this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
@@amudhanbakthavathsalu5308 Only in BJP gov railways are progressing soon in future we might get 350+ speed as indian made bullet train evolve, Blame congress for neglecting Railways for so long because of them we had midcore railways.
@@mountainspeak3592 what progress..they are not enhancing any old trains.. the conditions of trains coming from north is so dirty. but they have money to introduce shitty gante bharat tin coaches which gets damaged by hitting cow..youare saying it is progress. also to show vande bharat as fastest train they reduced speed of GATIMAAN and SHATABDI.. which were already running 150 plus..also they are not taking all the money for their governing states and not giving much to other states.. all this is development.. i never side with one party. so dont talk about congress. but i do think NOW that they were much better.. they were not wasting the public money
@@amudhanbakthavathsalu5308 It's seems you don't know much about railways, let me enlighten you assume you want to upgrade your old pc if pc is really old you might be able to get better RAM but overall it's GPU and processor won't perform well similarly upgrading old train is like replacing train engine and redesigning it's interior overall whole train revamp which will cost a lot even more than making new train cause replacing and removing old part will be a mess, Logical person having old pc will just replace cause he would know revamping whole pc is pointless. i think you already got my point so your argument for this sounds very illogical to me. As for train speed that's all about having better train tract more the train tract upgrades more will the train be able to run at it's maximum speed.
Yeah like the Vande Bharat’s which are running at 220 kmph everywhere. Just a simple promise these days is enough to fool people. This is what happens when the top talents leave the country we are left with gullible people. Our education system has gone down the drain.
Nice. I love it. That is why I m voting for Modi ji day after tomorrow. 19th April, 2024 - 07.00 am - I will be at the polling booth to cast my vote for Modi ji. Modi ji is my hero. He is a great man. A man of integrity. Follows democratic principles. Highly educated. Highly qualified. Will make Bharat a super power..
this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
@@ajitpati9324 and the credit goes to the Prime Minister for allocating budgets for the Vande Bharat - If PM did not have the vision for Vande Bharat or if he did not approve Vande Bharat then the engineers would not have got the opportunity. Even the engineers at Apple will always be thankful to Steve Jobs for startin Apple. Behind every engineer there is a great visionary leader. I will continue to vote for Modi ji for bringing out the talent in these engineers. I will continue to vote for Modi ji for giving the engineers an opportunity. A vote for Modi is a vote for Engineers..
@@pdivyanshupandey104 you are absolutely right that nobody share their technology instead, they sell it. we are buying technology which we could not be able to invent or manufacture it irrespective of in spite of thousands of engineers we produce in this country. why?
we got to built seperate corridors, also a lot of animals in india are on the free most of the times, so its hard to maintain a high speed, considering the train might be damaged and also the animal might get squashed.
Bullet Trains normally don't go above 350 Kms / Hr, Even though they probably can hit 400 Kms /Hr at max speed. Some say real max speed of Shinkansen was 400 Kms / Hr. But of course, the Train will never be allowd to run at that Speed for many reasons - Safety, Durability and Potential Hazards (Like Heating, Wear & Tear etc). Of course, Bullet Trains can't run on Vande Bhaarat Tracks.
Last week I took vande bharat to New Delhi to katra, the trains were neat and clean, seats were comfortable and they were on time, just like European trains and on the top of that food and qty was amazing, hope we could have more train like this, this would be a game changer in the transportation, good job by rail minister and govt of india 🎉I am proud how far we have come.
@@nerrailwaygorakhpur7173 tumko lagta hai har baat se koi na koi issue hai, tumhe nhi pasand toh jana train me, I went with my family and they like it and rest I don't care. 🤣 Regarding train details one can find it on internet
@@nerrailwaygorakhpur7173 😮 jutha tareef 😭😂 M bhi vande Bharat me multiple ghumta hun Tu ghumke AA Bhai Agr paise ho 🤡 Nhi toh pappu Dene wala hai 1lkh rs 😂
@@dhruvilkumpavat6037 First, I'm not "Tu". Second I don't believe in false promises. They had 10 years, that's a decade. Still they couldn't build the Shikansen, now they are promising another. Until our tracks are modified, I don't see bullet train running on them. As a Mechanical Engineer I know it's impossible.
Even though we are decades behind Japan and European counterparts .... I welcome the Vande Bharat and Bullet train initiatives .... It's high time India took the plunge .... 🙏 .... 🙂 ....
Lol you wish. China is already ahead of Japan and EU in HSR and electric technology. And not just pure HSR technology. But also in terms of construction technology and industry in general. No one can build as fast or high quality as china. China already has over 40,000km of HSR lines. Do you think India can build 40,000 HSR lines in 25 years? Or that china will stay still in the same spot for 25 years? In 25 years China will have another 40,000 km of 600km/hr rail, and also have flying taxis. And also have a moon base. India will be lucky to have 4,000km of high speed rail in 25 years. Or have 95% literacy rate even, since current rate is only 75-80% or so. India will be lucky to have toilets and sewerage system and pipes for all indians either. Or quality education for all Indian kids. From grade 1-12 like all developed countries and China has. Indian needs to get its priorities right. Not do ego projects to pretend it's catching up to china or that it's China's rival when it's not. China is already ahead of usa in many areas and is usas rival. That is the same as indians thinking India is usas rival. It's a delusion based purely on growth rates like 10% growth. Just because China grew at double digits for decades doesnt mean India will, and even if India does, India is not spending it's money wisely and does not get the same value for money that China does. Indians don't work hard like China, their system isn't efficient like China's, India has no manufacturing capacity and hasn't even industrialized. china focused first on education and industry and developing technology. India hasn't done any of those. And when India tried, like to develop domestic technology, it always fails with nothing to show for it. Just see INSAS gun. India's domestic rifle. Decades of research and development.. they built millions, commissioned and handed them out to soldiers and even exported them to other south Asian countries like Bangladesh. But after Bangladesh soldiers used them in an actual battle, they found all sorts of problems, like the barrel exploding and bullets not even firing straight. In the end india had to recall and scrap them all. And now buying Russian AKs again after decades wasted and billions invested. Same story with jet and jet engine. Tejas and engine. Still need to import western engines and tech. Or Arjun Tank. Decades of development, but by the time they finished, it was already too old and "expired" and couldn't be used. The same story for everything India tried to develop and make in India. Nothing ever works out. India is too corrupt and inefficient. that's why Indias best and brightest all leave India to go work in USA or west. If they stay in India, they will just be wasting their talent and time.. and that's if they even have the chance to show their skills off to begin with since India doesn't have any opportunity for such smart, talented people. Instead they will have to work for call centers or something for peanuts when in USA they can work for silicon valley and even be CEO of Google or Microsoft. China at least has Huawei, DJI, byd, Alibaba, tencent, weibo, tiktok, shein, temu, etc etc. China has Shenzhen. China has apple, Tesla, and all the worlds biggest and most advanced companies located in China and hiring Chinese to work for them. India has no such opportunities.. Ask yourself why India doesn't have any IT startups that develop like China has? Why India has no Indian Google or Facebook or anything? Like they don't even need capital to startup. Just need good idea and know how to code. Why India cannot do it but China can and has? Isn't Indian meant to be some IT powerhouse+democracy and China can only copy when cannot innovate since it's authoritarian? And yet china is not just leading india in code/software/AI, but even leading usa and rivaling USA and the whole world combined. What went wrong with India and why is China so successful? Don't tell me China can only copy code. Because there is zero proof, and if china can only copy, then how can it ever be ahead of USA like tiktok? Or Huawei and 5G? Or AI for space station and automated system like automatic docking or landing, like Chinese drone on far side of the moon or on mars? Or electric cars and self driving cars? Chinese algorithm and AI is ahead of USA. USA has never done those things before, like far side of moon landing, and usas landing on Mars used a different system. China does a soft landing using thrusters and hovering and slow descent in the final stage, while usa uses a balloon to cushion the impact in final phase after slowing down with thrusters.
25 years no X that by 2. Cause china is decade ahead of japan and France by the time you catch up with those 2 countries china will be 70 years ahead cause their maglev will be operational soon for commercial use. But keep up the good work India ;)
this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
@@nilaypatel1971 yeah vrey good .. kepp is up you all non south folks.. we are so lucky not to have such idiots in our state .. otherwise bjp would have enjoyed the ignorance of people..not sure how come you are so stupid to not undrstand.. i am not sidiing with congress. and i dont side with anyone. i would vote for NOTA..
I have experienced myself the french TGV, Trenitalia and Italo. The best was Italo clocking 312 kmph near Bologna during my tour of France and Italy. The main difference I realized is the track they have built for the bullet train. Its displacement is so less that actually you don't feel like you are riding a train! Hope India can achieve that too oneday..
Great start for "Made in India" Bullet trains. However we need to reach level with indigenous bullet trains with 350 km/hr speed to achieve export potential.
@@ssdhusg6042How so? If you feel everything is a lie why you believe in other parties too. Atleast we see Vande Bharat whereas in WB 25k twachers lost job cause if scam. Compare it in both way who really is lier here.
@@himanshude3431 High-speed rail embodies the overall industrial system rather than imitating pure car-making capabilities. I won't believe that such a plan can succeed until I see a complete orbital test. You must know that the Modi government also has a purchased Japanese high-speed rail that is still unfinished. Don’t you think an aircraft carrier without carrier-based aircraft is a joke?
Bro we need to make new tracks, we have not increased pur tracks since British left. The curve in present tracks are so high that the trains will derail
No that was just rendered in fast engine to save time , if u ever learnt 3d software u will understand the same could be a better with just changing render engine .but will cost time to get output.
The shinkansen E5 series bullet train which is collaboration between India-Japan is different from what ICF is going to build. This is just vande bharat with aluminum body and more powerful motors. Top speed will be 250KMPH. Don't confuse this with the actual HSR corridor which is being built between Mumbai and Ahmedabad. These vande bharats wont run on those corridors which are of standard gauge. On new corridors only shinkansen E5 series trains will run with 350KMPH.
Average speed will be 250 kmph. Through testing the trainsets, I am sure Railways is looking at a speed equal to E5 Shinkansen series. But you are right, these new trains won't run on Mumbai Ahmedabad HSR.
Plan is to build something similar to shinkansen. China did the same thing. They started of with foreign collaboration and then moved up to build their own HSR technology.
@@reachnivi2007what China did is totally different from what India is doing ok? China built it's whole A-Z systems of High speed railway and also meglev the machines they specially designed to built their high speed Railway network is 1st and last in the world.
Countries that make bullet trains dont go into joint ventures because of technology transfer issues they only provide,what India has bought from Japan will come when infrastructure is created,what will come from Japan will have changes it wont be similar to what they have in Japan technologically
@D__Ujjwal we still cannot make a proper Indian smartphone to complete with iPhone Samsung and Chinese brands bullet train is more complex,some Indian companies are stealing technology from foreign companies in India to get the technology,Taiwanese company FOXCONN in India had such experience
vision is good. but what i believe is that we must first upgrade the tracks so that maximum attainable speed is atleast 180 km/hr. For routes of vande bharat, tracks should be upgraded on a proirity basis and these vande bharat should run at 200 km /hr (max). These two should be on the priority list.
@@Hesselbac agreed side by side is the key. What i meant by priority was to push the revamping of new tracks on a much more fast track basis. Maybe a deadline way, that within 7 8 months , the Delhi varanasi route for eg will be made 180/200 kmph.
450 km per hour is the minimum speed for bullet trains look at new chinese magalev trains exceeds 650 kms per hour INDIA still in development of 250 km per hour
The next one should be mumbai - pune , mumbai - bangalore, mumbai,- hyderabad, mumbai - kolkotta, bangalore - chennai, chennai - hyderabad, bangalore - tiruvantha puram, hyderabad - kolkata, ahmedabad - delhi, delhi - shimla, delhi - rohtak - chandigarh - amritsar, all of north east should be essentially converted to high speed, kolkata - darjeeling, delhi-kanpur, kanpur - patna etc
At least 6 no of railway tracks needed for each route to increase passenger carrying capacity. Bullets trains, Vande bharat trains are if no use if tracks are not available.
Until and unless indian railway tracts are not upgraded anything will not do....Look at current vande bharat forced to run at max 130kmph when it can go upto 180kmph .in all giving us average of 90kmph... China even after reaching 600kmph is testing for trains over 900kmph ...They made the worlds largest high speed rail network....Whereas us we are still doomed with a single project of a bullet train .
Modiji hai to sub kuch mumkin hai. Well done Indian railways n many congratulations to railway minister Mr Ashwini Vaishnav ji. Keep it up. India needs the BEST infrastructure in the world. Modiji is precisely doing that. Follow atmanirbhar Bharat n make in India. N it is doing extremely well. Jai Hind Jai Bharat vande matram Bharat Mata ki Jai Ho Jai jawan Jai Kisan n mera bharat mahan.🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳💪💪💪💪🚩🚩🚩🚩🎉🎉🎊🎊🌹🌹💐💐💐🥀🥀
As i stated earlier it is very much feasible to make bullet train out of bande Bharat trains.i am a mechanical engineer and worked as a director in a big group of companies.written a science fiction book published in new york The fact that we are consolidating on producing top class railway system in our country is by itself a gem of an idea from our prime minister modiji.we should try to make trains better than the Japanese. The frontage can be similar to the Japanese which will give near zero resistance and then the cover of the undercarriage should be like a aeroplane wing On the right side there will be a little bulge and on the left side some depression in the middle Powerful but lightweight material could be used to lower overall weight. and then on the top very strong aircraft wings type structure could be added that will provide some lift up to the compartment.if structural transparent plastic material could be provided which weigh less than steel then different design can be made to lower weight Powerful motors compared to existing one could be used.tben the whole world will look toward us.balast could be removed from tracks and in its place reinforced concrete can be used No flyovers needed but crossing to be automated thus lowering expenses.we can multiply railway infrastructure ten times easily which alone take the country to be number one in economy.these trains can also be used as freight carriers.go full steam ahead.jai Shri Krishna and jai Shri Ram
I like how everyone keeps missing the basic point here: What's the point of an M4 MacBook Pro when you have 15hrs of power cut or only a dsl connection. Out of all the initiatives taken by the government, Vande Bharat trains are possibly the worst. The reason Railways in India are bad is because of the tracks and not because we don't have a train that can run at high speed or a Railways station with ACs. The conventional Blue trains(LHB) that you see can easily run at 100Kmph on average but run at a much lower speed. The railways claims Vande Bharat will help increase profits but the only thing that is happening is because of the extremely high congestion and fastest fingers first on IRCTC people are just shifting to other modes, The rich by planes and the middle class by BUS/ Cabs/cars. Stop Vande Bharat and fix the LHB coaches it offers a much higher ROI and would contribute more to welfare state objectives.
We needed world number one in world history need more hi technology advances ECT Jay hind jay bharat Jay hind jay hind jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay 🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳👍👍🙏🇮🇳👍👍🙏🇮🇳👍👍
Vande bharat has max speed of 180 but avg speed of most running trains is 100 . We need more straight tracks . So it should be done first for clocking 250 kmph
@@Yashwankhade_ What Iam saying is they reported that it will run on the 3 high speed corridors announced. I was expecting the same 320kms or 350 kms/h speed as in the current Mum-Ahem'd corridor. So were they saying about the 250 kms/ hr train or is it a different one?
It's not always corruption bro the land acquisition is the biggest problem in our country. By far it's democracy but you behave like it's an autocracy 😅. Think some what before you speak. In Maharashtra uddhav Thakre was reason for slow growth of bullet train. Correct your self
Trains never run at Top speed for which they r built. If they r building 250 it means they will run at 220 top. Always deduct 30 KMph. Current VB designed for 180 will only run top at 160. This is same for all trains worldwide. Japanese trains designed for 350 never goes beyond 320, 314
508km bullet train 2017 se abhi tak 50% ni bani. 180km speed wali vande bhart abhi 2019 se abhi tak kidhar chal rahi hai speed pe. Sari vande bahart ki average speed nikalo 60-80 ki average ayegi. Hopefully Our ministers could Bring up the speed from Construction companies to Meet deadlines. We Indians have habit of running late. One day we will change.
1.delays in mahrashtra coz of politics and the mountainous terrain (all infra projects get stuck in MH) 2.Vande bharat can go upto 120 km/h but doesnt coz the tracks in india are made since british raj and have lots of curves and bends while HST (high speed trains ) need straight or near straight tracks 3.this is credible Vande Bharat platform doesnt mean vande bharat trains it means the baseline foundation is vande bharat 4. bullet train corridors will be different that normal railway corridors 5.As bullet train is announceed vande bharat will get cheaper on par with todays normal trains with much more seating capacities and all trains in india need to be bought upto date with new standards 6.Stay coping
@@anusompramanik1638 congress ke bas ka to hai b ni ye. Modi govt started atleast. I am talking about whole as india. Nahi hoga. Because ek kam kar raha dusra karne nahi deta. So as whole india. Indians are failing at infrastructure level not bcoz of govt. Just bcoz of people
Abe BCDK land allotment ke liye kitna time lagta hai pata hai ? years nikal jate hai ek permission lene Mai. Or technology transfer, supply chain creation, training laborers , land inspection mai bohot time jata hai. Tracks , pillars, bullet train ke liye dedicated base , lifting machines kya Bina factories, supply chain, raw material and technology ke kya hawa Mai banaoge? Infrastructure pehle build Karna padta hai jo kisiko dikhta nahi par main vahi hota hai. Ek baar infrastructure banne ke baad baki lines develop karna bohot fast ho jayega. Like hamare paas metro ke liye infrastructure and technology hai isi liye baaki metro lines banan bohot fast hai recent 1-2 years mai hi bohot saari cities mai metro banke ready ho gayi hai. Train ki speed Kam tracks ki vajah se hai , abhi Tak upgrade ke baad ahamed Mumbai wali VB 160 kmph pe chalegi 130 kmph pe pehle bhi chalti thi . Tracks banana assan Kam nahi hai jo Abhi tracks biche hue hai vo pichle 60 saal Mai Bane hai sabhi ko replace kar pne mai time to lagega. Per tu nahi samjhe ga dimag to hai hi nahi tere paas sochne ka , tu to wo eek jhatke mai gareebi khatam karne valo mai se aata hai . Chamatkari chamgadad. Tere ko india chodkar nikal jana chahiye kyuki tu financially ya morally kisi mai bhi contribute nahi kar Raha tu unhi logo mai se hai jo khud road pe kachra faikke gov ko gali deta hai .
Tera comment dekh kar hee pata lagg gaya tu sarkaari naukri waala tattoo hain ..pehle private naukri karne laayak bann ja ... bewakoof isse employment hee generate hoga....😊😊😊😊😂😂😂
Common people who are majority 75% of the Indian population don't need bullet train. We need unreserved compartments trains for them which can connect most of towns across our 100 years+ railway tracks.
Toh matlab na Bane sab cheeze plan ke hisaab se chalti hain ..jaise plane ab jyaada mehenga nahi reh gaya....humesha niraash rahoge toh kuch nhi hone waala ...aur waise bhi show off ke liye nahi hain yeh train...
First let the Modi Government look at the conditions on mass transport.. instead of luxury transport… people from unreserved coaches are entering AC coaches.. high time government focuses on more unreserved coaches
Only 250 😢😢😢 Kyu nhi speed increasing ⬆️⬆️ We must do competition with China who are making levitating trains , almost 400 kmph, it's levitating and after this unique technology having these speed
For a country like India it needs a pan India high speed train Mega project (none of India's trains are considered actual high speed trains ,the avg speed needs to be around 150 kmph,in some countries it's around 180-200 kmph) system not some miniscule 100 kms two way routes of trail where the single project of bullet train project's cost the same as the implementation of high speed train routes (actual international standard hst -hogh speed train which has an average speed of 150 kmph unlike in India the at best it's around 80 kmph,most of the so called high speed train in India is avg speed is around 50 to 60 kmph) through multiple states of india, Which would serve way way more people(of lower economic means) which would allow upward social mobility way more than ever ,but this govt or the Congress if they win will not do it to keep the domestic business class happy .
Atleast india started now the initiative to design and manufacture indigeneous bullet trains . Indians has the brain to design that. Like space research india should invest more in high speed trainset research and also aerospace engine research
Expect the unexpected! Incredible India ❤ from the Philippines.
🙏
Love you Brother, Love from India.
Another AB from Philippines.
Good. Let pinoys help. 😂😂😂
Thank you ❤❤❤
God bless you India, greetings from Indonesia 👏
so, engage Indiot HSR bidding for future HSP.
Terima Kasih
@@momomarumomonga4885😂😂 and many jokers as well. One of them is u😂
Thanks Suryana....India loves Indonesia very much....your name is taken from the Indian name as SURYA.... NA.
Thank you ❤❤❤
India deserves such transportation facilities and infrastructure. Proud to be an Indian.
this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
@@amudhanbakthavathsalu5308 Only in BJP gov railways are progressing soon in future we might get 350+ speed as indian made bullet train evolve, Blame congress for neglecting Railways for so long because of them we had midcore railways.
@@mountainspeak3592 what progress..they are not enhancing any old trains.. the conditions of trains coming from north is so dirty. but they have money to introduce shitty gante bharat tin coaches which gets damaged by hitting cow..youare saying it is progress. also to show vande bharat as fastest train they reduced speed of GATIMAAN and SHATABDI.. which were already running 150 plus..also they are not taking all the money for their governing states and not giving much to other states.. all this is development.. i never side with one party. so dont talk about congress. but i do think NOW that they were much better.. they were not wasting the public money
Sach bol tu India alliance se aaya hai na@@amudhanbakthavathsalu5308
@@amudhanbakthavathsalu5308 It's seems you don't know much about railways, let me enlighten you assume you want to upgrade your old pc if pc is really old you might be able to get better RAM but overall it's GPU and processor won't perform well similarly upgrading old train is like replacing train engine and redesigning it's interior overall whole train revamp which will cost a lot even more than making new train cause replacing and removing old part will be a mess, Logical person having old pc will just replace cause he would know revamping whole pc is pointless. i think you already got my point so your argument for this sounds very illogical to me. As for train speed that's all about having better train tract more the train tract upgrades more will the train be able to run at it's maximum speed.
Per yeh sadmaa indi alliance wale bardasht nahi kar paengey🙄😥😭😆
😂😂😂😂
Roenge bo india ki growth dekh ke
Yeah like the Vande Bharat’s which are running at 220 kmph everywhere. Just a simple promise these days is enough to fool people. This is what happens when the top talents leave the country we are left with gullible people. Our education system has gone down the drain.
Let them cry who cares.
LINDI alliance h woh indi nhi 😂
Made in india bullet trains ?Indian railways going to run those trains on new hsr corridor?
Wow
Japan has also transferred the technology bro
Yea Japan has invested too..like a billion dollar
Every businessman wants to go there 😂😂😂@@TheGreatVivek7
You are you to talk like that about Gujrat State@@TheGreatVivek7
Nope a bit different @@CU-15
Wow great India. ❤ From 🇮🇩
Which flag is that bro no offense i bunked my geography classes 😭
@@DakshJee-xx7bjthat's Indonesia
@@jahanviagrahari oh aight
Nice. I love it. That is why I m voting for Modi ji day after tomorrow. 19th April, 2024 - 07.00 am - I will be at the polling booth to cast my vote for Modi ji. Modi ji is my hero. He is a great man. A man of integrity. Follows democratic principles. Highly educated. Highly qualified. Will make Bharat a super power..
this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
The credit goes to great engineers at ICF.
@@ajitpati9324 and the credit goes to the Prime Minister for allocating budgets for the Vande Bharat -
If PM did not have the vision for Vande Bharat or if he did not approve Vande Bharat then the engineers would not have got the opportunity.
Even the engineers at Apple will always be thankful to Steve Jobs for startin Apple.
Behind every engineer there is a great visionary leader. I will continue to vote for Modi ji for bringing out the talent in these engineers. I will continue to vote for Modi ji for giving the engineers an opportunity.
A vote for Modi is a vote for Engineers..
Time to grow up and go to school.
@@elnovato1741 Then the credit for all the 60 accidents and thousands of deaths also goes to Modiji.
Whosoever is writing The Incredible India story has teeth not seen in Ages. Jai Hind 🇮🇳
@prfctillusion indian bullet train. the body is indian and technology is pardesi.
@@WeSeeJ4ththen what?
@@jkskh developed business
@@WeSeeJ4th nobody share technology
@@pdivyanshupandey104 you are absolutely right that nobody share their technology instead, they sell it. we are buying technology which we could not be able to invent or manufacture it irrespective of in spite of thousands of engineers we produce in this country. why?
Good. If they can reach 250. Then they can certainly reach 350? Hopefully the tracks will also be upgraded.
we got to built seperate corridors, also a lot of animals in india are on the free most of the times, so its hard to maintain a high speed, considering the train might be damaged and also the animal might get squashed.
Bullet Trains normally don't go above 350 Kms / Hr, Even though they probably can hit 400 Kms /Hr at max speed. Some say real max speed of Shinkansen was 400 Kms / Hr.
But of course, the Train will never be allowd to run at that Speed for many reasons - Safety, Durability and Potential Hazards (Like Heating, Wear & Tear etc). Of course, Bullet Trains can't run on Vande Bhaarat Tracks.
@@SnehalShetty-ij4bi That's the reason Bullet Train is built on "Elevated Tracks". Can't see how an animal can climb 20 feet up 😐
@@SnehalShetty-ij4bifor that reason the new HSR track is 90% elevated and on land it's getting fenced
@@SnehalShetty-ij4bi HSR runs on a dedicated track like in Ahmedabad-mumbai. They will be mostly on elevated track fenced on both sides.
Last week I took vande bharat to New Delhi to katra, the trains were neat and clean, seats were comfortable and they were on time, just like European trains and on the top of that food and qty was amazing, hope we could have more train like this, this would be a game changer in the transportation, good job by rail minister and govt of india 🎉I am proud how far we have come.
Jhutha tarif mt kro kitna saaf tha? Aur kitna time pe tha? Aur price kya tha ye bhi dekho
@@nerrailwaygorakhpur7173 tumko lagta hai har baat se koi na koi issue hai, tumhe nhi pasand toh jana train me, I went with my family and they like it and rest I don't care. 🤣 Regarding train details one can find it on internet
@@Pen_voyage hm thik hai bhai😂😂
@@nerrailwaygorakhpur7173 😮 jutha tareef 😭😂
M bhi vande Bharat me multiple ghumta hun
Tu ghumke AA Bhai
Agr paise ho 🤡
Nhi toh pappu Dene wala hai 1lkh rs 😂
Brother, are European trains not on time? Chinese trains are just on time.
Modi hai to mumkin hai ❤
Accidents bhi badhte he, Modi hai to chalta he.
@@ajitpati9324 tu kya bolna chah rha h. Bullet trains banaye ya na banaye??
Pappu ki pyari 😂@@ajitpati9324
@@dhruvilkumpavat6037 First, I'm not "Tu". Second I don't believe in false promises. They had 10 years, that's a decade. Still they couldn't build the Shikansen, now they are promising another. Until our tracks are modified, I don't see bullet train running on them. As a Mechanical Engineer I know it's impossible.
@@ajitpati9324mechanical engineer 😂
Even though we are decades behind Japan and European counterparts .... I welcome the Vande Bharat and Bullet train initiatives .... It's high time India took the plunge .... 🙏 .... 🙂 ....
At least 25 years behind China
@@KijjiSaleyep ,but we will catch up in 30 years
Lol you wish. China is already ahead of Japan and EU in HSR and electric technology.
And not just pure HSR technology. But also in terms of construction technology and industry in general. No one can build as fast or high quality as china. China already has over 40,000km of HSR lines.
Do you think India can build 40,000 HSR lines in 25 years? Or that china will stay still in the same spot for 25 years? In 25 years China will have another 40,000 km of 600km/hr rail, and also have flying taxis. And also have a moon base.
India will be lucky to have 4,000km of high speed rail in 25 years. Or have 95% literacy rate even, since current rate is only 75-80% or so.
India will be lucky to have toilets and sewerage system and pipes for all indians either. Or quality education for all Indian kids. From grade 1-12 like all developed countries and China has. Indian needs to get its priorities right. Not do ego projects to pretend it's catching up to china or that it's China's rival when it's not.
China is already ahead of usa in many areas and is usas rival. That is the same as indians thinking India is usas rival. It's a delusion based purely on growth rates like 10% growth. Just because China grew at double digits for decades doesnt mean India will, and even if India does, India is not spending it's money wisely and does not get the same value for money that China does. Indians don't work hard like China, their system isn't efficient like China's, India has no manufacturing capacity and hasn't even industrialized. china focused first on education and industry and developing technology. India hasn't done any of those. And when India tried, like to develop domestic technology, it always fails with nothing to show for it.
Just see INSAS gun. India's domestic rifle. Decades of research and development.. they built millions, commissioned and handed them out to soldiers and even exported them to other south Asian countries like Bangladesh. But after Bangladesh soldiers used them in an actual battle, they found all sorts of problems, like the barrel exploding and bullets not even firing straight.
In the end india had to recall and scrap them all. And now buying Russian AKs again after decades wasted and billions invested. Same story with jet and jet engine. Tejas and engine. Still need to import western engines and tech. Or Arjun Tank. Decades of development, but by the time they finished, it was already too old and "expired" and couldn't be used.
The same story for everything India tried to develop and make in India. Nothing ever works out. India is too corrupt and inefficient. that's why Indias best and brightest all leave India to go work in USA or west. If they stay in India, they will just be wasting their talent and time.. and that's if they even have the chance to show their skills off to begin with since India doesn't have any opportunity for such smart, talented people. Instead they will have to work for call centers or something for peanuts when in USA they can work for silicon valley and even be CEO of Google or Microsoft.
China at least has Huawei, DJI, byd, Alibaba, tencent, weibo, tiktok, shein, temu, etc etc. China has Shenzhen. China has apple, Tesla, and all the worlds biggest and most advanced companies located in China and hiring Chinese to work for them. India has no such opportunities..
Ask yourself why India doesn't have any IT startups that develop like China has? Why India has no Indian Google or Facebook or anything? Like they don't even need capital to startup. Just need good idea and know how to code. Why India cannot do it but China can and has? Isn't Indian meant to be some IT powerhouse+democracy and China can only copy when cannot innovate since it's authoritarian? And yet china is not just leading india in code/software/AI, but even leading usa and rivaling USA and the whole world combined.
What went wrong with India and why is China so successful? Don't tell me China can only copy code. Because there is zero proof, and if china can only copy, then how can it ever be ahead of USA like tiktok? Or Huawei and 5G? Or AI for space station and automated system like automatic docking or landing, like Chinese drone on far side of the moon or on mars? Or electric cars and self driving cars? Chinese algorithm and AI is ahead of USA. USA has never done those things before, like far side of moon landing, and usas landing on Mars used a different system. China does a soft landing using thrusters and hovering and slow descent in the final stage, while usa uses a balloon to cushion the impact in final phase after slowing down with thrusters.
25 years no X that by 2. Cause china is decade ahead of japan and France by the time you catch up with those 2 countries china will be 70 years ahead cause their maglev will be operational soon for commercial use. But keep up the good work India ;)
@@RoamingChronicles_1 according to report of goldmann sachs india will surpass US till 2050 and china till 2075
Excellent good for Chennai, Tamil Nadu and India
Jobs in manufacturing
Pride in product
India 🇮🇳 will be the best, strong,durable,efficient train, rail coaches,locomotives metro trains manufacturer in the world .
INDIA IS PROGRESSING BY LEAPS AND BOUNDS UNDER THE LEADERSHIP OF MODI JI. ONCE AGAIN MODI JI IN 2024.
this is total bu..s.t...which vande bharat is running 250...if the tracks are already prepared for 250..also japan s shinkansen and other country trains are running 350 plus not 250..how come this idiots are saying it is similar to those trains... Currenlty the tracks are being build only between a small stretch just to show that india has some kind of train whic is going to run 250 km/hr..but after that nothing will be developed. this current project itself is running late in implementation. about many years late. not sure why i got this video suggestion. i will make sure to remove it from suggestions. and also spread this to my acquaintances. and freinds that not to watch or subscribe this chennal
*Well Done BJP.... But INDI Allience Stopped /SLow Down Project work in Maharastra (Udhdhav Thakre + )*
@@nilaypatel1971 yeah vrey good .. kepp is up you all non south folks.. we are so lucky not to have such idiots in our state .. otherwise bjp would have enjoyed the ignorance of people..not sure how come you are so stupid to not undrstand.. i am not sidiing with congress. and i dont side with anyone. i would vote for NOTA..
Kitne mile Bjp se IT cell wale
@user-xz1qk7hi6k 69 biscuit per day
I have experienced myself the french TGV, Trenitalia and Italo. The best was Italo clocking 312 kmph near Bologna during my tour of France and Italy. The main difference I realized is the track they have built for the bullet train. Its displacement is so less that actually you don't feel like you are riding a train! Hope India can achieve that too oneday..
what a great leadership india got this generation is very lucky
That's huge achivement in terms of domestic manufacturing and export.
It will create manufacturing environment and India's sustainable development.
Great start for "Made in India" Bullet trains. However we need to reach level with indigenous bullet trains with 350 km/hr speed to achieve export potential.
Where is the basic runway? This is obviously another lie from a selection of brags. Modi is good at shouting like this.
@@ssdhusg6042How so? If you feel everything is a lie why you believe in other parties too. Atleast we see Vande Bharat whereas in WB 25k twachers lost job cause if scam. Compare it in both way who really is lier here.
@@himanshude3431 High-speed rail embodies the overall industrial system rather than imitating pure car-making capabilities. I won't believe that such a plan can succeed until I see a complete orbital test. You must know that the Modi government also has a purchased Japanese high-speed rail that is still unfinished. Don’t you think an aircraft carrier without carrier-based aircraft is a joke?
@@ssdhusg6042 it's not car making capabilities or anything. We have tech transfer just like Russia. We have bharamos, biggest example of such success.
There are no tracks for 350km bullet train even Mumbai to Ahmedabad is not complete
what about Tracks. Upgrade them to 250 too... That is real Task.
They will be on bullet train tracks
Man you can't !! Otherwise, the trains would be derailed in curves. Instead we have to make new separate lines for bullet trains
Bro many indian companies are engaged in bullet train project so I don't think hifh speed track will be a problem in near future🤷♂️
@@dhrubajyotisaha2005yeah 👍
Bullet train won't run on same tracks. For example for Ahmedabad Mumbai bullet train new tracks at separate places are being set up.
Great Chennai always ❤ and victory to TN Proud to be tamizhan
Awarded by whome? Bjp...
Be proud to be an indian
No it is not. It's the modi govt initiative. Proud to be an Indian. Not like udayanidhi dengue malaria party stalin.
*Well Done BJP.... But INDI Allience Stopped /SLow Down Project work in Maharastra (Udhdhav Thakre + )*
Thrirutu dravidam😊
Our railway tracks need an upgrade, even vande Bharat doesn't run on its full potential of 160 kmph.
Progress is underway.. u start generate revenue 👍
Not to forget the rising cases of railway accidents
Doesn't even run faster than 80 kmph ...
Bro we need to make new tracks, we have not increased pur tracks since British left. The curve in present tracks are so high that the trains will derail
@@xcel5203I've travelled and recorded the highest 140kmph speed
that windows xp level 3D visuals 😍
Yea
Visuals don't matter, the Underlying measurements and the technology of the signaling/engineering matters more.. stop living in Hollywood world
@@Sticklemako, The diesel locomotive now should race with the bullet hei, acha pek
@@achekholbeckal889 that might be the stupidest reply but continue showing your lack of intellect
No that was just rendered in fast engine to save time
, if u ever learnt 3d software u will understand the same could be a better with just changing render engine .but will cost time to get output.
Vande Bharat was such a pleasant experience and now bullet trains as well. Heck ya man I am all in for my country to be developed.
The shinkansen E5 series bullet train which is collaboration between India-Japan is different from what ICF is going to build. This is just vande bharat with aluminum body and more powerful motors. Top speed will be 250KMPH. Don't confuse this with the actual HSR corridor which is being built between Mumbai and Ahmedabad. These vande bharats wont run on those corridors which are of standard gauge. On new corridors only shinkansen E5 series trains will run with 350KMPH.
Average speed will be 250 kmph. Through testing the trainsets, I am sure Railways is looking at a speed equal to E5 Shinkansen series. But you are right, these new trains won't run on Mumbai Ahmedabad HSR.
Plan is to build something similar to shinkansen. China did the same thing. They started of with foreign collaboration and then moved up to build their own HSR technology.
Bhai 250 bhi daurega. Nahi chahiye shikansen. Introduce toh hojaye. This will suffice. For us NE-ners this is hyperloop.
Then a massive upgrade of tracks would be needed. Current tracks can't handle such speeds
@@reachnivi2007what China did is totally different from what India is doing ok? China built it's whole A-Z systems of High speed railway and also meglev the machines they specially designed to built their high speed Railway network is 1st and last in the world.
India must join venture built Bullet trains with Japan 🇯🇵 n France 🇫🇷 of international standard n safety n affordability !
The Japanese are very selfish when it comes to technology. See Taiwan's issues with Japanese bullet trains.
Japan never gives its technology to anyone thats why Japanese technology does not work properly anywhere
@quark3they are enough generous in case of india bro, we need ro do some r&d for indigineous bullet trains, ir will promote r&d culture in India roo
Countries that make bullet trains dont go into joint ventures because of technology transfer issues they only provide,what India has bought from Japan will come when infrastructure is created,what will come from Japan will have changes it wont be similar to what they have in Japan technologically
@D__Ujjwal we still cannot make a proper Indian smartphone to complete with iPhone Samsung and Chinese brands bullet train is more complex,some Indian companies are stealing technology from foreign companies in India to get the technology,Taiwanese company FOXCONN in India had such experience
Congratulations India 🎉
Keep it up India. Wish you all the best and more great progress.
Waiting for one in eastern India. Howrah-Bhubaneswar-Vizag route needs one.
Jai Hind
Ravish Kumar got hemorrhoid after watching this 🤣🤣
May be he's thinking about howmany more accidents will happen now?
He is right. Ever travelled in normal Indian overcrowded trains?
Bawasir kumar: ye dekho india me berojgaari sar par hai aur ye bullet train chala rahe hai🤡
Actually he is laughing because at the moment no train is running more than 80 kmph in Bharat . Forget 350 joke for morons.
No he's laughing at 80km trains 😅
vision is good. but what i believe is that we must first upgrade the tracks so that maximum attainable speed is atleast 180 km/hr.
For routes of vande bharat, tracks should be upgraded on a proirity basis and these vande bharat should run at 200 km /hr (max).
These two should be on the priority list.
Projects are done side by side so that we cn achieve both simultaneously...
If we do one thing and pause other, it won’t make sense
Yes our current are capable to 200 but the tracks are made for only 100😢
Biggest question should be, why bullet trains for Gujarat? No one wants to go there
@@Hesselbac agreed side by side is the key. What i meant by priority was to push the revamping of new tracks on a much more fast track basis. Maybe a deadline way, that within 7 8 months , the Delhi varanasi route for eg will be made 180/200 kmph.
MAKE INDIA GREAT AGAIN 🇮🇳❤️💪🏼
450 km per hour is the minimum speed for bullet trains look at new chinese magalev trains exceeds 650 kms per hour
INDIA still in development of 250 km per hour
Lol, no operational passenger bullet train runs at that speed first of all and 250 kmph is the minimum speed for a high speed rail
Meanwhile China already has 48,000km of HSR running normally at 350kph in 2023😂😂😂
You have to start somewhere, right?
If not for Modi/BJP India would've still remained a sub-saharan African 3rd World, still running WW2 era Train Sets.
The next one should be mumbai - pune , mumbai - bangalore, mumbai,- hyderabad, mumbai - kolkotta, bangalore - chennai, chennai - hyderabad, bangalore - tiruvantha puram, hyderabad - kolkata, ahmedabad - delhi, delhi - shimla, delhi - rohtak - chandigarh - amritsar, all of north east should be essentially converted to high speed, kolkata - darjeeling, delhi-kanpur, kanpur - patna etc
There is a already a laid out plan, all tier 1 and most tier 2 will be fully connected by 2035
No Comments. Speechless 🗿
Thousands of stray animals on railway tracks across the country gonna love this high speed bullet trains.
bullet train track is build completely elevated
stupid
Flying cows??
All track are elevated not on land bro
I kindly request the Southern railways to clean the Garbages and Rubbish in the railway tracks... it's really looks dirty
At least 6 no of railway tracks needed for each route to increase passenger carrying capacity. Bullets trains, Vande bharat trains are if no use if tracks are not available.
Train delay is the main issue in this country. 😔
Politition for reason 😅
@@Yashwankhade_ People of our country needs to learn discipline including me😔
We need More tracks for that.
Just Scamgress party
Bullet train will not be late because it has an aerial track with no intersection, hault, public passages , therefore no resistance in the speed.
Until and unless indian railway tracts are not upgraded anything will not do....Look at current vande bharat forced to run at max 130kmph when it can go upto 180kmph .in all giving us average of 90kmph...
China even after reaching 600kmph is testing for trains over 900kmph ...They made the worlds largest high speed rail network....Whereas us we are still doomed with a single project of a bullet train .
Modiji hai to sub kuch mumkin hai. Well done Indian railways n many congratulations to railway minister Mr Ashwini Vaishnav ji. Keep it up. India needs the BEST infrastructure in the world. Modiji is precisely doing that. Follow atmanirbhar Bharat n make in India. N it is doing extremely well. Jai Hind Jai Bharat vande matram Bharat Mata ki Jai Ho Jai jawan Jai Kisan n mera bharat mahan.🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳💪💪💪💪🚩🚩🚩🚩🎉🎉🎊🎊🌹🌹💐💐💐🥀🥀
Congratulations India. Jai Hind 🇮🇳
Sincere thanks with folded hands to Government of India.. Indian Railways alongside engineering team...
Upgrade first track also after that it's possible. Besides its this train version work progress to parallel together it
Track pehle banta to kehte ki pehle train banalo .
Trains that run under 300 km doesn’t consider the high speed trains. Thus, it’s not considered world class level
India is 500 years behind China in trains. We indians have no idea.
500 yrs WTF!!!!!! 🤣🤣
@@yatharthojha7116 haha yes. Pray to Ganesh so that you live 500 years to see it. ❤️
@@bobbybannerjee5156 don't show your below average iq lvl
No bro 5000000000
All the brilliant plans are in the future ; today no train in India runs faster than 80 kmph.
more like 50km/hr average
Whole India is proud of the job done by ICF in Chennai ❤ great step towards a prosperous future 😊
Image used is from japan railway station not India
I am pretty sure that the picture is about high speed train in China
何も知らないインド人!
可哀想。lol
@@吴东-x9xits japanese shinkansen
As i stated earlier it is very much feasible to make bullet train out of bande Bharat trains.i am a mechanical engineer and worked as a director in a big group of companies.written a science fiction book published in new york
The fact that we are consolidating on producing top class railway system in our country is by itself a gem of an idea from our prime minister modiji.we should try to make trains better than the Japanese. The frontage can be similar to the Japanese which will give near zero resistance and then the cover of the undercarriage should be like a aeroplane wing
On the right side there will be a little bulge and on the left side some depression in the middle
Powerful but lightweight material could be used to lower overall weight. and then on the top very strong aircraft wings type structure could be added that will provide some lift up to the compartment.if structural transparent plastic material could be provided which weigh less than steel then different design can be made to lower weight
Powerful motors compared to existing one could be used.tben the whole world will look toward us.balast could be removed from tracks and in its place reinforced concrete can be used
No flyovers needed but crossing to be automated thus lowering expenses.we can multiply railway infrastructure ten times easily which alone take the country to be number one in economy.these trains can also be used as freight carriers.go full steam ahead.jai Shri Krishna and jai Shri Ram
Science fiction.
At 250 not a bullet train
bro search on google it clearly says it will be called bullet train if it reaches a speed of 250kmph
its a good jump so bullet trains can run in smaller and more remote area
It is average speed not top speed😂
It is average speed not top speed😂
If it can clock over 220 kmph it is technically in the high speed category
Mumbai to Ahmedabad bullet train route 72 75% complete this good achievement of BJP , bullet train 50% work covid-19 ,effect what good achievement ✌️👍
Pictures of the trains are from CRH China high speed railways. Atleast do your homework nicely
But the information is true😊😊😊
🎉🎉🎉 ❤ 🇮🇳 🇮🇳 🇮🇳 🇮🇳 🇮🇳 🇮🇳 ... great development... respect from Thailand...
I hope those will have automatic coupler, not steel cover like present.
I like how everyone keeps missing the basic point here: What's the point of an M4 MacBook Pro when you have 15hrs of power cut or only a dsl connection. Out of all the initiatives taken by the government, Vande Bharat trains are possibly the worst. The reason Railways in India are bad is because of the tracks and not because we don't have a train that can run at high speed or a Railways station with ACs. The conventional Blue trains(LHB) that you see can easily run at 100Kmph on average but run at a much lower speed. The railways claims Vande Bharat will help increase profits but the only thing that is happening is because of the extremely high congestion and fastest fingers first on IRCTC people are just shifting to other modes, The rich by planes and the middle class by BUS/ Cabs/cars. Stop Vande Bharat and fix the LHB coaches it offers a much higher ROI and would contribute more to welfare state objectives.
Made in india bullet train, but parts from CHINA!!
As Always...Jai Hind - Jai Bharat!!
Normal trains rn are soooo crowded.
Separate track has been constructed for bullet train buddy
@@CU-15He is talking about the bad condition of normal trains, only 5% will travel from bullets, what about others.
Train tickets k price badah doh train khud Khali ho jayegi 😅😅
@@ripleydead8041 ac 3 bhi gen3ral ban raha hai dh3ere dheere. And tickets hi nahi mil rahe ab toh.
Bullet trains will be competing with airlines, not railways
We needed world number one in world history need more hi technology advances ECT Jay hind jay bharat Jay hind jay hind jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay bharat Jay 🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳👍👍🙏🇮🇳👍👍🙏🇮🇳👍👍
Travel vloggers, be ready.😅
😂
It will take atleast 20 years
India number ONE !!!.....when India said they are Number 2, no other countridare to claim Number ONE.
Arrogant 😂
Firstly India has to improve its track because these bullet trains will also run at 130 Kmph due to track
If you agree
👇
Vande bharat has max speed of 180 but avg speed of most running trains is 100 . We need more straight tracks . So it should be done first for clocking 250 kmph
Why 250? Not 350?
It's first time bro their are some test before you go directly on top speed
Engineering is not maggi my friend.
Better progress slowly than run on a 5th gear and fall down
bro has done engineering from tatti university
@@Yashwankhade_ What Iam saying is they reported that it will run on the 3 high speed corridors announced. I was expecting the same 320kms or 350 kms/h speed as in the current Mum-Ahem'd corridor. So were they saying about the 250 kms/ hr train or is it a different one?
Current vande bharat averages a speed of 100 to 110 kmph. I will believe when I see the 250 kmph train.
250 KMPH bullet train and Vande bharat top speed at 220 so whats the point and too slow progress due to extreme corruption
top speed of vande bharat is like 180 but runs at 120 to 150kmph
@@SHUBHAMPatil-sm2jbnope 3.0 version which soon ! Will join come out have 220 kmph max speed
It's not always corruption bro the land acquisition is the biggest problem in our country. By far it's democracy but you behave like it's an autocracy 😅. Think some what before you speak. In Maharashtra uddhav Thakre was reason for slow growth of bullet train. Correct your self
Trains never run at Top speed for which they r built. If they r building 250 it means they will run at 220 top. Always deduct 30 KMph.
Current VB designed for 180 will only run top at 160. This is same for all trains worldwide. Japanese trains designed for 350 never goes beyond 320, 314
250 is average speed top speed is 320
God bless India !
yes election lolipop 😂 bullet train deadline was on 2020
Yes saar u right.
All those built in tracks for bullet trains is to transport vegetables from one state to another from goods train
508km bullet train 2017 se abhi tak 50% ni bani.
180km speed wali vande bhart abhi 2019 se abhi tak kidhar chal rahi hai speed pe. Sari vande bahart ki average speed nikalo 60-80 ki average ayegi.
Hopefully Our ministers could Bring up the speed from Construction companies to Meet deadlines. We Indians have habit of running late. One day we will change.
Lekin godi media to ye baat nehi deikhayga
1.delays in mahrashtra coz of politics and the mountainous terrain (all infra projects get stuck in MH)
2.Vande bharat can go upto 120 km/h but doesnt coz the tracks in india are made since british raj and have lots of curves and bends while HST (high speed trains ) need straight or near straight tracks
3.this is credible Vande Bharat platform doesnt mean vande bharat trains it means the baseline foundation is vande bharat
4. bullet train corridors will be different that normal railway corridors
5.As bullet train is announceed vande bharat will get cheaper on par with todays normal trains with much more seating capacities and all trains in india need to be bought upto date with new standards
6.Stay coping
@@anusompramanik1638 congress ke bas ka to hai b ni ye.
Modi govt started atleast. I am talking about whole as india. Nahi hoga. Because ek kam kar raha dusra karne nahi deta.
So as whole india. Indians are failing at infrastructure level not bcoz of govt. Just bcoz of people
@@anusompramanik1638Congress ne boggie badhane k alawa kya kya tha railway m jara batana?
Abe BCDK land allotment ke liye kitna time lagta hai pata hai ? years nikal jate hai ek permission lene Mai. Or technology transfer, supply chain creation, training laborers , land inspection mai bohot time jata hai. Tracks , pillars, bullet train ke liye dedicated base , lifting machines kya Bina factories, supply chain, raw material and technology ke kya hawa Mai banaoge? Infrastructure pehle build Karna padta hai jo kisiko dikhta nahi par main vahi hota hai.
Ek baar infrastructure banne ke baad baki lines develop karna bohot fast ho jayega. Like hamare paas metro ke liye infrastructure and technology hai isi liye baaki metro lines banan bohot fast hai recent 1-2 years mai hi bohot saari cities mai metro banke ready ho gayi hai.
Train ki speed Kam tracks ki vajah se hai , abhi Tak upgrade ke baad ahamed Mumbai wali VB 160 kmph pe chalegi 130 kmph pe pehle bhi chalti thi . Tracks banana assan Kam nahi hai jo Abhi tracks biche hue hai vo pichle 60 saal Mai Bane hai sabhi ko replace kar pne mai time to lagega.
Per tu nahi samjhe ga dimag to hai hi nahi tere paas sochne ka , tu to wo eek jhatke mai gareebi khatam karne valo mai se aata hai . Chamatkari chamgadad.
Tere ko india chodkar nikal jana chahiye kyuki tu financially ya morally kisi mai bhi contribute nahi kar Raha tu unhi logo mai se hai jo khud road pe kachra faikke gov ko gali deta hai .
Congratulations Modeegi ❤️❤️❤️🙋♂️
It is nothing in front of China
India is nothing in front of China. Aise bolo na 😜
China people are more Civilized just look at Indians Behaviour in public places..
@@tarunika983 hahahahahahah exactly.
🐽
Your behavioural habits are nothing infront of chinese 😊
👌🙏✊️ Even mint, wire etc. have started turning 🍊...
Satyameva Jayate
Keep doing the great work
👌🙏✊️
The achievements of India will always stay on the lips and drawings, then hail the victory and be proud to be an Indian.
Dictatorship ❤
German Shephard:Saar Phool andbhakti saar🤓☝️
Unemployment mitao pehla yrr 😢
Tera comment dekh kar hee pata lagg gaya tu sarkaari naukri waala tattoo hain ..pehle private naukri karne laayak bann ja ... bewakoof isse employment hee generate hoga....😊😊😊😊😂😂😂
Common people who are majority 75% of the Indian population don't need bullet train. We need unreserved compartments trains for them which can connect most of towns across our 100 years+ railway tracks.
गरीब आदमी के लिए तो नही है बस शो ऑफ के लिए
Toh matlab na Bane sab cheeze plan ke hisaab se chalti hain ..jaise plane ab jyaada mehenga nahi reh gaya....humesha niraash rahoge toh kuch nhi hone waala ...aur waise bhi show off ke liye nahi hain yeh train...
Good to see that India is growing and is the fastest-growing major economy under the Modi govt.
First let the Modi Government look at the conditions on mass transport.. instead of luxury transport… people from unreserved coaches are entering AC coaches.. high time government focuses on more unreserved coaches
uNRESERVED EH? Why? Because you want to travel from MAdras to N.Delhi for $1 eh?
Every things are on Air
I am proud to be born in India. Congratulations to my home nation for becoming self sufficient in every field.
Only 250 😢😢😢
Kyu nhi speed increasing ⬆️⬆️
We must do competition with China who are making levitating trains , almost 400 kmph, it's levitating and after this unique technology having these speed
320kmph is speed of bullet trains in japan/france so don't compete with them
Good job railways go for the project and don't ever look back
This is new India flying high than others
High than others? Lol
For a country like India it needs a pan India high speed train Mega project (none of India's trains are considered actual high speed trains ,the avg speed needs to be around 150 kmph,in some countries it's around 180-200 kmph) system not some miniscule 100 kms two way routes of trail where the single project of bullet train project's cost the same as the implementation of high speed train routes (actual international standard hst -hogh speed train which has an average speed of 150 kmph unlike in India the at best it's around 80 kmph,most of the so called high speed train in India is avg speed is around 50 to 60 kmph) through multiple states of india,
Which would serve way way more people(of lower economic means) which would allow upward social mobility way more than ever ,but this govt or the Congress if they win will not do it to keep the domestic business class happy .
All round placement
Good view
Super PM 🙏🙏
Mera Bharat mahan Jai Hind Jai Bharat Jai Ho Engeneering Jai Ho namo namo 👍👍👍🙏🙏🙏🇮🇳🇮🇳🇮🇳
#start-up-india#skills India
That's it That's it! Indigenous bullet train.. I was longing for it!
Well done India. 🙏👏🌹🇮🇳
Modi Transforming India...........Iss baar 400 paar ❤❤❤❤❤❤
Jay hind jay modi ji jai modi ji jai modi ji jai modi ji jai modi ji jai modi ji jai modi ji jai modi 🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳🇮🇳👍👍🙏🇮🇳👍👍
Awesome ...Infrastructure development is important for growth. Modi should win 3rd term with a bigger mandate.
This is a really proud movement we can replace our japanese bullet trains very soon proud to be a bharathiyan🇮🇳🇮🇳
Atleast india started now the initiative to design and manufacture indigeneous bullet trains . Indians has the brain to design that. Like space research india should invest more in high speed trainset research and also aerospace engine research
PPT becomes visual video. Well done India again.