Grounding, Service Equipment [250.24, 2020 NEC]

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 พ.ย. 2024

ความคิดเห็น • 8

  • @asmamawtesfaye4079
    @asmamawtesfaye4079 4 ปีที่แล้ว +1

    Well come back Mike and friends,with the new video!

  • @knucklehead83
    @knucklehead83 หลายเดือนก่อน

    Would you say that the service ends at the service entrance panel disconnect? Is an emergency or service disconnect on the service side if it is placed before the service entrance? I ask because I saw one video that stated that you only bond the first disconnect after the meter, and another video stated otherwise, that the service entrance was the only correct bond.

    • @MikeHoltNEC
      @MikeHoltNEC  หลายเดือนก่อน

      Please post your questions about the Emergency Disconnect on MikeHolt.com/Forum

  • @sylvesterstewart868
    @sylvesterstewart868 3 ปีที่แล้ว +1

    In a AC/DC coupled solar system in a grid up condition the neutral ground bond is in the MP and the essential load panel is a sub panel?
    In a grid down condition the MP is isolated, where is the neutra/ground bond ?

    • @MikeHoltNEC
      @MikeHoltNEC  3 ปีที่แล้ว +1

      Neutral/ground bond only occurs in service equipment per 250.24(A)(5).

    • @sylvesterstewart868
      @sylvesterstewart868 3 ปีที่แล้ว

      @@MikeHoltNEC Thank you for responding, I'll go back to tripping on the crossed neutral thing.

  • @Roger-u1h6j
    @Roger-u1h6j 10 หลายเดือนก่อน

    Is there accreditation for low voltage wiring? 1:34

    • @MikeHoltNEC
      @MikeHoltNEC  10 หลายเดือนก่อน

      Please call 352.360.2620