How to Use Critical Paths in Project 2016

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 พ.ย. 2024

ความคิดเห็น • 15

  • @didiervereecke7642
    @didiervereecke7642 3 ปีที่แล้ว +3

    Great video, although, if you, as groom, come with an MS-project file to your future bride, I'm sure the wedding will be off ;-)

  • @jackhammer3793
    @jackhammer3793 4 ปีที่แล้ว +2

    Your tutorials are making me look good hahaha

    • @SimonSezIT
      @SimonSezIT  4 ปีที่แล้ว

      Wohooo! Happy to hear that Jack!

  • @edwardsolon168
    @edwardsolon168 7 ปีที่แล้ว +3

    Can you list the chronological order of the TH-cam tutorials. They were numbered up until a point, then they seem to loop back. I am enjoying your work but I seem to have lost my place after Critical Paths...

  • @deidrajones4837
    @deidrajones4837 8 ปีที่แล้ว +1

    very good information about the critical path

    • @SimonSezIT
      @SimonSezIT  8 ปีที่แล้ว

      Glad it helped. Thanks for watching.

  • @harikrishnabhandari8398
    @harikrishnabhandari8398 4 ปีที่แล้ว

    Can you provide me the link to a tutorial showing to create Network Diagram-Activity on the node from the Gantt chart? if you have made it.

  • @adamm5425
    @adamm5425 5 ปีที่แล้ว +2

    i liked the filter thing

  • @jackhammer3793
    @jackhammer3793 4 ปีที่แล้ว +1

    Thanks for this vid!!!!

  • @enisat220
    @enisat220 4 ปีที่แล้ว

    Hello Simon, I have a question.
    -EXAMPLE-
    When I insert 18.09.2019. as a date for an actual start, duration automatically changes to i.e. 88 days, which makes sense since it is auto scheduled.
    duration start finish Actual start Actual finish % complete
    88 days 25.11.2019 14.12.2019 18.09.2019 10%
    However, when I set manual schedule the finish date changes as if it still lasts approximately 88 days, even though everything else appears the same, meaning
    duration start finish Actual start Actual finish % complete
    20 days 25.11.2019 12.12.2019 18.09.2019 10%
    What i need to do is be able to change act start and % compl. and that duration does not change? Fyi my steps for doing that are, change to manual schedule, insert act start and % compl. and then update status date.
    Do you have any ideas how to change and solve this problem?
    Thank you!

  • @duncanfirth3344
    @duncanfirth3344 5 ปีที่แล้ว

    You did not discuss adding PERT custom field like i thought it would. Thats dissappointing. I wanted to look at creating a PERT estimate, Optimistic, Likely and Pessimistic

    • @SimonSezIT
      @SimonSezIT  5 ปีที่แล้ว

      We'll look at that for future videos. Thanks Duncan

  • @andyjohannes4233
    @andyjohannes4233 8 ปีที่แล้ว

    thanks so helpfull .. sub+liked