Building Permit Requirements 2021 | Baguio Buildpass

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ธ.ค. 2024

ความคิดเห็น • 13

  • @layoutarchitect
    @layoutarchitect  ปีที่แล้ว

    Updated 2023
    th-cam.com/video/IDVkQKkbtUo/w-d-xo.htmlsi=XgBireGkgGzbrNwc

  • @DanelleBantol
    @DanelleBantol 5 หลายเดือนก่อน

    What if im applying only a zoning certificate and electrical permit for a fiber optic aerial. What kind of application would I click?

    • @layoutarchitect
      @layoutarchitect  5 หลายเดือนก่อน

      Which department?
      Some areas in the city have their governing approvals, such as PEZA, which does not undergo the BuildPass.
      However, if you want to make sure, you can ask for the forms directly at City Hall Planning for Zoning, and CBAO front desk for other inquiries, as the option to chat in buildpass may not be as responsive.

  • @ela7526
    @ela7526 ปีที่แล้ว

    so the application will remain as a draft if not all requirements are uploaded?

    • @layoutarchitect
      @layoutarchitect  ปีที่แล้ว

      yes, but you have to save it as draft. it will show incomplete application.

  • @lyn2670
    @lyn2670 ปีที่แล้ว

    hello ma'am, sir. ganito pa rin ba process ngaun

    • @layoutarchitect
      @layoutarchitect  ปีที่แล้ว

      Updated 2023
      th-cam.com/video/IDVkQKkbtUo/w-d-xo.htmlsi=XgBireGkgGzbrNwc

  • @cjleongson
    @cjleongson 3 ปีที่แล้ว

    Is that only for Baguio?

    • @layoutarchitect
      @layoutarchitect  3 ปีที่แล้ว

      Yes. The website is buildpass.baguio.gov.ph but the requirements might be similar to other areas + architectural permit.

  • @justwords4235
    @justwords4235 2 ปีที่แล้ว

    what if the proposed project will be constructed by the owner without going through a Contractor, is it allowed by the CBAO..
    Notice: The owner has his her Architects and engineer supervision

    • @layoutarchitect
      @layoutarchitect  2 ปีที่แล้ว

      The architect/engineer/pcab licensed contractor need to sign the Building Permit supervision. His name will be placed in the Tarpaulin during construction along with the designers
      architect
      master plumber/sanitary engr
      structural engineer
      professional electrical engineer.
      These 4 are the ones to do the analysis of the building design and responsible for any design flaws.
      The contractor supervisor is responsible for 15 yrs of any building collapse or construction flaw.

    • @justwords4235
      @justwords4235 2 ปีที่แล้ว

      @@layoutarchitect Hello Fan of Yours, what I mean Sir is,
      the Project owner has already his.. her professionals,, the problem is the owner dont want the construction to be made possible by a Contractor..
      Is it possible for the owner to build the project- with his/her own hired masons, carpenter, and the like..
      Will CBAO allow the construction? Thank You..

    • @layoutarchitect
      @layoutarchitect  ปีที่แล้ว

      ​@justwords4235 slr. Yes. Just apply by administration, and put the contractor forms as n/a.
      Updated 2023
      th-cam.com/video/IDVkQKkbtUo/w-d-xo.htmlsi=XgBireGkgGzbrNwc