Here in California Central Valley we peform the same type of work but using our arms & hands to pound those beams down in the ground on new vineyard construction.
Hey Jared, Thanks for your question. Yes, Vermeer offers guides designed to fit Schletter posts. If you have more specific questions about this model or would like to order guides, you can find your local Vermeer dealer here www.vermeer.com/NA/en/N/dealer_locator. Thanks! -Your friends at Vermeer
i love this sound. i wish i could listen to it all day long
Me gustaría saber el precio de la incadora de postes y si tienen representación en Colombia, gracias.
how did you put it into the right hole? Do you have any support equipment?
Uses gps
How do you check plane of array
Here in California Central Valley we peform the same type of work but using our arms & hands to pound those beams down in the ground on new vineyard construction.
That fuckin sucks.
No usas nivel para ver que este alineado o street line ?
Nivel almenos que la maquina este equipada con gps
How many piles per day?
What clamps are these?
Right and they do not show rigging and derigging ?
Will this pounds the Schletter rail system?
Hey Jared, Thanks for your question. Yes, Vermeer offers guides designed to fit Schletter posts. If you have more specific questions about this model or would like to order guides, you can find your local Vermeer dealer here www.vermeer.com/NA/en/N/dealer_locator.
Thanks!
-Your friends at Vermeer
Can this be driven remotely, or foes it always require two people?
They have remote options, at least the one I use at work does
@@jaredbeesecker4137how do i get a job like this?
great, but why do you need to workers for this?
Operator and laborer. Someone needs to connect it when raising and lining it up in the guides will operator lowers the hammer
Interesante el trabajo
in portuguese Brasil Bate Estaca
doing it all wrong! lol
So how its the correct way??
@@doctorH0USE yes