View from future home
Subic Bay House Build Ep 57
The view from Ian's final floor roof deck is incredible. My house second floor walls going up. Final shape is taking place for both houses.
มุมมอง: 81
วีดีโอ
Subic Bay House Build Ep 56
มุมมอง 2634 ชั่วโมงที่ผ่านมา
All Hands on Deck that is Ian's roof deck. Every crew member was pitching in on the bucket brigade as the workers pour the rood deck one bucket at a time.
Subic Bay House Build Ep 55 part 1
มุมมอง 12412 ชั่วโมงที่ผ่านมา
In this update my house is getting second floor walls beginning to go up and Ian's house is ready for his final roof deck floor to be poured. went long so part 2 has meeting with our builder Bhong and some drone footage.
Subic Bay House Build Ep 55 part 2
มุมมอง 12912 ชั่วโมงที่ผ่านมา
For part 2 we meet our builder Bhong of BJ Steel. Discussions on our change requests. Then I have some drone footage, with some voice over for context.
Subic Bay House Build Ep 54
มุมมอง 11119 ชั่วโมงที่ผ่านมา
The excitement is getting more each day as walls go up and new floors get added. Drone footage included because it is getting harder to climb to higher floors without completed stairs.
Subic Bay House Build EP 53 part 2
มุมมอง 31114 วันที่ผ่านมา
This second part was our interview with LidGuard Solar as he came out to survey both homes for a Solar installation. There is not even a question that we will have solar only what company and what type of system.
Subic Bay House Build Ep 53 part 1
มุมมอง 12114 วันที่ผ่านมา
We review plans for both houses. Showing the technique how they cover the concrete block and prepare for the final coat. Sol answers my question about the septic tank clean out.
Subic Bay House Build Ep 52
มุมมอง 16514 วันที่ผ่านมา
Last site visit of 2024. Review of current status of both houses. All the workers have the day off so an uninterrupted site visit and all quite no construction noise.
Subic Bay House Build Ep 51 pt 1
มุมมอง 1.3K21 วันที่ผ่านมา
Return to build after Christmas. My second floor ready begin pour after the first of the year. Ian's second floor nearing completion and preparation for roof deck pour begins.
Subic Bay House Build Ep 51 pt 2
มุมมอง 19321 วันที่ผ่านมา
Second part of Fridays videos. This includes drone footage from above the build sites looking down on both houses.
Subic Bay House Build Ep 50
มุมมอง 21128 วันที่ผ่านมา
This was a special visit as we celebrated Christmas with the workers, Ian prepare a meal to share and we gave them all a small gift.
Subic Bay House Build Ep 49
มุมมอง 13228 วันที่ผ่านมา
Second floor of Ian's house takes shape. Preparation for my second floor is underway. Views are spectacular from both houses.
Subic Bay House Build Ep 48
มุมมอง 312หลายเดือนก่อน
Work on Ian's second floor is in full mode, while the framing in preparation for my second floor is under way.
Subic Bay House Build Ep 47
มุมมอง 266หลายเดือนก่อน
Give you a very good video both inside and out of both houses as they go up. A little drone footage to get some overview as well.
Subic House Build Ep 46
มุมมอง 135หลายเดือนก่อน
Provide you some drone footage with overhead of the construction Ian's second floor poured.