Difference between Specification Limits and Control Limits / IATF 16949 | HINDI | Bhavya Mangla

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 ม.ค. 2025

ความคิดเห็น • 20

  • @sanjaytekale5412
    @sanjaytekale5412 2 ปีที่แล้ว +1

    Thank you very much sir

    • @bhavyamangla
      @bhavyamangla  2 ปีที่แล้ว

      You are most Welcome, Sanjay

  • @samarmushtaq3979
    @samarmushtaq3979 ปีที่แล้ว +1

    Plz explain difference between natural tolerance limit and specification limit and control limit

    • @bhavyamangla
      @bhavyamangla  ปีที่แล้ว

      Dear Samar, Thanks for your query. Specification limit is voice of the customer and is given by them. Example: 5+\- 0.2.
      Control limit is voice of the process. It is calculated by organisation to Monitor the process (Upper and lower control limit). Example: 5.0 +\-3 sigma
      As per SPC manual, no natural limit is given . But in statistic, natural limit and control limits are same.

  • @devendrasarna1056
    @devendrasarna1056 2 ปีที่แล้ว +1

    Very nice

    • @bhavyamangla
      @bhavyamangla  2 ปีที่แล้ว

      Thanks Devendra for your feedback

  • @Bisht0104
    @Bisht0104 2 ปีที่แล้ว +1

    Very useful information

    • @bhavyamangla
      @bhavyamangla  2 ปีที่แล้ว

      Thanks Indra for your feedback

  • @GopiSat
    @GopiSat 3 ปีที่แล้ว +1

    It's very useful 👍

    • @bhavyamangla
      @bhavyamangla  3 ปีที่แล้ว

      Thanks for your feedback

  • @brijeshpandey2565
    @brijeshpandey2565 3 ปีที่แล้ว +1

    nice video sir...

  • @anshulkumargupta6474
    @anshulkumargupta6474 3 ปีที่แล้ว +2

    Weldon e sir

  • @mehuldodiya1943
    @mehuldodiya1943 2 ปีที่แล้ว +1

    TQM VIDEO PLS UPLOAD

    • @bhavyamangla
      @bhavyamangla  2 ปีที่แล้ว

      Thanks for the suggestion Mehul. What kind of Video is expected related to TQM? Please share

  • @datascience1274
    @datascience1274 ปีที่แล้ว

    Hi sir, I have a question. Are the specification limits always expressed in the project goal of the project charter? For instance, if the goal is reducing the waste of 1%, is it correct to consider this 1% less as a tolerance limit?

    • @bhavyamangla
      @bhavyamangla  ปีที่แล้ว

      Thanks for your query. In statistical studies, control limits are calculated ( UCL and LCL) based on the real data and it reflects the voice of the process. While specification limit is voice of the customer.

  • @AlokKumar-vd1dg
    @AlokKumar-vd1dg 3 ปีที่แล้ว +1

    ❤️