Could you please complete the procedure for Dewatering system Well point 1, Drill the borohole both sides of the trench or excavation area, the holes are drill minimum 1M interval, 2, after drilling a high pressure water shall be injected into the borohole the water is flesh out borohole and also remove the clay , During the jetting 50mm filter pipe is inserted into the borohole and place 10mm aggregate surrounded to the filter pipe 3, all the filter pipes are connected to the Header pipe by using a flexible pipe 4, The one end of the Header pipe is connected to a vacuum pump 5,?????? 6,????? 7,??????
5. After pump sucking water from this place . Water will not come above the surface of excavated are. 6 start the construction wark of MH. up to complete the construction of MH Dewatering pump 24/7 will be on working position. 7. after completing the construction start Application of waterproofing work. 8. after waterproofing start backfilling layer by layer and apply FDT Testing. 9. after completing backfilling up to g G.L remove Dewatering pump.
Dear after completing the construction of Lift station. Start backfilling after completing backfilling upto G.L Dewatering pump will be removed from this place.
Thank you sir for uploading this informative videos. It really helps a lot in understanding d practical aspects of civil engineering
Very informative
Good job
Could you please complete the procedure for Dewatering system Well point
1, Drill the borohole both sides of the trench or excavation area, the holes are drill minimum 1M interval,
2, after drilling a high pressure water shall be injected into the borohole the water is flesh out borohole and also remove the clay , During the jetting 50mm filter pipe is inserted into the borohole and place 10mm aggregate surrounded to the filter pipe
3, all the filter pipes are connected to the Header pipe by using a flexible pipe
4, The one end of the Header pipe is connected to a vacuum pump
5,??????
6,?????
7,??????
5. After pump sucking water from this place . Water will not come above the surface of excavated are.
6 start the construction wark of MH. up to complete the construction of MH Dewatering pump 24/7 will be on working position.
7. after completing the construction start Application of waterproofing work.
8. after waterproofing start backfilling layer by layer and apply FDT Testing.
9. after completing backfilling up to g G.L remove Dewatering pump.
Hi
Assalam o alaikum sir
Whats the procesure for removing of dewatering system???
Hi sir please make the video for full installed dewatering system
Ok I will try
My no 9999995928dewatring work
Hi sir good videos
Thanks for uploading informative video's
Thanks dear
Sara ham bhi diva Dewrating kam karte hain Pakistan
Assalam o alaikum sir
Whats procedure for removing of dewatering system???
Dear after completing the construction of Lift station. Start backfilling after completing backfilling upto G.L Dewatering pump will be removed from this place.
Dewatering ground water we do before construction water can fill in tanks and reuse it we are wasting water into drainage pouring through pipes
Need sop for dewatering
th-cam.com/video/1cy_s065M9M/w-d-xo.html
Assalam o alaikum sir
Whats the procesure for removing of dewatering system???
Assalam o alaikum sir
Whats the procesure for removing of dewatering system???