Hello Kyle. Can you please confirm wire connection sequence. On internal wires above they are marked and sequenced as Neutral and then Live. But on the silkscreen text below the terminal blocks they are Live Neutral PE. Should external connection be made as L N PE or N L PE ?
Also, if you have parallel inverters, if L and N connections are swapped. Would this cause problems with CT readings when trying to do zero export to CT when all load is connected to load port and only grid supply connected to grid port?
@@robgood9119 Dear, Kyle! We had a problem in the system with limited export to the mains through measuring CT in 5kW hybride inverters. The problem was solved by changing the direction of installation of the current transformer
@@nicof9202 good morning. Thank you for watching and commenting. Yes it is. There are videos on TH-cam that show them with separate batteries. Regarding smart load when in parallel. I don't know the answer to that. I will ask and get back to you. Great questions
You did not use busbar for interconnecting the battery cable and ac output, you direct the wire of the slave inverter to the battery terminal of deye master?
@@DeyeInverter_official Thank you. I will buy second SUN-8K-SG01LP1-EU. But I have a problem that it is impossible to get in EU. No e-shop offers the single phase SUN-8K-SG01LP1-EU
I have a three phase coming from grid can i use different power rating in parallel for exaple in L1 ( 6kw parallel with 6kw) parallel with L2 (6kw) parallel with L3(4kw)?
Hello, I have a question. The inverter SUN-12K-SG04LP3 has the parallel connection device built in, or do I have to pay extra price and buy this extra feature?
Hi, for Lead acid batteries, the bank need to be connected in parallel also, or can i connect a battery bank independent to each inverter?. I have 3 inverters and the battery voltaje is lower on Slaves inverters, when the master stop charging the slaves do also and the batteries are not charged complete.
Hi Kyle, I just want to ask. There is a parallel connected Deye Hybrid Inverters. Both are 8 kW Hybrid Inverters. We connected a Over Under Voltage Protection Device so the client can monitor the voltage and current passing through. My question is, the Inverters are running normally and don't have any errors, why is it that there is no current passing through the Grid terminal of Inverter 1? Current is only passing through to Grid terminal of Inverter 2... What could be the reason?
Continuation to the first question, when the client turns OFF the circuit breaker for Grid of Inverter 1, brown out occurs even if circuit breaker for Grid of Inverter 2 is still ON.
@@DeyeInverter_official Hi Deye, No, it did not explode. There is just no current passing through the GRID terminal... Then now, the batteries just became low-battery status (Battery 1: 0%; Battery 2: 12%) and the whole system just shut down. I think this happens every month.
Sir, can you explain to me, why the total load not divided equally among the 3 inverters? Example: When I have 3 batteries, if the load need, their output currents are almost equal thanks to
Hi, please I will like to learn about the power factor of your hybrid inverters, on the manual it says 0.8 while on the settings page I see some places it says 1, please what is the implication of this setting
Hello sir
Can u tell me in parrallel can we use of smart load??
Do I need a 3 phase back feed breaker for each inverter?
Can smart load function if inverters are connected in parallel?
Hello Kyle. Can you please confirm wire connection sequence. On internal wires above they are marked and sequenced as Neutral and then Live. But on the silkscreen text below the terminal blocks they are Live Neutral PE. Should external connection be made as L N PE or N L PE ?
Also, if you have parallel inverters, if L and N connections are swapped. Would this cause problems with CT readings when trying to do zero export to CT when all load is connected to load port and only grid supply connected to grid port?
@@robgood9119 you all right.
this causes the problem of restricting exports to the mains.
@@robgood9119 Dear, Kyle! We had a problem in the system with limited export to the mains through measuring CT in 5kW hybride inverters.
The problem was solved by changing the direction of installation of the current transformer
Did you find True choose? Which one is True? Board or Connected cable marking?
@@oguzatagan5500 Yes, the PCB board markings
Kyle thank you. So if I want a total of 90 amps charge current, I set each inverter at 30 amps?
yes
witch model is this one?
Is it possible to have separate battery for each inverter in // ?
Also can we use smart load output in //?
Thanks
@@nicof9202 good morning. Thank you for watching and commenting. Yes it is. There are videos on TH-cam that show them with separate batteries. Regarding smart load when in parallel. I don't know the answer to that. I will ask and get back to you. Great questions
Battery cable and ac output wire connected together? I suggest to use busbar for the sake of clean install.
You did not use busbar for interconnecting the battery cable and ac output, you direct the wire of the slave inverter to the battery terminal of deye master?
Hello sir may ask you,how about the CT,you need to connect also the 3 CT to the grid?thanks for the reply
Is possible to connect to slave inverters various strings of PV ? DIfferent directions, different count of pannels ? thx
can we use only two inverters in parallel for one phase?
yes, it can parallel
Can I parallel a 5kw and a 8kw or 6wk inverter or do they needs to be of the same size?
up, same question
Is it possible to connect two different sighle phase inverters in parallel? SUN-8K-SG01LP1-EU and SUN-6K-SG03-LP1-EU?
It's impossible
@@DeyeInverter_official
@@DeyeInverter_official Thank you. I will buy second SUN-8K-SG01LP1-EU. But I have a problem that it is impossible to get in EU. No e-shop offers the single phase SUN-8K-SG01LP1-EU
What is the 20% battery voltage set at ?
I have a three phase coming from grid can i use different power rating in parallel for exaple in L1 ( 6kw parallel with 6kw) parallel with L2 (6kw) parallel with L3(4kw)?
If I installed in 2 unit hybrid inverter , we need install CT sensor on each inverter or install on Master only
Hello, I have a question. The inverter SUN-12K-SG04LP3 has the parallel connection device built in, or do I have to pay extra price and buy this extra feature?
It is built in.
All you need to do is "enable" it as shown here 1:11
Hi, for Lead acid batteries, the bank need to be connected in parallel also, or can i connect a battery bank independent to each inverter?. I have 3 inverters and the battery voltaje is lower on Slaves inverters, when the master stop charging the slaves do also and the batteries are not charged complete.
yes, the battery need to be paralled as well. that issue caused by the battery is not commoned for the three inverters.
Each inverter has their own string of PV?
yes, each inverter has its own pv
@@DeyeInverter_official tnx for the info.
Need to connect each inverter to pv? Is it not necessary and only the main one can be connected?
What are the sizes of the cable glands for Battery, PV and Communication cable inputs below the inverter for Deye Hybrid 8kWp? Thank you.
Hi Kyle, I just want to ask.
There is a parallel connected Deye Hybrid Inverters. Both are 8 kW Hybrid Inverters.
We connected a Over Under Voltage Protection Device so the client can monitor the voltage and current passing through.
My question is, the Inverters are running normally and don't have any errors, why is it that there is no current passing through the Grid terminal of Inverter 1? Current is only passing through to Grid terminal of Inverter 2...
What could be the reason?
Continuation to the first question, when the client turns OFF the circuit breaker for Grid of Inverter 1, brown out occurs even if circuit breaker for Grid of Inverter 2 is still ON.
Hi, the grid port of each inverter should be paralleld. the second one exploed ? if so, contact your inverter provider.
@@DeyeInverter_official Hi Deye,
No, it did not explode.
There is just no current passing through the GRID terminal...
Then now, the batteries just became low-battery status (Battery 1: 0%; Battery 2: 12%) and the whole system just shut down.
I think this happens every month.
Gud noon, what is the solution on the AC over current fault? Tnks in advance
12kw 3phase hybrid inverter has no parallel yet? What would be the solution to parallel two 12kw 3phase hybrid inverter? A big tnks
Sir, can you explain to me, why the total load not divided equally among the 3 inverters? Example: When I have 3 batteries, if the load need, their output currents are almost equal thanks to
Hi, please I will like to learn about the power factor of your hybrid inverters, on the manual it says 0.8 while on the settings page I see some places it says 1, please what is the implication of this setting
HI, you can adjust it on the LCD screen.
Why is it that on the screen, there is no M01, S02, S03 designation?
Is it because this is old Firmware?
Can you please tell how to connect 2 parallel pylontech Batteries to 2 deye 5kw inverter ?
A lot of parametrs have to be :( but fine inverter . I WOULD TO LIKE TO TEACH THAT all
sir pwd pa hengi ng guide sa parallel conection sir thank u po..
I want to buy deye inverters please guide me
Hi,please contact the email ,our sales team will help you
@@DeyeInverter_official what model is the inverter?
Why i dont see your CT ?
On the diagram, CT is connected to master inverter only right?
How much price this inverter
please contact market@deye.com.cn
@@DeyeInverter_official hi How can i check any logger ples
I am installer
Hello deye.
Board lineup write L, N, PE. BUT Connected cable lineup write N, L, PE. Which one is True?
Veryva
Ogbogu gabriel
Hi
Can I have your contact details I’m in south Africa
Terrible explanation
Very bad example.
Hello sir, if you have any questions, please contact our after-sales service email: service@deye.com.cn