Techniques Intelligent Construction Roof Using Concrete - Technology Building Roof Step By Step

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ก.ย. 2024
  • - Mixers Construction
    - Construction
    - Mixers
    - Building
    - Music: / nocopyrightsounds

ความคิดเห็น • 31

  • @augus2november447
    @augus2november447 5 ปีที่แล้ว

    Wow! great job thanks for sharing this video god bless Philippines!

  • @buildingsmethods6428
    @buildingsmethods6428 4 ปีที่แล้ว +2

    This roof will crack and leak. It uses 3/4" rock 4" deep, shrinkage will occur. Should have cast in 2 layers and thinner overall. My concrete roof did not leak in short rains but concrete is permeable and 3 week rains wept inside. I suggest this roof will have the same problem.
    Solution, coat concrete with tar.

  • @voicemixer3448
    @voicemixer3448 4 ปีที่แล้ว

    They should need to put more water so it will compressed properly.

  • @anwaymandal9767
    @anwaymandal9767 6 ปีที่แล้ว +5

    This rod formation, I think is wrong...in slab, at shorter span of bottom cage, main rod comes first then at longer span distribution bar...after that at top cage ,distribution bar is provider at longer span then main rod is provided on that!!

    • @harisafridi8848
      @harisafridi8848 6 ปีที่แล้ว

      Anway Mandal exactly ... i also noticed they provided distribution bars first

    • @krishnasabar7279
      @krishnasabar7279 5 ปีที่แล้ว

      Anway Mandal hi

  • @HC-arch
    @HC-arch 6 ปีที่แล้ว

    good video

  • @sevenwindow2406
    @sevenwindow2406 6 ปีที่แล้ว

    thanks a lot

  • @estgamer127
    @estgamer127 6 ปีที่แล้ว +1

    Nice video

  • @waeljbaraalbargouthi
    @waeljbaraalbargouthi 5 ปีที่แล้ว +4

    To work a shearing old or/and new solid roof slab after putting & makes balance supporters & shuttering approval's , must do this thing's:
    1. Make over labs steel with old slab not less 20cm space
    2. Planted over labs by epoxy used on old slab
    3. Must beams, ribbs and span's had more links L/3 every edge "M-"
    4. Tie the L shape between slab, beams and parapets.
    5. Put the slab steel V & H as same space on plane approval
    6. Don't forget the Eelcto-mechanical works(if in founded)
    7. Put the Cover block under steel slab and beams
    8. Befor cast institute of slab must clean steel & slab land (air&water used)
    9. The first on cast institute concrete of beams, ribbs & spans 1/3. Used the vibration machine at slab when casted concrete (by layers) to make the (Homogeneity in concrete)
    10. Make surface smoothly after finished the cast institute concrete

  • @JitendraYadav-ip5od
    @JitendraYadav-ip5od 6 ปีที่แล้ว

    Very good ridig

  • @nxtzzz2000
    @nxtzzz2000 5 ปีที่แล้ว +1

    This is viẹtnam, isnt it

  • @user-vl2rp7gj9v
    @user-vl2rp7gj9v 5 ปีที่แล้ว

    جيد جدا

  • @suleshangodoyin
    @suleshangodoyin 6 ปีที่แล้ว

    Very good sight video view seen!
    Sule Shangodoyin.

    • @balbirdisodia4004
      @balbirdisodia4004 6 ปีที่แล้ว

      Sule Shangodoyin हरि
      यावी,बिलु,

  • @msstfd220nemaa6
    @msstfd220nemaa6 6 ปีที่แล้ว

    عمل جميل جميل

    • @MrAju226
      @MrAju226 5 ปีที่แล้ว

      Ma f33 jameel Lol it's bad construction practice

  • @saddamhusenhasensab3924
    @saddamhusenhasensab3924 6 ปีที่แล้ว

    sopar

  • @something4075
    @something4075 6 ปีที่แล้ว

    Size of main rod and tie in mm?

  • @sheetal5756
    @sheetal5756 6 ปีที่แล้ว +2

    छत 1 स्क्वायर फुट नाक का बताएं कितना गिट्टी और मोरम लगेगा

  • @albertosoto3834
    @albertosoto3834 5 ปีที่แล้ว

    Ese techo se va q colgar

  • @zairimawia9650
    @zairimawia9650 4 ปีที่แล้ว

    Wrong slab

  • @juktibidya123
    @juktibidya123 6 ปีที่แล้ว