Kiverco Bespoke Plant. Client:Collards. Location: Oxfordshire, UK. Application: C&D.
ฝัง
- เผยแพร่เมื่อ 22 ต.ค. 2024
- This Ks 514 comprises of :
Feeder
Vibrating Screen
ASU (mid-size)
Magnet (mid-size)
Air Knife (oversize)
3-bay sorting station
Magnet
Generator or mains power
The Ks 514 installed at Collards can recover up to 8 products from mixed C&D waste.
The throughput is up to 30tph.
airbelt