Construction of Pre-bored socketed H-pile

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ส.ค. 2024
  • To show you how to construct and calculate the capacity of Pre-bored socketed H-pile. This pile is a replacement pile.
    The capacity of Pre-bored socketed H-pile is approximately 6,000kN per pile. The pile is required to drill into rock. The capacity of pile is governed by capacity of H-pile, bond between H-pile and grout and bond between grout and rock.
    Enjoy, subscribe and like.

ความคิดเห็น • 6

  • @philip6116
    @philip6116 5 ปีที่แล้ว +3

    Keep it up! Thank you for your fruitful video!

  • @mhchow1727
    @mhchow1727 ปีที่แล้ว

    Thanks for the video!

  • @17chupb1
    @17chupb1 2 ปีที่แล้ว +1

    Dear Ray, I would like to ask if there's a limit to the socket length/depth. For my pile design, to utilize the full pile loading capacity, I would need a socket length of ~12m. I can't find the information from the codes.

  • @cheukmanhermanli7355
    @cheukmanhermanli7355 5 ปีที่แล้ว +2

    Dear ray, thanks for your great video. Is the rock socketed H pile only suitable for the case that the bedrock is close to the surface? What is the economical depth for using a rock socketed H pile?

    • @raycheung1074
      @raycheung1074  5 ปีที่แล้ว +1

      Once the bedrock is close to ground level , say 3metre, we will use footing. There is no absolute value for optimum design, but you can say 40 metre.

    • @pckey888
      @pckey888 5 ปีที่แล้ว +1

      CheukMan Herman Li there is no absolute answer, but engineers always consider with the cost. You can design with bored piles even the rock head is close to the GL, but it will be much much expensive than pad foundation.