Very helpful. Thank you so much. Are you in India or Srilanka. This project seems to be in the suburbs , so there is no hindrance to get rid of the excess water emerging from the land after excavation. Do we have to excavate so deep if it is only for a two storey house, and the land is situated near a ditch on the north boundary and drains on the main road on the western boundary. It is a filled up marshy land. What would be the best way to get the excess water drained out , as it is near a main road
Earlier we have a septic tank at the depth of 12 feet we have fill it with red soil we cure it well and we start a new construction after 4 months ,in that plan the we got a pillar in that tank we make agur pillar of we thought that to make 17 feet depth ,but we can dig only 9 feet due coming water in that hole , and we make pillar of 9 inch and and we make a bed at the normal soil level of 2 feet thickness and 2/2 size . My question is ,is there any problem for that pillar in future we making g+1 construction
Applying antitermite is incorrect can reduce its effectiveness. It is important to follow the instructions and not to put antitermite over the existing soil with water mix ratio changes. The soil may not absorb the antitermite evenly.
WOW... Someone REALLY wanted to use this piece of land. You guys may not have shoes, but ya got some really big balls!
I Love This... U Guys Are Good... Great Grace... 🙏🏽🙏🏽🙏🏽
First time I see this type of anti termite process ;)
Do we provide perforated pipe and pit for seepage drainage
Thank you so much for this video , it hepled me so much . ❤
Superb explanation.. good keep it bro..optimize video sir ji
Valuable strl infrmn well done good luck
Can we do the same procedure if we find well on site?
Wow, nice explanation ❤
Thank you
@05:08 20mm to 50mm? The size used is 150mm to 200mm
One mistake you guys did is not providing dpc of polythene sheeting on top of the plum concrete before matting the footings
Don’t you have to backfill the mud in layers and do compacting ?
Wow Amazing
Good information....
Very helpful. Thank you so much. Are you in India or Srilanka. This project seems to be in the suburbs , so there is no hindrance to get rid of the excess water emerging from the land after excavation. Do we have to excavate so deep if it is only for a two storey house, and the land is situated near a ditch on the north boundary and drains on the main road on the western boundary. It is a filled up marshy land. What would be the best way to get the excess water drained out , as it is near a main road
What does it cost for a this type of foundation in 30X54 ft area. in Uttarakhand
Earlier we have a septic tank at the depth of 12 feet we have fill it with red soil we cure it well and we start a new construction after 4 months ,in that plan the we got a pillar in that tank we make agur pillar of we thought that to make 17 feet depth ,but we can dig only 9 feet due coming water in that hole , and we make pillar of 9 inch and and we make a bed at the normal soil level of 2 feet thickness and 2/2 size . My question is ,is there any problem for that pillar in future we making g+1 construction
Interesting and helpful
Good 👍
Very nice sir ji
can uh discuss the total expenses for this base
Super 👍👍
Thank you sir
Super bhayya
What if from side water oothu
You should have left that and convert it to a basement
Applying antitermite is incorrect can reduce its effectiveness. It is important to follow the instructions and not to put antitermite over the existing soil with water mix ratio changes. The soil may not absorb the antitermite evenly.
How much did it cost overall
16bucks.... flip flops are still pretty cheap these days. :/
Hi sir, can you construct our house at nagarbhavi G+3.
If we have done bhoomi Pooja then there is no necessary of any engineering skills or intelligence... The pooja will make build stronger 😁😀🤣😆
Tevidya paiya
That look’s costly 😮
Contact no