Pipeline Installation for Inspectors Online Course (Promo)
This course provides 14 hours of training for inspectors working on open-cut buried pipeline projects. Topics include: excavation, bedding, embedment, backfill, soil density, soil compaction, soil classification, soil migration, and flowable fill. This video provides details on what's included and what will be covered. Course has chapter-by-chapter assessments and provides PDHs.
มุมมอง: 42

วีดีโอ

Problems in Video Inspection of Pipelines
มุมมอง 3ปีที่แล้ว
Problems in Video Inspection of Pipelines
The Big Break - Concrete Cylinder Break (3ft by 6ft)
มุมมอง 11ปีที่แล้ว
The Big Break - Concrete Cylinder Break (3ft by 6ft)
Estimating Percent Sand in a Soil
มุมมอง 855 ปีที่แล้ว
The Soil Syringe Method was developed by Amster Howard as a way to determine the percent of sands and the percent of fines in a soil.
Pipe Deflection
มุมมอง 1.2K6 ปีที่แล้ว
Description
Diggability of Flowable Fill
มุมมอง 5K8 ปีที่แล้ว
The excavation of 30 day old flowable fill is shown. Flowable fill should have a compressive strength between 20 and 80 psi (150 to 600 kPa) so that it can be easily excavated for repairs, future installations, etc.
Mounding (Why Not To)
มุมมอง 958 ปีที่แล้ว
The ill-advised method of mounding used to install pipe is shown. The pipe is supported on each end on a mound of soil. This is done to place the pipe at a certain elevation. Since it is practically impossible to compact beneath the pipe, a loose zone between the mounds results. The mounds may end up as hard spots creating point loading on the pipe. See more in "Pipeline Installation 2.0", a bo...
Spread Test for Flowable Fill
มุมมอง 6K8 ปีที่แล้ว
Illustrates the procedure in ASTM D 6103 " Flow Consistency of CLSM." A 3-inch by 6-inch cylinder is filled with flowable fill and raised. The mixture consistency should result in an 8- inch to 12- inch diameter patty.
Vibrating Hammer
มุมมอง 6K9 ปีที่แล้ว
Vibrating Hammer
Laser Profile Inspection of Flexible Sanitary Sewer Pipe
มุมมอง 1.9K10 ปีที่แล้ว
Laser profile of PVC pipe interior showing local deformation of pipe as camera traverses pipe. Camera is advanced 37 ft through the pipe with the laser profile instrumentation documenting the deflection. Video clip courtesy of CUES, Inc. (www.cuesinc.com)
Creating Lack of Support in Pipe Haunch
มุมมอง 6410 ปีที่แล้ว
Demonstrates how the angle of repose of crushed rock creates a void in a pipe haunch when the rock is dumped in beside the pipe. Without shovel slicing or compaction, the void means there is not support for the pipe in the haunch area. Note that when the slope of the crushed rock contacts the pipe, no more rock is able to move under the pipe
MH Elastic Silt
มุมมอง 3K13 ปีที่แล้ว
construction involving MH, Elastic Sitl, a highly compressible soil. Also known as Bull's Liver
Barnard Trench-Side Flowable Fill Mixing
มุมมอง 53713 ปีที่แล้ว
Barnard Trench-Side Flowable Fill Mixing
Flowable Fill Soil Processor for Pipeline Installation
มุมมอง 1.1K13 ปีที่แล้ว
The video shows processing spoil from a pipeline and mixing it with cement and water to make Flowable Fill and refilling the trench.. The machine can process clayey soils as well as sandy soils.This video is from the ASCE Continuing Education Seminar on "Design and Installation of Buried Pipe." Amster Howard presents the portion on installation. His book, "Pipeline Installation" has sold more t...
Saturation and Vibration in Pipeline Installation
มุมมอง 75913 ปีที่แล้ว
The video shows the process of densifying soils by saturation and vibration. NO SOUND This video is from a ASCE Continuing Education Seminar on "Design and Installation of Buried Pipe." The portion on Installation is taught by Amster Howard. His book, "Pipeline Installation" has sold more than 3,000 copies worldwide and continues to be the most popular publication on the topic. More information...