well
EXCELLENT BRO....
Pls do teach quantity surveying
Excellent👍
Bro what is breadth in handrill 0.1
Super 👌
Tysm
but why you didnt convert the concrete's volume in dry by multiplying 1.54 (constant) because the concrete is in wet condition.
Awesome 😎👍 sir
No link in the description
excellent sir but hand rail concerte why calculated
Sometimes handrails are made in concrete hence its qty is considered
You can choose for one of the above gifts
Your estimate for volume of concrete is on a professional level, yet your speaking to un-experinced TH-cam viewer. If the viewer finally got this, no way would they know how to build the forms to hold the concrete, no to mention, how to finish the concrete, when to strip the riser forms to finish that too
What I am saying: this video is correct, but over qualified for the apprentice viewer on TH-cam.
Super method sir
I don't understand were u got the 3m used as adjecent 🙏🙏