Panguil Bay Pridge Project Update as of May 14, 2024
ฝัง
- เผยแพร่เมื่อ 13 พ.ค. 2024
- Panguil Bay Pridge Project Update...
May 14, 2024....
Main Bridge Pylon 1 and Approach Bridge 1 is now Connected...
#panguilbaybridgeproject #panguilbaybridge #panguilbay #construction #constructionequipment #surveying #surveylife #constructionlife
Amaizing. It is beautiful. Hopefully this will lead to the developments on this area but care to mother earth.
Duterte salamat ❤
So nice, thanks for sharing this video though sobrang bilis but I enjoy watching it!
Oo nga po mabilis ang pagkaka video. Mabuti tinuruan ako ng Anak ko nababago pala ang Play speed ng Video. e click mo lang yung GEAR sa top right ng screen while playing the Video then makikita mo Normal speed so adjust mo lang sa 0.5x para bumagal. Don’t mind the sound kasi po babagal din. Enjoy watching.
Thank you sa update idol
Panguil Bay is an arm of Iligan Bay in Mindanao, Philippines. The bay forms the natural boundary separating the Zamboanga Peninsula from the rest of the island of Mindanao. It borders the provinces of Misamis Occidental, Zamboanga del Sur, and Lanao del Norte. Wikipedia
Thanks tatay digong
Masyadong mabilis camera mo bosing, nagmamadali parang hinahabol.🏃🏃😜😜😜Pero maraming salamat at na update mo rin.
sorry, sa pag edit lang po, para hindi lumampas ng 4 minutes.
With the bridge soon to open, Tubod will not anymore be "too cool" for applying to cityhood.
Galing nmn dugtong na. Thanks to Former president Duterte
no sidewalk?
No provision for parking in case of emergency.and sidewalk for pedestrian to use.
sir ilang days lang po ba curing time ng mga concrete ginamit dyan??
Sana palampasin nila sa curing time para sguradong matibay.
may test ng curing for 7, 14 and 28 days po, pasado naman lahat, and the preparation from forms to concrete pouting takes 2 weeks po..so i think its good.
Dha nko mo age f mo bakasyun ko sa tudela, dli😂na sA molave
Budlay ug mka surpass ana Ang bngag. Pandemic time pa na ha.