@@omprakashkumar1172 After passing the Gate train will go with normal speed only. Speed restriction is only in Automatic Block System. After passing Automatic Signal at on we have to follow SR 10 KMPH upto next Automatic Stop Signal.
Sir please throw some light on If the N/I LC gate man not found and procedures to be followed by the crew. (Gate found in open/closed). Passing LC gate with out G Maker and LC gate man not found.
Follow Gate rule if it is in open condition and give all concerned message if Gateman not available. Give message to all concerned if gate is closed & Gateman not available
Nice topic sir
Sir one video banaie all circumstances of cautious order please sir
Ok 👍
Sir I am a trainee points man 👨
Your video helps me a lots.
Thank you Sumit,
I feel happy with your satisfaction 😊
Sir Signal number k se set kiye hote he DN line ke signal number
Or UP line ke singnal number...
In case of any doubt,
You can write your questions or suggestions here
Sir how much speed in absolute block system if gate signal is on condition
@@omprakashkumar1172
After passing the Gate train will go with normal speed only.
Speed restriction is only in Automatic Block System.
After passing Automatic Signal at on we have to follow SR 10 KMPH upto next Automatic Stop Signal.
Gate cum distant signal defective hone ka information locopilot se milne par iske piche wali train ko kya koi authority issue karenge??
@@omprakashkumar1172
After passing the gate normal speed
@@rajakumar-ey4qq
Caution order till it’s repaired
How can we download Gr nd Sr book
Good information
Sir in your videos ,semi automatic gate stop signal interlock with point
A and AG marker.i have not found
Sir please throw some light on
If the N/I LC gate man not found and procedures to be followed by the crew.
(Gate found in open/closed).
Passing LC gate with out G Maker and LC gate man not found.
Follow Gate rule if it is in open condition and give all concerned message if Gateman not available.
Give message to all concerned if gate is closed & Gateman not available
Sir pls make video on temporarily single line (tsl) on double line section
Sure
Sir G/D SIGNAL BUT GET OPEN SIR WHAT RULE FOIIOW
If Gate is open, stop the train and train will go only after closing the Gate 😊
Sir if the gateman is not responding for interlocked gate in that case can we give line clear by issuing caution order??
Yes 👍
How much speed in absolute block system if gate signal is on condition.
Normal speed after passing the Gate