New Mall - Parqal Mall (Park and Kalye) Aseana City Paranaque
ฝัง
- เผยแพร่เมื่อ 29 ม.ค. 2024
- New Mall - Parqal Mall (Park and Kalye) Aseana City Paranaque
Parqal, a word play from the terms Park and Kalye, is a five-hectare mixed-use campus development that has a gross floor area (GFA) of 78,000 sq.m.. It is composed of nine independent four-storey buildings that will traverse the entire length of area between Macapagal Boulevard and Diokno Road. The whole stretch of the development is climate protected through its “floating” canopy made of ETFE (ethylene tetrafluoroethylene), a type of sustainable material that is designed for natural light, lightweight and durability. Moreover, the project is designed to be porous with multiple entrance and exit points which will further promote walkabilty and pedestrian mobility for Aseana City.
Total Gross Leasable Area:
70,147.66 sq.m. (Phase 1)
Typical Floor Plate:
Bldg. 1 - 2,400 sq.m.
Bldg. 2 - 2,600 sq.m.
Bldg. 3 - 3,000 sq.m.
Bldg. 5 - 2,900 sq.m.
Bldg. 6 - 2,400 sq.m.
Bldg. 7 - 1,800 sq.m.
Bldg. 8 - 2,400 sq.m.
Bldg. 9 - 1,800 sq.m.
Number of Towers:
9 Independent Interconnected Buildings
Number of Floors:
4
Tenant Handover Condition:
Bare Shell
BERDE Accreditation:
5 Stars
Rental Rate:
Upon Request
Detailed Floor Plans:
Upon Request
Density Ratio:
Retail GF - 1 pax / 2.8 sq.m.
2F - 1 pax / 5.6 sq.m.
Office - 1 pax / 9.3 sq.m.
Parking Ratio:
1 slot:100 sq.m.
A/C System:
Variable Refrigerant Flow
JOIN THIS CHANNEL... to get access to perks:
/ @mikoteevee
So the parking area is at the basement?
yup... theres also outside the mall..
@@mikoteevee thanks!
San po entrance ng parking outside the mall and yung sa basememt parking?
yung outside parking sir.. if you are facing the front ng mall.. .its on the left side... same entrance din ng basement parking...