sir borrow area me pit ki depth kitni honi chahiye as per irc/morth
Section 305.2.2.2 of MoRTH 2013 suggests a maximum depth of 1.5 m
Is it possible for fly ash-based geopolymers to stabilize soils? ZAV line may be below OMC charts. Please sir answer..
It should be possible. Proper lab study is required.
Embankment toe se kitne durime borrowpit khodna chahiye minimum distance kitna
Depends on height of the embankment
Sir row se borrow area ki minimum distance kitna hona chahiye
5 m from the toe of the final section of the embankment
Could you provide insight into the practical conditions in which use of oversized material (>50mm/75mm) would not pose a problem.
Oversized aggregate in any layer will always create the problem of compaction and air voids.
Sir,how to calculate quantity of dowel bar in one cubic meter of concrete having slab thaickness 0.30 m ?
Number of dowel bars are decided based on slab size and the radius of relative stiffness. It is part of the pavement design. It is not calculated per cubic metres of concrete.Watch my video on dowel bars
sir borrow area me pit ki depth kitni honi chahiye as per irc/morth
Section 305.2.2.2 of MoRTH 2013 suggests a maximum depth of 1.5 m
Is it possible for fly ash-based geopolymers to stabilize soils? ZAV line may be below OMC charts. Please sir answer..
It should be possible. Proper lab study is required.
Embankment toe se kitne durime borrowpit khodna chahiye minimum distance kitna
Depends on height of the embankment
Sir row se borrow area ki minimum distance kitna hona chahiye
5 m from the toe of the final section of the embankment
Could you provide insight into the practical conditions in which use of oversized material (>50mm/75mm) would not pose a problem.
Oversized aggregate in any layer will always create the problem of compaction and air voids.
Sir,how to calculate quantity of dowel bar in one cubic meter of concrete having slab thaickness 0.30 m ?
Number of dowel bars are decided based on slab size and the radius of relative stiffness. It is part of the pavement design. It is not calculated per cubic metres of concrete.