Singapore Trains Channel
Singapore Trains Channel
  • 1 569
  • 1 497 698
[Very Late][SMRT] C151 (113/114) departing Tanah Merah
Recorded on 16/05/2024
-Train Details
C151 (113/114) (Batch 2)
Build By: Kawasaki Heavy Industries & Nippon Sharyo
Year Build: 1988
Year Entered Service: 1988
Year Refurbished: 2008
Year Retired: 2024
Traction Control: GTO Chopper (Mitsubishi Electric)
TRN: 117
Destination: Pasir Ris
113/114 was so far behind schedule that the back train was directly behind it.
If you have any enquire you can send me an email:
singaporetrainschannel@gmail.com
Follow me on Instagram:
singapore_trains_channel
มุมมอง: 185

วีดีโอ

[From Bad To Worst][SMRT] C751B (317/318) from Tanah Merah to Bedok
มุมมอง 28720 ชั่วโมงที่ผ่านมา
Recorded on 11/07/2024 -Train Details C751B (317/318) Build By: Nippon Sharyo Year Build: 2000 Year Entered Service: 2000 Year Refurbished: N/A Traction Control: IGBT-VVVF (Fuji Electric) TRN: 151 Destination: Tuas Link It seems like the motor at Car 1318 Door A4 has gotten from bad to worst. 317/318 is 1 of the remaining 4 C751B trains left. If you have any enquire you can send me an email: si...
[One Step Brake][SMRT] C151A (521/522) from Tanah Merah to Changi Airport
มุมมอง 2982 ชั่วโมงที่ผ่านมา
Recorded on 22/07/2024 -Train Details C151A (521/522) (Batch 1) Build By: Kawasaki Heavy Industries & CSR Qingdao Sifang Year Build: 2011 Year Entered Service: 2011 Year Refurbished: N/A Traction Control: IGBT-VVVF (Fuji Electric) TRN: 103 Destination: Changi Airport If you have any enquire you can send me an email: singaporetrainschannel@gmail.com Follow me on Instagram: singapor...
[No KHI][SMRT] C151A (521/522) & R151 (849/850) departing Expo
มุมมอง 3534 ชั่วโมงที่ผ่านมา
Recorded on 22/07/2024 -Train Details C151A (521/522) (Batch 1) Build By: Kawasaki Heavy Industries & CSR Qingdao Sifang Year Build: 2011 Year Entered Service: 2011 Year Refurbished: N/A Traction Control: IGBT-VVVF (Fuji Electric) TRN: 103 Destination: Tanah Merah -Train Details R151 (849/850) (Batch 1) Build By: Changchun Alstom Railway Vehicles Co. Ltd. Year Build: 2022 Year Entered Service: ...
[Via TNM A][SMRT] C151 (053/054) from Tanah Merah to Expo
มุมมอง 3629 ชั่วโมงที่ผ่านมา
Recorded on 19/07/2024 -Train Details C151 (053/054) (Batch 2) Build By: Kawasaki Heavy Industries Year Build: 1988 Year Entered Service: 1988 Year Refurbished: 2008 Traction Control: GTO Chopper (Mitsubishi Electric) TRN: 103 Destination: Changi Airport (Via TNM A) Due to a track fault at Tanah Merah Platform B, trains heading towards Changi Airport would go via Tanah Merah Platform A. -Route ...
[Via TNM C & D][SMRT] R151 (807/808) from Simei to Bedok
มุมมอง 3379 ชั่วโมงที่ผ่านมา
Recorded on 19/07/2024 -Train Details R151 (807/808) (Batch 1) Build By: Changchun Alstom Railway Vehicles Co. Ltd. Year Build: 2020 → 2022 Year Entered Service: 2023 Year Refurbished: N/A Traction Control: SiC-VVVF (Alstom MITrac TC 1500) TRN: 125 Destination: Bedok → Tuas Link Due to a track fault at Tanah Merah Platform B, all trains towards the City and Tuas Link were diverted towards Platf...
[Skip Station Annc][SMRT] R151 (853/854) from Tanah Merah to Expo
มุมมอง 1.2K9 ชั่วโมงที่ผ่านมา
Recorded on 19/07/2024 -Train Details R151 (853/854) (Batch 1) Build By: Changchun Alstom Railway Vehicles Co. Ltd. Year Build: 2022 Year Entered Service: 2024 Year Refurbished: N/A Traction Control: SiC-VVVF (Alstom MITrac TC 1500) TRN: 102 → 101 Destination: Changi Airport (Via TNM A) Due to a track fault at Tanah Merah Platform B, trains heading towards Changi Airport would go via Tanah Mera...
[Mini Alien][SMRT] C801B (135/136) at Keat Hong
มุมมอง 6K12 ชั่วโมงที่ผ่านมา
Recorded on 19/07/2024 -Train Details C801B (135/136) Build By: CRRC Puzhen Alstom Transportation Systems Co., Ltd. Year Build: 2022 Year Entered Service: 2024* Year Refurbished: N/A Traction Control: IGBT-VVVF (Bombardier MITRAC 500) Service: Service B (Test Train) (* is to denote that the estimated year 135/136 is going to enter service might change) With C801B trains starting their day time ...
[Sole Old Logo KNS][SMRT] C751B (335/336) arriving Tanah Merah
มุมมอง 50512 ชั่วโมงที่ผ่านมา
Recorded on 18/07/2024 -Train Details C751B (335/336) Build By: Nippon Sharyo Year Build: 2000 Year Entered Service: 2000 Year Refurbished: N/A Traction Control: IGBT-VVVF (Fuji Electric) TRN: 141 Destination: Changi Depot (Off Service) 335 is the last C751B train to have the Old Logo pasted on the Emergency Detrainment Ramp. 335/336 is 1 of the remaining 4 C751B trains left. If you have any en...
[WB Arrival Melody Full Version][SMRT] R151 (805/806) arriving Expo
มุมมอง 44814 ชั่วโมงที่ผ่านมา
Recorded on 18/07/2024 -Train Details R151 (805/806) (Batch 1) Build By: Changchun Alstom Railway Vehicles Co. Ltd. Year Build: 2020 → 2022 Year Entered Service: 2023 Year Refurbished: N/A Traction Control: SiC-VVVF (Alstom MITrac TC 1500) TRN: 102 The arrival melody played at underground stations and Expo is the full version. If you have any enquire you can send me an email: singaporetrainscha...
[Might Be A While][SMRT] R151 (847/848) from Expo to Tanah Merah
มุมมอง 31614 ชั่วโมงที่ผ่านมา
Recorded on 11/07/2024 -Train Details R151 (847/848) (Batch 1) Build By: Changchun Alstom Railway Vehicles Co. Ltd. Year Build: 2022 Year Entered Service: 2024 Year Refurbished: N/A Motor: SiC-VVVF (Alstom MITrac TC 1500) TRN: 102 Destination: Tanah Merah It might be a while before we see 847/848 run on CGL as it is currently on NSL. If you have any enquire you can send me an email: singaporetr...
[No Wi-Fi][SMRT] C151 (127/128) arriving Redhill
มุมมอง 37316 ชั่วโมงที่ผ่านมา
Recorded on 03/07/2024 -Train Details C151 (127/128) (Batch 2) Build By: Kawasaki Heavy Industries & Tokyu Car Crop. Year Build: 1989 Year Entered Service: 1989 Year Refurbished: 2008 Motor: GTO Chopper (Mitsubishi Electric) TRN: 331 Destination: Pasir Ris Due to Wi-Fi equipment maintenance works, there won’t be any Wi-Fi service at stations. Wi-Fi service would resume from end October 2024. If...
[Through Service][JR East] E231-800 Series (K2) departing Ōtemachi
มุมมอง 15419 ชั่วโมงที่ผ่านมา
[Through Service][JR East] E231-800 Series (K2) departing Ōtemachi
[EB Arrival Melody Shorter Version][SMRT] C651 (201/202) arriving Bedok
มุมมอง 48421 ชั่วโมงที่ผ่านมา
[EB Arrival Melody Shorter Version][SMRT] C651 (201/202) arriving Bedok
[WB Arrival Melody Shorter Version][SMRT] C651 (201/202) departing Bedok
มุมมอง 49621 ชั่วโมงที่ผ่านมา
[WB Arrival Melody Shorter Version][SMRT] C651 (201/202) departing Bedok
[CGL When?][SMRT] C751B (337/338) departing Tanah Merah
มุมมอง 420วันที่ผ่านมา
[CGL When?][SMRT] C751B (337/338) departing Tanah Merah
[Resume Testing][SMRT] R151 (855/856) at Tuas Crescent
มุมมอง 927วันที่ผ่านมา
[Resume Testing][SMRT] R151 (855/856) at Tuas Crescent
[Finally Back][SMRT] C651 (207/208) from Tanah Merah to Simei
มุมมอง 490วันที่ผ่านมา
[Finally Back][SMRT] C651 (207/208) from Tanah Merah to Simei
[Throughly Cleaned][SMRT] R151 (823/824) from Expo to Tanah Merah
มุมมอง 487วันที่ผ่านมา
[Throughly Cleaned][SMRT] R151 (823/824) from Expo to Tanah Merah
[Sunrise Sento][JR Central] 285 Series (I3) from Takamatsu to Tōkyō
มุมมอง 14214 วันที่ผ่านมา
[Sunrise Sento][JR Central] 285 Series (I3) from Takamatsu to Tōkyō
[Cannibalize Parts?][SMRT] C151 (037/038) from Bugis to Lavender
มุมมอง 44614 วันที่ผ่านมา
[Cannibalize Parts?][SMRT] C151 (037/038) from Bugis to Lavender
[JR East] E235-0 Series (43) at Hamamatsuchō
มุมมอง 15014 วันที่ผ่านมา
[JR East] E235-0 Series (43) at Hamamatsuchō
[NE Show 2][SMRT] C151 (109/110) at Kembangan
มุมมอง 36014 วันที่ผ่านมา
[NE Show 2][SMRT] C151 (109/110) at Kembangan
[Singapore’s Yamanote Line?][SMRT] R151 (851/852) arriving Tanah Merah
มุมมอง 82714 วันที่ผ่านมา
[Singapore’s Yamanote Line?][SMRT] R151 (851/852) arriving Tanah Merah
[GTO-VVVF][JR East] 209-1000 Series (81) departing Kanda
มุมมอง 17414 วันที่ผ่านมา
[GTO-VVVF][JR East] 209-1000 Series (81) departing Kanda
[The Original Airport Express][SMRT] C751B (311/312) from Tanah Merah to Changi Airport
มุมมอง 58614 วันที่ผ่านมา
[The Original Airport Express][SMRT] C751B (311/312) from Tanah Merah to Changi Airport
[No PSD][JR East] E235-0 Series (06) at Shinjuku
มุมมอง 21914 วันที่ผ่านมา
[No PSD][JR East] E235-0 Series (06) at Shinjuku
[Low Chance][SMRT] C651 (201/202) arriving Tanah Merah
มุมมอง 48914 วันที่ผ่านมา
[Low Chance][SMRT] C651 (201/202) arriving Tanah Merah
[What A Mess][SMRT] C151 (125/126) at Clementi
มุมมอง 65414 วันที่ผ่านมา
[What A Mess][SMRT] C151 (125/126) at Clementi
[T417][SMRT] R151 (815/816) arriving Yio Chu Kang
มุมมอง 42014 วันที่ผ่านมา
[T417][SMRT] R151 (815/816) arriving Yio Chu Kang

ความคิดเห็น

  • @hotmixer2010
    @hotmixer2010 2 ชั่วโมงที่ผ่านมา

    Such a high quality train and LTA wants to scrap it when it first entered service the performance was excellent still remember the new smell in 2001

  • @TheRexLowGamingDev
    @TheRexLowGamingDev 9 ชั่วโมงที่ผ่านมา

    Wait this set retired?

  • @TanKiatEnJaydenCcss
    @TanKiatEnJaydenCcss 10 ชั่วโมงที่ผ่านมา

    KNS C751B trains lives are at stake

  • @the-real-lol3629
    @the-real-lol3629 10 ชั่วโมงที่ผ่านมา

    Robotic is getting worse and much messy each day

    • @the-real-lol3629
      @the-real-lol3629 10 ชั่วโมงที่ผ่านมา

      At this point the chances of dying is higher

  • @Swift24905
    @Swift24905 11 ชั่วโมงที่ผ่านมา

    113/114 is now 🪦💀RIP

  • @TanKiatEnJaydenCcss
    @TanKiatEnJaydenCcss 12 ชั่วโมงที่ผ่านมา

    My rep

    • @Swift24905
      @Swift24905 11 ชั่วโมงที่ผ่านมา

      Just Retired Today…..

  • @Service861
    @Service861 18 ชั่วโมงที่ผ่านมา

    Fix the train.

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 16 ชั่วโมงที่ผ่านมา

      At this point with on 4 KNS trains they might not fix it since it is gonna retire very soon.

    • @Service861
      @Service861 13 ชั่วโมงที่ผ่านมา

      @@SingaporeTrainsChannel What?!

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 13 ชั่วโมงที่ผ่านมา

      They are retiring mah, unless it is something very serious it wont make sense to fix something which would be decommissioned very soon.

  • @MRTinSG
    @MRTinSG 19 ชั่วโมงที่ผ่านมา

    What's wrong? The flatwheels?

  • @SGrailadventure2004
    @SGrailadventure2004 19 ชั่วโมงที่ผ่านมา

    Can hear a SIE inside the KNS wow. For this KNS, it might be a sign of retirement soon if not handled and maintained properly

  • @HTtwentyten
    @HTtwentyten 22 ชั่วโมงที่ผ่านมา

    BP LRT is hands-down the coolest rail line in Singapore. May it continue to run for generations!

  • @SGrailadventure2004
    @SGrailadventure2004 วันที่ผ่านมา

    Until the KHI fleet have been fully decommissioned

  • @svc317bsoe
    @svc317bsoe 2 วันที่ผ่านมา

    isnt it a c830c

  • @user-xd2gy5yp5l
    @user-xd2gy5yp5l 3 วันที่ผ่านมา

    Taking forever to roll out. Its been over 2 years right? What a joke.

  • @EonityLuna
    @EonityLuna 4 วันที่ผ่านมา

    Sounds like it will have a new propulsion system as well.

  • @EonityLuna
    @EonityLuna 4 วันที่ผ่านมา

    Wait. How are the trains even being rerouted here? Why are Changi Airport branch line trains reversing and passing through Tanah Merah twice?

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 3 วันที่ผ่านมา

      CGL trains cannot turn at Platform C & D because there are WB trains behind queuing up to enter.

  • @TheRexLowGamingDev
    @TheRexLowGamingDev 4 วันที่ผ่านมา

    Was the fault happening for the entire day

  • @ChongLeTianGyss
    @ChongLeTianGyss 4 วันที่ผ่านมา

    haha

  • @smasherplaysrb4958
    @smasherplaysrb4958 4 วันที่ผ่านมา

    That time, Westbound trains use that middle platform?

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 4 วันที่ผ่านมา

      Yes, basically WB trains & CGL trains shared Platform C & D.

  • @TransportationONLY
    @TransportationONLY 4 วันที่ผ่านมา

    The motor sounds abit like the R151, it’s uncanny!

  • @WLTransit100
    @WLTransit100 4 วันที่ผ่านมา

    Oh, no wonder I saw an R151 switch tracks yesterday at Expo! I was in Bus 118 recording then saw it, very unusual.

  • @eeveelover8745
    @eeveelover8745 4 วันที่ผ่านมา

    When i was riding CGL, I realised T101 was in AM R151 819/820

  • @SShiJie
    @SShiJie 4 วันที่ผ่านมา

    The new boi's looking slick🔥

  • @Sandrew36342
    @Sandrew36342 4 วันที่ผ่านมา

    They are copying something…

  • @TEL4life
    @TEL4life 4 วันที่ผ่านมา

    Were trains on ATPM then during this arrangement?

  • @Plane_guy_crash
    @Plane_guy_crash 4 วันที่ผ่านมา

    I poop my pants when i saw the video

  • @SG5920A
    @SG5920A 4 วันที่ผ่านมา

    I was riding r151 853/854 from cga-tm but it did not skip tm

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 4 วันที่ผ่านมา

      Probably you rode it before TNM B had the track fault.

    • @SG5920A
      @SG5920A 4 วันที่ผ่านมา

      @@SingaporeTrainsChannel oh

  • @ZhaoZimingPl
    @ZhaoZimingPl 4 วันที่ผ่านมา

    How exactly do the trains bound for Changi Airport enter Tanah Merah Platform A? Is it through wrong-railing?

  • @SBS8338A_PRODUCTIONS
    @SBS8338A_PRODUCTIONS 4 วันที่ผ่านมา

    What day is the c810b gonna debut I'M SO EXCITED \(≧▽≦)/

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 4 วันที่ผ่านมา

      LTA should be announcing it soon since C801B is targeted to debut in Q3 2024.

  • @engchoontan8483
    @engchoontan8483 5 วันที่ผ่านมา

    JB autonomous bus by german-tech ST-engineering Made-in-china under train-business brand-model coach-builder and aircraft aerospace inputs can plus a few more models before deciding. 14-footer deck head 24-footer deck head small-medium 24-footer deck head large-and-trailer head roll-cage is 3x excavator-small gondola is ... cable-car-cabin is 3x front and 3x rear and extended wheel-base roll-cage to extended-chassis(not flat but trailer design and specs) wheeled and track - maintenance and logistics and rubbish-car towed. front is half height or one third height - funicular for up-down slope-incline grip+propulsion+acceleration+deceleration corner is vertical pipe and beach walkway awning lamp-cluster. corners of roll-cage are concaved for pipe and lamps model plus-plus

  • @mightyrainbow1003
    @mightyrainbow1003 5 วันที่ผ่านมา

    Exclusive

  • @hotmixer2010
    @hotmixer2010 5 วันที่ผ่านมา

    Made in China

    • @mrfoxesite
      @mrfoxesite 2 วันที่ผ่านมา

      no

    • @mrfoxesite
      @mrfoxesite 2 วันที่ผ่านมา

      or india

  • @christopheryongmenglee7569
    @christopheryongmenglee7569 5 วันที่ผ่านมา

    Is real C801B

  • @PhantomwolfReal
    @PhantomwolfReal 5 วันที่ผ่านมา

    Better than my videos :)

  • @TheRexLowGamingDev
    @TheRexLowGamingDev 5 วันที่ผ่านมา

    Is it the first time C801B does a Daytime test?

  • @Jeef_z
    @Jeef_z 5 วันที่ผ่านมา

    Cant wait until the debut🎉

  • @tomandmichael6049
    @tomandmichael6049 5 วันที่ผ่านมา

    [C801A 10 years after C801B] Debut?

  • @tomandmichael6049
    @tomandmichael6049 5 วันที่ผ่านมา

    C801A was deput 2014 now after 10 years ago C801B deput 2024 for this year

  • @Service861
    @Service861 5 วันที่ผ่านมา

    You saw me!:D

  • @singaporetransport1305
    @singaporetransport1305 5 วันที่ผ่านมา

    Alstom Innova APM 300R C801B

  • @MrColinTheBusDriver
    @MrColinTheBusDriver 5 วันที่ผ่านมา

    Has one strong motor

  • @MrColinTheBusDriver
    @MrColinTheBusDriver 5 วันที่ผ่านมา

    Sounds like R151

  • @SG2016E
    @SG2016E 5 วันที่ผ่านมา

    coming soon

  • @TRANSLASLionsCityMovia
    @TRANSLASLionsCityMovia 5 วันที่ผ่านมา

    Finally C801B gets new sound

  • @A_sus_c151c
    @A_sus_c151c 5 วันที่ผ่านมา

    It got sent back?

    • @SingaporeTrainsChannel
      @SingaporeTrainsChannel 5 วันที่ผ่านมา

      @@A_sus_c151c that is 133 & 134

    • @A_sus_c151c
      @A_sus_c151c 4 วันที่ผ่านมา

      @@SingaporeTrainsChannelI can’t believe some people actually think that set you mentioned will debut that set looks incomplete for debut

  • @Mesh_potato
    @Mesh_potato 5 วันที่ผ่านมา

    a squished r151 xXD

  • @94Princesi
    @94Princesi 5 วันที่ผ่านมา

    Wow finally see the little alien, hey do the C801B have the ATI?

  • @snhyper215
    @snhyper215 5 วันที่ผ่านมา

    Now we creating 2nd ailen huh

    • @Service861
      @Service861 5 วันที่ผ่านมา

      0:28: The second me.

  • @caja1491
    @caja1491 5 วันที่ผ่านมา

    Same as the new trains at Denver Airport.

  • @ChadAlnosoRacing
    @ChadAlnosoRacing 5 วันที่ผ่านมา

    Almost got a heart attack when i saw this. Can't wait for its debut now!

  • @Mesh_potato
    @Mesh_potato 6 วันที่ผ่านมา

    brand newerly brand new than a brand new train