Tejas MK-2 का बड़ा order | सबसे अलग होगा Tejas MK-2

แชร์
ฝัง
  • เผยแพร่เมื่อ 7 ก.ย. 2024
  • Better than Rafale, LCA Mk2 to roll out by end of year 2024 - ADA
    The MoU signed in June 2023, for the manufacture of GE F414 engine which will power LCA Mk2 with 80% indigenous content has accelerated the LCA MK2 development.
    As per the report published by the TOI, Prabhulla Chandran VK, director of avionics and weapons systems at the Aeronautical Development Agency (ADA) has said that the Tejas Mk 2 light combat aircraft (LCA) could be ready for its maiden flight by 2025.
    He said it will take 18 months from now to roll out (the plane), and the first flight will take another six months. In summary, the roll out of LCA Tejas Mark2 will be by end of year 2024 and its first flight in mid of 2025.
    He also said that with the pact signed between HAL & GE, 90% of the components of the fighter jet will be indigenous. The focus will be on state-of-the-art radar systems, weapons, and other capabilities (all made in India, barring the ejection seat and a few sensors). The one-engine fighter will be better than Rafale. This fighter plane will have only one version. We might go in for a trainer plane later.
    Looking at the progress being made LCA MK2 may enter into production by 2028-29. The fighter jet will greatly boost the IAF capabilities which is struggling with declining fighter jet squadron.
    LCA Mark 2 critical to boost IAF squadron strength
    Indian Air force will lose 3 squadrons of Jaguars & 3 squadrons of Mig-21 by 2030. The loss of 6 Squadron will be fulfilled by the addition of 83 Tejas Mark-1A. However, the squadron strength of IAF will be still close to 31 or 32 which is much lesser than the sanctioned squadron strength of 42. LCA Mark-2 is also going to replace the fleets of MiG-29 & Mirage-2000 when they are slated to decommission. Therefore, Indian air force has high hopes on LCA Mark-2 program to supplement its fast-depleting squadron strength. The air force has committed for 6 squadrons of LCA Mark-2 in Phase-I and additional 4 squadrons in Phase-II.
    Join this channel to get access to perks:
    / @indiandefenseanalysis
    **WHOMSOEVER IT MAY CONCERN
    Most of the pictures clip or BGM included in the Video
    Belongs to their Respected Owners and we do not claim rights.
    We are using them under following act:
    UNDER SECTION 107 OF THE COPYRIGHT ACT 1976, ALLOWANCE IS MADE FOR "FAIR USE" FOR PURPOSES SUCH AS CRITICISM,
    COMMENT, NEWS REPORTING, TEACHING, SCHOLARSHIP, AND RESEARCH. FAIR USE IS A USE PERMITTED BY COPYRIGHT STATUTE THAT MIGHT
    OTHERWISE BE INFRINGING. NON-PROFIT, EDUCATIONAL OR PERSONAL USE TIPS THE BALANCE IN FAVOR OF FAIR USE.
    Follow us on social media:
    / analysisdefense
    indiandefensea...
    ==============THANKS FOR WATCHING!================
    PLEASE LIKE SHARE & SUBSCRIBE: "INDIAN DEFENSE ANALYSIS"
    Music: Eternal Garden - Dan Henig

ความคิดเห็น • 68

  • @rashtrawad
    @rashtrawad 5 หลายเดือนก่อน +1

    Us दिन का बेसब्री से इंतजार है जब तेजस mk2 induct होने लगेंगे. जय हिन्द 🇮🇳 🇮🇳

  • @20001india
    @20001india ปีที่แล้ว +5

    Govt should give approval as soon as possible to avoid delay in rollout.

  • @ashokgosawi5620
    @ashokgosawi5620 ปีที่แล้ว +19

    Give task to tata for ejection seats

    • @blackworld917
      @blackworld917 ปีที่แล้ว

      Uk making for us ... We always depends others bro what to do

    • @RamaKrishnaYeleswarapu-kj4en
      @RamaKrishnaYeleswarapu-kj4en ปีที่แล้ว

      Our stupids can't live without begging others shame. Even they tyres are Dunlop british I read I did rather prefer mrf. Stupids only know how to give orders.

  • @vishwajitpurwar1736
    @vishwajitpurwar1736 ปีที่แล้ว +11

    I think IAF and Navy should start thinking of recruiting scientists, engineers and technocrats for in-house development of fighter planes and other armament and self produce them. This will quicken the process. No need of permission. Not too many types of trial, straight away induction

  • @babua3605
    @babua3605 ปีที่แล้ว +3

    Great explanation

  • @valerianpereira1259
    @valerianpereira1259 ปีที่แล้ว +2

    1/Stealth..
    2/Laser .
    3/Nano tech
    4/AI.
    5/Robotics.
    6/Invisible...No smoke

  • @kksharma2822
    @kksharma2822 ปีที่แล้ว +2

    Great job, Thank you 👍

  • @user-yv7cr4fw5p
    @user-yv7cr4fw5p ปีที่แล้ว +1

    Jay.hind.Tejas.mk.2❤

  • @angryhusky2467
    @angryhusky2467 ปีที่แล้ว +5

    LCA Tejas ke 500 plane deploy ho jaye to maja hi aa jayega😊😊

    • @aruntamil6527
      @aruntamil6527 ปีที่แล้ว

      Bankrupt ho jayega

    • @futureprenur9594
      @futureprenur9594 ปีที่แล้ว +2

      @@aruntamil6527 kon ? India has more than enough money if it wants to aquire we can acquire even 3000 planes it just needs proper planning n no planes not aquired overnight it happens over 5-10 years during which economy n cash flow also grows we are right now a 3.7 trillion usd economy and in next 5 years we will be 8-9 trilllion economy

    • @atharvzemse6599
      @atharvzemse6599 ปีที่แล้ว

      @@futureprenur9594 USA with its 800 billion budget has 3000 fighters. Even if we produce 50 fighter per year then it will take 60 years.

    • @futureprenur9594
      @futureprenur9594 ปีที่แล้ว +1

      @@atharvzemse6599 usa has 13000 fighter planes n bombers usa navy alone has 90 planes on each aircraft carrier and then some ... So 3000 planes is much less India like usa can go for 3-4 types of planes with multiple production lines of 50-100 planes per year based on big order and no cost is too great if we have to keep our country safe and our economy is growing as it grows so will threats from our enemies so to counter that India has to spend more on defence we can easily spend atleast 120 billion USD a year and gradually increase it as our economy increases take it to 3 percent of our gdp

  • @rohitnarang638
    @rohitnarang638 10 หลายเดือนก่อน

    Very good 👍👍👍👍👍

  • @rohitnarang638
    @rohitnarang638 10 หลายเดือนก่อน

    मोदी जी की तारीफ के लिए शब्द भी कम पड़ते हैं ❤❤

  • @kingshukmukherji5100
    @kingshukmukherji5100 10 หลายเดือนก่อน

    Bharat Mata ki Jai 🇮🇳🙏

  • @banglamarvel4649
    @banglamarvel4649 ปีที่แล้ว

    Better then f-22 Raptor jai hind 💚

  • @praveenahakey2865
    @praveenahakey2865 5 หลายเดือนก่อน

    Yr mujhe to TDBF DACE BASE kb bnayenge uska intjar he tejas ka degine old he TDBF lgta he yr fighter jet to

  • @samirmallik8070
    @samirmallik8070 ปีที่แล้ว

    Bharat mata ki joy joy hind

  • @vinaychauhan1312
    @vinaychauhan1312 ปีที่แล้ว

    IAF can be strong only if 10-15 about private companies involved with HAL,and DRDO companies..because it will minimizes delay in production and flight testing..our govt should increase defense budget about 60% and technology transfer from russia,and america,france..govt should give tendor for manufacturing metal,seat ejection,cockpit,and kaveri engine pending programe to TATA and mahindra like big companies..tejas mk 2,AMCA is best fighter plane for IAF..i hope about 12 squadron of Tejas mk 2 variant(about 200+ fighter),10 sqaudron of AMCA(180+ fighter plane), 8 squadron rafale(140+ fighterplane),6 sqadron of su 57 5th generation russian plane(100+),5 squadron mig 35(90+), we required these all now and for future we have to work and research on future aircrafts if we want superpower regarding national and international security than we should do reforms we our tech and research..no. of diffrent varities of fighter plane does matter for strenght of airpower and IAF..

  • @tassartanang117
    @tassartanang117 ปีที่แล้ว

    Kab se flying hoga Tejas mark2 .srif media mein he dekhate hai.

  • @yogendragurjar2346
    @yogendragurjar2346 ปีที่แล้ว

    GE 404 and 414 ka dimension same hai to hum MK1A m 414 kyu use nhi karte extra power milegi local bhi banega
    Mk2 mein 414 enhance power version 117KN kyu use nhi karte

  • @avijitrakshit6864
    @avijitrakshit6864 ปีที่แล้ว

    L.C.A. JAY HIND 🇮🇳🇮🇳🇮🇳

  • @uvg319
    @uvg319 ปีที่แล้ว +1

    Ted BF is equally important if we want a twin engine amca. For air superiority this is paramount.

    • @suryanshsagar2677
      @suryanshsagar2677 9 หลายเดือนก่อน

      Both are being developed together

  • @Space_Odyssey37
    @Space_Odyssey37 ปีที่แล้ว +1

    Tejas mk 2 -2030 ke baad hi production me aa payega.

    • @nipurnbandi9114
      @nipurnbandi9114 ปีที่แล้ว

      2050 ma 100 bnnn payega agr itna slow chalega too

  • @sandeepkasar4176
    @sandeepkasar4176 ปีที่แล้ว

    Mark २ must have twin engin configuration .

  • @rahulg2915
    @rahulg2915 ปีที่แล้ว

    🇮🇳🇮🇳🇮🇳🕉️🕉️🕉️🚀🚀🚀

  • @shantanuchauhan8376
    @shantanuchauhan8376 ปีที่แล้ว

    Using Gripen clips in your video

  • @praveenahakey2865
    @praveenahakey2865 5 หลายเดือนก่อน

    Teja mk 2 me engin or canard wings ke alawa degine me koi change nhi fir log samosa bolte he to bura lgta he

  • @blackworld917
    @blackworld917 ปีที่แล้ว

    AMCA project any update

  • @hemangshah4521
    @hemangshah4521 ปีที่แล้ว +1

    2030 ki baat bad me ab kya?
    104 fighter jet ki deal mevitna delay kyo?

    • @nipurnbandi9114
      @nipurnbandi9114 ปีที่แล้ว

      2050 taak 104 bnega aisa hii chlta rha too

  • @RakeshManikmwn_in
    @RakeshManikmwn_in ปีที่แล้ว +1

    Tejas mk2 ki baatein sunte hue ek lamba samay ho chuka hai. Pata nhi ye kab udega !!!
    Aaj sara vishwa fifth & sixth generation ki taiyari me hai aur hum abhi tak 4.5 gen ka aircraft bhi theek se nhi bana paaye. Kami kahan hai aur hum use deer kyon nhi karte. Humare charon taraf dushmanon ki kami nhi hai, aise me hume unnat kism ke aadhunik aircraft jald hi apne bede me shamil karne ki aawashyakta hai.

    • @nipurnbandi9114
      @nipurnbandi9114 ปีที่แล้ว +1

      AMCA for 5th generation and TED for 6th generation plane kiyaa jaa rha haai but yee sbb hote hote 2050 lgg jayga puri IAF ki requirement fulfil hone ma.

    • @gonysharma
      @gonysharma ปีที่แล้ว

      Bai maano ya na maano inn sab k piche hmara government ka ghatia system hai...sab chor hain inko india ki safety ki kam apni kursi ki jyada fikar hoti hai..

  • @rahulg2915
    @rahulg2915 ปีที่แล้ว

    Tejas mark 2 twin engine hoga ?

  • @prasannbhatmirjan7057
    @prasannbhatmirjan7057 11 หลายเดือนก่อน

    TEDBF TWIN ENGINE MORE ADVANCED, MORE STRONGER THAN MK2

    • @prakashgovekar7020
      @prakashgovekar7020 10 หลายเดือนก่อน

      लेकीन और कितने साल लेगा मॅन्युफॅक्चर करने में ?

  • @jenitrshah
    @jenitrshah ปีที่แล้ว

    Tejas MK-2 yet not ready and you are talking about orders. It will be ready after 2030.

  • @anilraman2575
    @anilraman2575 ปีที่แล้ว

    शायद सरकार को ये जेट इंजन से जुड़ी खबरें छुपानी चाहिये।

    • @India-or2so
      @India-or2so ปีที่แล้ว

      क्यू

    • @anilraman2575
      @anilraman2575 ปีที่แล้ว

      @@India-or2so क्योंकि दुश्मनों को भी ये बातें पता चल जाती हैं।जब भारत इंजन बनाना सीख जाएगा तो सबको अपनेआप ही पता चल जाएगा।पहले बातों को छुपाना चाहिये।

  • @pcom9209
    @pcom9209 ปีที่แล้ว

    TOY FOR AIR FORCE TO PLAY . IAF NEEDS 200 RAFALES & 200 5TH GEN FIGHTER AIRCRAFTS,
    & FAST. NOT IN 30 YRS, BUT IN 5 YRS. !!
    THERE IS STILL VERY LESS FUNDING ON R&D, MORE ON USELESS SHORTSIGHTED VOTE SCHEMES.?

  • @dipokchanda6828
    @dipokchanda6828 ปีที่แล้ว

    india ko f16 jasa model fighter jet banana chaya tejas jet not good

  • @shankygulati9909
    @shankygulati9909 ปีที่แล้ว

    Mk 2 ,doul engine chiye tha

    • @kartikeykasniya6971
      @kartikeykasniya6971 ปีที่แล้ว +6

      It increases maintanence and operating cost. Single engine make for better workhorse for airforces.
      That's why even US forces use F16 in big numbers.

    • @UnknownManFU
      @UnknownManFU ปีที่แล้ว +1

      I think twin engine hota toh
      Orr delay hota
      Mk1a ki assembly line hi ho jayega sayadd
      Or maybe budget friendly hone ke liya single engine use kiya

    • @yafoor4660
      @yafoor4660 ปีที่แล้ว

      IAF will demand twin engine Tejas MK2 to further delay it. IAF is waiting for the right time.

    • @pcom9209
      @pcom9209 ปีที่แล้ว

      TOY FOR AIR FORCE TO PLAY . IAF NEEDS 200 RAFALES & 200 5TH GEN FIGHTER AIRCRAFTS,
      & FAST. NOT IN 30 YRS, BUT IN 5 YRS. !!
      THERE IS STILL VERY LESS FUNDING ON R&D, MORE ON USELESS SHORTSIGHTED VOTE SCHEMES.?

    • @asmodeus3084
      @asmodeus3084 ปีที่แล้ว

      Jab humara khud ka engine hoga tab twin engine dependable hoga, nhi to bas hum foreign dependence 2x kar rhe h.

  • @balrajseth6310
    @balrajseth6310 ปีที่แล้ว

    Nothing new in this episode

  • @Sans_K5
    @Sans_K5 ปีที่แล้ว

    these endless projects🥲

  • @TheLargeoldshoe
    @TheLargeoldshoe ปีที่แล้ว

    plane abhe tak ek banaya bhi nahin aur already shuru hai better than rafale.. toh aur rafale kyon kharidi kar rahen hon?? Band karo yeh sab bakwas. pehle plane banao..

  • @prasanjitpal8739
    @prasanjitpal8739 ปีที่แล้ว

    Koi bhi desh ab tak ise nahi purchase kiya hain..or order place kiya gaya hain..godi media

    • @utpaldey9910
      @utpaldey9910 ปีที่แล้ว +2

      Ek dam sahi jagah me mirchi laga. Foreign arms dealing se commissions bandh ho gya aab to mirchi lage ga hi.

    • @unknown_5107
      @unknown_5107 ปีที่แล้ว +3

      Pahle mass production me to aa jane do fir Gyan do,iaf bhi abhi sirf 32 mk1 hi operate karti hai to kaise koi order dega,vaise Tejas mk1 ki first flight 2001 me conduct huyi thi,aur induction bjp ke Ane ke bad 2016 me hi hua tha ab ispe kya kahoge .Rahi baat exports ki to abhi bhi Argentina, Egypt aur Botswana abhi bhi Tejas kharid sakte hai final decision Ane sr pahle Gyan pelna faltu hai .

    • @utpaldey9910
      @utpaldey9910 ปีที่แล้ว

      @@unknown_5107 yeh log fighter aircraft technology jaanta hi nahi. Ek fighter aircraft banane me 7-8 months lagta then different types taxi trials then flight trials. Means complete aircraft 10-11 months.

    • @sunnybunny-z3k
      @sunnybunny-z3k ปีที่แล้ว

      Yaha baat dusre Desh ko bechne ki nahi ho rahi . Baat iske induction aur trials ki ho rahi hai😂😂

    • @vinodkaka5225
      @vinodkaka5225 ปีที่แล้ว

      ​@@utpaldey9910tuje pta bi he Godi media term Konse loogo be invent ki he vehi haraamkhor media vaale Aur haraamzaade journalists jinhone Sabse pehle india me Government ki Godh me kese bethte he ye uni loogo ne shuru kia ye vo lifafa journalists he Aur corrupt media chennals he jo Scamgress party ke rule ke samay me bde bde ministers ki Godh me betha karte the aur apne media chennals ke studios me beth kr kis kis ko minister bnvana he kisko bahir bithaana he yehi loog Apne studios se decide karte he Scamgress party Govt se bde bde contracts & favour lia karte the aur jabse 2014 me sarkaar badli hui aur insbi corrupt media & lifafa journalists ki gaand me Laat maar kr bgga dia gya to tb inko Godhi media yaad aaya jabki Godh me bethne ka culture india me Sabse pehle insbi loogo ne hi shuru kia tha jo aaj dusro ko Godhi media pukarte he.. The Hypocrite Bastards

  • @rpsoni1088
    @rpsoni1088 ปีที่แล้ว +1

    When will Tejas mk 2 fly?
    Perhaps in 2045

  • @mohitsingh3378
    @mohitsingh3378 ปีที่แล้ว

    Tejas mk 2 yeh sunte sunte... Ab budhapa agaya hai.. Hahahaha.. Kuch ni bna sakta india..