Actually that is a structural issue. Structure engineer should design it according to the location and soil investigation report so that is a topic where we might not misguide some of the people so we are not covering it at all
Ground floor main kuch cases main jahan bye laws nahin hote wahan loug 5 marle main choote doo bedroom banate hain aur 10 marle main eik bedroom bhi ground par banaya jaata hai aur doo bhi. 5 marla main bhi aisa hi case hai
Sir aap 60% se bhi kaam kar sakte hain lakin jin gharoun main proper cabling hote hai aur proper earthing us main itni hi lagti hai and of course when you are giving estimate, you are just giving idea of 1-2 case studies.
Mash Allah both information Mila hair is video se thanks
buhat shukariya
Great information...
Thank Junaid Sahib ❤. Keep it up ❤️🥰
Welcome sir
Good Tanveer Jandran Sb !
Hamara ETEST Academy ki building ka project bhi Tanveer Sb ne complete kia hai.
Good Furqan Brothers Electrical Engineers
Thanks for your feedback
Nice Tanveer Sb !
thanks
Ma sha ALLAH
shukariya
اسلام علیکم ۔۔ جنید بھائی ۔۔۔ سولر اور۔ یو پی ایس کی وائیرنگ مس ھو گئی ڈسکشن میں 😊 ۔۔ اس کو اگلی ویڈیو میں ضرور کوور کیجئے گا ۔
Sir us par poori video alhaida se ho gi haar size ke ghar par inshallah
Please create a video on steels quantity in tons required in single or double story of 5 marla house
It depends on structure design of a house. It cannot be closely guessed
Actually that is a structural issue. Structure engineer should design it according to the location and soil investigation report so that is a topic where we might not misguide some of the people so we are not covering it at all
5 marla main 2 bedroom aur 10 marla main b 2 bedroom. Wah yr.
Ground floor main kuch cases main jahan bye laws nahin hote wahan loug 5 marle main choote doo bedroom banate hain aur 10 marle main eik bedroom bhi ground par banaya jaata hai aur doo bhi. 5 marla main bhi aisa hi case hai
میرے حساب سے زیادہ سے زیادہ %60 کیبل لگے گی
Sir aap 60% se bhi kaam kar sakte hain lakin jin gharoun main proper cabling hote hai aur proper earthing us main itni hi lagti hai and of course when you are giving estimate, you are just giving idea of 1-2 case studies.
😂😂😂