INTRODUCTION TO LEVELING | ONE.
ฝัง
- เผยแพร่เมื่อ 19 ก.ย. 2024
- In this video, you will learn how to use Dumpy level to transfer from DPC to other places, How to set up on another point and check for Backsight and Foresight, How to calculate the difference to get a perfect result.
Excelent practical video, thanks for sharing.
Thanks, I appreciate your kind words.
You are doing well bro
Thanks
Good job brother !
Please can you do a video on Land Scaping..
Alright, be expecting that soon
The DPC is 1590mm and the GFL is 1622mm with a difference of 32mm ,how is the DPC higher than the GFL
The Civil Engineer didn't maintain the exact level that was given for ground floor casting.
So u mean that the DPC was to be higher than the GFL??
Bro, The higher the value, the lower the terrain and the lower the value the higher the height.
I was thinking that it's 32mm that you should transfer round
What's the reason for transfering the 1m height to the column? I mean the uses of the height?
It will serve as benchmark for you and every other professional that might need it.
Please 🙏🏼 why did you subtract 1m from dpc level?
Pls wat is the meaning of Dpc
Dense concrete pavement
Well done my brother from another mother. Do you mind sharing your email address. Livy in SA
Thanks sir.
omotoyosiarogunre2021@gmail.com