  • Calculating the barrel length of a box culvert with soil cushion above requires consideration of both the structural design and the soil mechanics involved.
    Here are the general steps to follow:
    Determine the design loads and the required strength of the box culvert. This involves analyzing the expected traffic loads, hydraulic pressures, and other relevant factors. The required strength of the culvert will depend on the materials used, the dimensions of the box, and other design parameters.
    Determine the soil properties and the amount of soil cushion required. This involves analyzing the soil conditions at the site and determining the amount of soil cushion required to distribute the load from the box culvert to the soil.
    Use a structural analysis program to model the box culvert and calculate the required barrel length. The analysis should take into account the design loads, the strength of the box culvert, and the soil cushion.
    Check the deflection of the box culvert under load to ensure that it meets the allowable limits. The allowable deflection will depend on the design standards and the expected traffic loads.
    Revise the design as necessary to ensure that the box culvert meets the required strength and deflection criteria.
    Finalize the design and prepare the construction plans and specifications.
    In summary, calculating the barrel length of a box culvert with soil cushion requires a thorough analysis of both the structural and soil mechanics aspects of the design. A structural analysis program can be used to model the box culvert and calculate the required barrel length, but the analysis must also consider the soil conditions and the amount of soil cushion required.

ความคิดเห็น • 2

  • @shadabraza2976
    @shadabraza2976 ปีที่แล้ว

    hume pipe culvert ka v video banaiye sir with BOQ please

  • @SumitSingh-tu7ll
    @SumitSingh-tu7ll ปีที่แล้ว

    Sir invert always -300 from ground, not to eqal to ground