2018 June - Tower - Shifting 200+ Sheets of OSB from ground floor up to top floor
ฝัง
- เผยแพร่เมื่อ 23 ส.ค. 2021
- Video by = La Grange des Templiers - Castelnau d'Angles, 32320 France
After removing a lot of the rotten beams from the top floors floor - we needed to start bringing up the new OSB Boards to make things structural safe enough to have more people come and help us
Unfortunately I got the timing of the delivery wrong as at this point we only had help 1 day a month and today was not a "Dave day" as we call it.
Around 200 x 2.4m boards were delivered outside and it snowed.. They couldn't be left outside - so I just had to crack on
This shows part of my efforts to lug a lot of them of them up to the 3rd floor of the tower in stages - The video starts with me on the middle floor staging area...
Tough work but thankfully Dave was here a week later so I didn't have to do them all on my own
Great workout though!! lol