Keller - Waldorf Astoria Miami - Basement Soil Mix (DSM), Auger CFA Piles 190 ft, Excavation

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 พ.ค. 2024
  • Keller performed a design-build solution for the +33 ft excavation, installed all Piles (Augercast/CFA) with full reinforcing up to 190 ft and performed the excavation and unwatering for this amazing project.
    Miami - South Florida - Dry Basements
    Guaranteed Price Guaranteed Schedule Guaranteed Results Basements,
    Complete Lump Sum Turn Key Dry Basements in Florida, including All Layout, Pile, Soil Mixing, Spoils, Excavation, Hauling , Disposal, Pile cut off, Dewatering, Rock layer, Washout stations, Fall Protection and other important activities.