The Y branches for most units are only allowed to have the branch portion go off 15 degrees of horizontal, and some as much as 30 degrees horizontal. The Y branches here are coming off at a full 90 degrees top and bottom. This particular way is actually mentioned in the manual as not allowed.
That's a big thumbs down. If you don't know how to fit VRF / VRV Pipework, leave it to the experts. Otherwise, could be a very expensive mistake. There is only one way to do this type of pipework and that is the correct way.
The Y branches for most units are only allowed to have the branch portion go off 15 degrees of horizontal, and some as much as 30 degrees horizontal. The Y branches here are coming off at a full 90 degrees top and bottom. This particular way is actually mentioned in the manual as not allowed.
It-s a ceiling, mate )))))))
they look flat to me
@@Astrojamus I hate to say it but you're right. This is a ceiling view of them, so they are correct.
Incorrect piping
Nice working with Ali Bhai
The things is liquid line should be less in diameter rather that gas line. In your case liquid line is 19mm, but gas 12-07. Why ?
Y joint yese nahi lagta h
linda instalação
Mr. Sood site ludhiana
Good job
Glat pipng h ye
That's a big thumbs down. If you don't know how to fit VRF / VRV Pipework, leave it to the experts. Otherwise, could be a very expensive mistake. There is only one way to do this type of pipework and that is the correct way.
Show
Bhai koe vrv ka kam b
Data Hii Lucknow ma no 9721349257
Mobile namber