    At my previous place there were many pallet machines and I was trained as an apprentice on how to fault find inside them. Was always fun to see what temporary repairs were still in there 10 years later after getting frustrated that the electric diagrams were now not conforming to what exists.
    A top tip I would give is when you have an old electrical cabinet with no documentation, draw your circuit on a piece of paper as you go so you don't have to do mental gymnastics remembering what controls what. If it is equipment you will be working on for a long time, label what each contactor and relay does on the cable conduit.

    • @efixx
      @efixx  ปีที่แล้ว +6

      The classic plant maintenance “temporary permanent “

    • @andylombardi2815
      @andylombardi2815 ปีที่แล้ว +1

      Trunking lids off, some totally missing, cables hanging like a spider's web. Multicores coming into a terminal rail which connects to another Multicores which then runs up the trunking, across the top, then down into a set of terminals further up the same rail. Did the installer cut their original cables short? 😉

    • @jix177
      @jix177 ปีที่แล้ว +1

      If it works it's not temporary!

  • @robertburrows6612
    @robertburrows6612 ปีที่แล้ว +14

    That's a baby control panel,.. some of the control panels I dealt with, you open them up and wished you haven't they bare no resemblance to the site log or wiring diagrams, you spend the next weekend constantly working on it and numerous calls to the Samaritans

  • @tombickerton5909
    @tombickerton5909 ปีที่แล้ว +11

    Eddie and his team are a real credit to the industry. He’s a lovely bloke who always has time for you no matter how busy he is . A very good man and a top electrician.

    • @efixx
      @efixx  ปีที่แล้ว +2

      Totally agree Tom 👍🏻

    • @tombickerton5909
      @tombickerton5909 ปีที่แล้ว +2

      @@efixx he’s my inspiration and hero but don’t tell him that lol

    • @GSHElectrical
      @GSHElectrical ปีที่แล้ว +2

      I will tell him Tom 😀

    • @eddie_pegasus_electrical
      @eddie_pegasus_electrical ปีที่แล้ว +2

      Thank you Tom for such nice comments. I could quite easily say that about you too.
      👊😎👍💙

  • @beeautomation
    @beeautomation ปีที่แล้ว +5

    Stunning panel Eddie! Love seeing MCB auxiliary’s being used like that 👌🏼

  • @carlrobson5745
    @carlrobson5745 ปีที่แล้ว +8

    As a control panel builder myself that is a nice neat job credit to the guy that wired that nothing worse than opening an emcloser and all the cables jump out to greet you,

  • @phillipdebono7576
    @phillipdebono7576 ปีที่แล้ว +6

    Very nice work as a controls engineer it very warming to see this level of panel build very clean and easy to read nice workmanship if only all panels were like this in the field

  • @PHealey1981
    @PHealey1981 ปีที่แล้ว +6

    Yesssssssssssssss!!!!! Panels!!
    Hear me out.
    This should be a designated national course.
    I did an I.C.A HNC but firmly believe it should be approached from Level 2 and 3 first.

    • @beeautomation
      @beeautomation ปีที่แล้ว +4

      100% agree… It’s a travesty UK sparks don’t get controls training in their training

  • @ireeus.
    @ireeus. ปีที่แล้ว +9

    It would be great to see more videos related to control panel wiring. Explaining the bs en 60204 which is not in the scope of bs 7671. Also testing procedures etc 😊

    • @piotrlobacz
      @piotrlobacz ปีที่แล้ว +2

      I have spotted a couple of non compliances against BS 60204.
      No continuity of bonding from MET to the door. How it is done in this panel is non compliance. Also identification of components should not be placed on the trunking but adjacent to or on a component itself.

    • @ireeus.
      @ireeus. ปีที่แล้ว

      ​​@@piotrlobacz what should it be the earth bonding in order to comply? Directly from the met to the termination point?

    • @andrewtadd4373
      @andrewtadd4373 ปีที่แล้ว

      ​@piotrlobacz looks like a plastic box and door so not required. If metal then very much needed

    • @piotrlobacz
      @piotrlobacz ปีที่แล้ว

      ​@@ireeus. yes earth bonding to each stud on the enclosure should be uninterrupted. On video there is one running to stud in the enclosure then from that to the door stud.

    • @piotrlobacz
      @piotrlobacz ปีที่แล้ว

      ​@@andrewtadd4373it is definitely not a plastic enclosure it wouldn't have bonding studs otherwise.

  • @acespark1
    @acespark1 ปีที่แล้ว +5

    Great for many to see but some of us design, build and fault find in panels like this on the daily. Also many older panels have no drawings and have been messed with by several people before you get there

  • @robbiemulholland6477
    @robbiemulholland6477 ปีที่แล้ว +2

    Really nice panel. The numbering system and drawings make fault finding relatively simple. I work in the plastics industry and have machines dating back to the late 70’s. Some have drawings, but most don’t 😩😩

  • @JohnThomas-lq5qp
    @JohnThomas-lq5qp ปีที่แล้ว +3

    Was an commercial electrician and seldom had schematics to help troubleshoot. Hardest part was troubleshooting intermittent problems. Had one huge panel that a single 20 amp 120 volt transformer with only a single 20 amp fuse feed over 20 remote solenoids, 12 motor starters, lights and probably 30 micro switches. At least once a day it would blow 20 amp fuse. Boss finally allowed me to install about a dozen in line fuse holders to direct us to what section had a intermittent short.

  • @jamesmacleod6754
    @jamesmacleod6754 ปีที่แล้ว +2

    Nice video guys, just wanted to my penny-worth to the request for more content on control panels, finding accessible guidanceon control panel standards seems quite difficult

    • @efixx
      @efixx  ปีที่แล้ว +1

      On it

  • @gareththwaite5128
    @gareththwaite5128 ปีที่แล้ว +4

    Nice video. I know technical this panel isn't a machine, I personally like to see bs 60204 applied to control panels.

  • @Ruairi.C
    @Ruairi.C ปีที่แล้ว +1

    I feel I watched a video recently of an electrician doing a fault find on a simular panel.
    He got the job done in the end but there was a struggle.
    I won't mention him by name, but he got it done is the main thing.

  • @derrickstableford8152
    @derrickstableford8152 ปีที่แล้ว +5

    Nice work, only suggestion would be to change the terminals for spring loaded. Less build time, less loosening of the terminal. Ok the problem is use in corrosion prone areas such as those with chlorine, condensation.

    • @beeautomation
      @beeautomation ปีที่แล้ว

      100% .. WAGO terminal blocks all the way 👌🏼

  • @ashyum6913
    @ashyum6913 ปีที่แล้ว +3

    Can you make a video of simple wiring diagram explanation

    • @beeautomation
      @beeautomation ปีที่แล้ว +1

      I’ve got one 🙂👍🏼

  • @andrewofford1533
    @andrewofford1533 ปีที่แล้ว +4

    Thats a very neat Installation.

  • @cerealkiller4248
    @cerealkiller4248 6 หลายเดือนก่อน

    I used to work for a multinational company, I was a shift mechanical engineer who worked alongside an electrician and support worker in the facilities dept. One day I had a new electrician working on shift and we has a problem - an AHU had tripped, and it was critical to production. We attended the plant room and I opened up the panel, the wiring practically fell out to meet us, there were zero drawings available.
    I reached inside and reset an overload on a 3 phase contractor, something I’d done many times. Later the electrician confided to me he’d sh1t himself when I opened the panel door 😂😂😂 The panels ( of which we had hundreds ) were typical of the factory, you learn to appreciate a new neatly fitted panel with a drawing

  • @satanicimpact
    @satanicimpact ปีที่แล้ว +3

    I love how cabling the panel.

  • @johnwarwick4105
    @johnwarwick4105 ปีที่แล้ว +4

    Cable numbers and a schematic, next you will tel me there is a plc logic printout 🤣. Seriously that's a nice panel. Electrician is an all encompassing term, there are at least three separate trades in the one trade. You have your domestic sparks, commercial installers and maintenance electricians. The only common factor is it makes you jump if you get hold of it 🤣🤣. We all do a-bit of each others trade but it's horses for courses in reality.

  • @CommercialGasEngineerVideos
    @CommercialGasEngineerVideos 11 หลายเดือนก่อน

    Good video, thanks, time well spent here.

  • @sergiofernandez3725
    @sergiofernandez3725 ปีที่แล้ว +2

    Interesting stuff. Would be good to see more of this type of content. Good stuff eFIXX and Pegasus Electrical.
    Question. Could you add something like a Sheely into the mix to do remote monitoring or diagnostics? (dependant on internet connectivity)

    • @eddie_pegasus_electrical
      @eddie_pegasus_electrical ปีที่แล้ว +1

      Thank you
      👊😎👍💙
      Client option not to have connected to the internet. Though wouldn’t be difficult to adapt at a later date if client requires.

    • @sergiofernandez3725
      @sergiofernandez3725 ปีที่แล้ว +2

      @@eddie_pegasus_electrical I totally understand that not everyone wants or needs things connected to the internet. Keep up the good work.

  • @BenWiggins101
    @BenWiggins101 ปีที่แล้ว +2

    Great vid

  • @johnhoward2104
    @johnhoward2104 ปีที่แล้ว +3

    Lovely!

  • @PHealey1981
    @PHealey1981 ปีที่แล้ว +4

    …never have I left site in the middle of the night having left a pump in hand…🤦‍♂️🥴🥴😆

    • @beeautomation
      @beeautomation ปีที่แล้ว +2

      I see newly “commissioned” systems left in hand 😂

    • @BenWiggins101
      @BenWiggins101 ปีที่แล้ว

      Been there, done that 🙈😂

  • @andycrask3531
    @andycrask3531 ปีที่แล้ว +2

    Looks like a crouzet PLC.
    Nice capable units relatively cheap too with free software unlike most other brands.

    • @andrewtadd4373
      @andrewtadd4373 ปีที่แล้ว

      @andycrask3531, millennium 3 looking at it, good units, have done a gsm telemetry system controling the pumps on an AD plant with one in the past.

    • @eddie_pegasus_electrical
      @eddie_pegasus_electrical ปีที่แล้ว

      Yes they are Crouzet M3s . I’ve found very cost effective and pretty much bulletproof, surprising what you can get them to do. Memory size biggest downfall IMHO.

  • @Mike_5
    @Mike_5 ปีที่แล้ว +3

    Wooooo scary panels seem to make some Electricians scared but like here they just need a logical fault process!!

    • @beeautomation
      @beeautomation ปีที่แล้ว +1

      Just lots of small circuits when you breakdown a panel isn’t it 🙂

  • @mfx1
    @mfx1 ปีที่แล้ว +1

    Many of those connections were cage clamp types and ferrules/crimps aren't needed for them.

  • @rexsonmadman
    @rexsonmadman ปีที่แล้ว +4

    Not to be too pedantic but, all those wire numbers are reading in the wrong direction.

    • @rexsonmadman
      @rexsonmadman ปีที่แล้ว +1

      @@pab26120 I have always understood that the numbering should read away from the thing it's connected to. Yes, you might have to tilt your head multiple times to follow a circuit. Not sure about the rules here 🤷‍♂

    • @BenWiggins101
      @BenWiggins101 ปีที่แล้ว

      Usually reads away from term, or tilt head to left, many different combinations especially when you start with source/destination markers. Mostly I've found that it's client specification dependant, probably stems from which country the panel is going to

  • @emilgemc8913
    @emilgemc8913 ปีที่แล้ว +2

    Some of the control pannels i work in Science
    A big tech corporate in surrey area are some control pannels with a 200 different Sensors cables we wiring up are a big machines and hydraulic engines Staines steal which costing up to 4 million

  • @octymocty132
    @octymocty132 ปีที่แล้ว +2

    Going so well untill you spoke as a true house basher about seprate earth bar in a C U
    Would have been nice to explain the wire colours ( hi to low volt ) for people who don't work on proper electrical jobs
    very nice clean job hats off builder

    • @cliveramsbotty6077
      @cliveramsbotty6077 9 หลายเดือนก่อน

      class 2 fittings though. he noticed the class 2 fittings. did you notice the class 2 fittings. they were class 2.

  • @aaron74
    @aaron74 ปีที่แล้ว +1

    Just a beautiful dressing inside, it's a shame the panel is opaque lol

  • @irechopshop
    @irechopshop ปีที่แล้ว +5

    Why are some Electricians scared of control panels, once you have a drawing child’s play

    • @danielthorne3088
      @danielthorne3088 ปีที่แล้ว

      Perhaps they don't all have drawings?

    • @stevejagger8602
      @stevejagger8602 ปีที่แล้ว

      Who can still read circuit diagrams?
      Is that art still taught?
      I grew up with electronics experimentation from the 1960's and eventually qualified as an electrical and electronic engineer so it's second nature to be able to read circuit diagrams.

    • @irechopshop
      @irechopshop ปีที่แล้ว +1

      @@danielthorne3088 i served my time in the early 80’s before motile phones, the company philosophy was it was working, so just fix it, i have spent days on site doing drawings, and then fixing the problem

    • @beeautomation
      @beeautomation ปีที่แล้ว +1

      Because the unknown is scary… certainly not child’s play but not as bad as people think.

    • @BenWiggins101
      @BenWiggins101 ปีที่แล้ว

      Drawings? What are they? Lol. I just get told what mods they want and have to make up my control as I go lol.

  • @obd6HsN
    @obd6HsN ปีที่แล้ว

    How much was the customer charged for this panel?

  • @uk53781
    @uk53781 ปีที่แล้ว +1

    The cable numbering way of doing things is so stupid and needs phasing out of the industry. Just lable the component.

    • @johnaphone
      @johnaphone ปีที่แล้ว +14

      So you have a panel with 100 beldons with no numbers, just sensor 1 - 100 in the field. Good luck troubleshooting that. If anything, putting an ident on every core should be mandatory

    • @andycrask3531
      @andycrask3531 ปีที่แล้ว +11

      When you have worked on a panel with 100s of cables going to satellite panels all bundled on ladder or in ducting. With the pressure of a multimillion pound company wanting to know why their machine has stopped. You will be extremely greatful of numbered cables.

    • @robertburrows6612
      @robertburrows6612 ปีที่แล้ว +3

      That's a baby control panel, I've worked on control panels that would dwaf that by a factor of 30 plus, there a nightmare when nothing is s numbered and they been repaired number of times over the years and you can guarantee the wiring diagrams are well out of date because of the old components weren't available and they had to use a modern equivalent of new equipment been installed and they rewired the panel to make it work with the new machinery.

    • @pn8902
      @pn8902 ปีที่แล้ว +1

      You have no idea what youre talking about, Label the component what?? Call it Relay 1, then what? which cable is going to the load, which is the supply? They will all be brown/blue.
      Basic electricians cant have an opinion on how things are done because all they know is "put brown here and blue there and it will work". Control panels need a lot more knowledge. Dont mean to offend any electricians but that's just how it is, and if you dont feel like that then you're more than a basic electrician so you're good :)

    • @andrewtadd4373
      @andrewtadd4373 ปีที่แล้ว

      You really need to give your head a shake, you clearly have no idea what you are talking about.