Here is the rest of my Eskimo Eskape 2800 build. In this video I add the weather stripping, hitch, and spreader bar stow kit. Any questions? Drop them down in the comments below!
Hilarious that Eskimo says plan on about 2 hours for assembly! I’m sure I’ve got about 8 in already and I don’t have the skirt thingy done or the tow bar.
Hey Mr. Whats the bolt spacing on the ez stow hitch? I wanna mount my current hitch on my 2800, but wanna be able to swap it with the ez stow hitch when it comes in. Without having unnecessary holes in the sled
Thanks for the video, helped me figure out my issues!
Glad I could help. I know when I looked for guidance on TH-cam there wasn’t much.
Good work borg.
Thank You!
You’re very welcome. Thanks for watching.
تحياتي لحضرتك واشكرك على هذا الفيديو الرائع اتمنى لك التوفيق والنجاح أنا صديقه جديده في انتظارك احلى لايك
Hilarious that Eskimo says plan on about 2 hours for assembly! I’m sure I’ve got about 8 in already and I don’t have the skirt thingy done or the tow bar.
Phew I’m not the only one! It was a bit of a grind. Good luck, maybe something I did may help you I hope.
@@beaubjarnason It helped immensely, especially the tipoff about making sure the cover is oriented correctly before putting it on the frame.
Same here, I have about 8 hours in with tow bar and weather strip to go.
Hey Mr. Whats the bolt spacing on the ez stow hitch? I wanna mount my current hitch on my 2800, but wanna be able to swap it with the ez stow hitch when it comes in. Without having unnecessary holes in the sled