Can you list the chronological order of the TH-cam tutorials. They were numbered up until a point, then they seem to loop back. I am enjoying your work but I seem to have lost my place after Critical Paths...
Hello Simon, I have a question. -EXAMPLE- When I insert 18.09.2019. as a date for an actual start, duration automatically changes to i.e. 88 days, which makes sense since it is auto scheduled. duration start finish Actual start Actual finish % complete 88 days 25.11.2019 14.12.2019 18.09.2019 10% However, when I set manual schedule the finish date changes as if it still lasts approximately 88 days, even though everything else appears the same, meaning duration start finish Actual start Actual finish % complete 20 days 25.11.2019 12.12.2019 18.09.2019 10% What i need to do is be able to change act start and % compl. and that duration does not change? Fyi my steps for doing that are, change to manual schedule, insert act start and % compl. and then update status date. Do you have any ideas how to change and solve this problem? Thank you!
You did not discuss adding PERT custom field like i thought it would. Thats dissappointing. I wanted to look at creating a PERT estimate, Optimistic, Likely and Pessimistic
Great video, although, if you, as groom, come with an MS-project file to your future bride, I'm sure the wedding will be off ;-)
Haha!
Your tutorials are making me look good hahaha
Wohooo! Happy to hear that Jack!
Can you list the chronological order of the TH-cam tutorials. They were numbered up until a point, then they seem to loop back. I am enjoying your work but I seem to have lost my place after Critical Paths...
very good information about the critical path
Glad it helped. Thanks for watching.
Can you provide me the link to a tutorial showing to create Network Diagram-Activity on the node from the Gantt chart? if you have made it.
i liked the filter thing
Thanks for this vid!!!!
Our pleasure!
Hello Simon, I have a question.
-EXAMPLE-
When I insert 18.09.2019. as a date for an actual start, duration automatically changes to i.e. 88 days, which makes sense since it is auto scheduled.
duration start finish Actual start Actual finish % complete
88 days 25.11.2019 14.12.2019 18.09.2019 10%
However, when I set manual schedule the finish date changes as if it still lasts approximately 88 days, even though everything else appears the same, meaning
duration start finish Actual start Actual finish % complete
20 days 25.11.2019 12.12.2019 18.09.2019 10%
What i need to do is be able to change act start and % compl. and that duration does not change? Fyi my steps for doing that are, change to manual schedule, insert act start and % compl. and then update status date.
Do you have any ideas how to change and solve this problem?
Thank you!
You did not discuss adding PERT custom field like i thought it would. Thats dissappointing. I wanted to look at creating a PERT estimate, Optimistic, Likely and Pessimistic
We'll look at that for future videos. Thanks Duncan
thanks so helpfull .. sub+liked