ความคิดเห็น •

  • @pete5668
    @pete5668 10 ปีที่แล้ว +254

    spaghetti track

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +51

    Keep in mind that the "wobbly" tracks seen in the Thumbnail is the result after the train had passed through. Prior to this the eyewitness said the track was fairly straight with a slight buckle near the join of recently re-sleepered rail with steel sleepers.

  • @TheSkiddey
    @TheSkiddey 11 ปีที่แล้ว +160

    i remember when i would run out of straight tracks so i would make do with a few curved ones.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +38

    In Tasmania, where this video was taken, the gauge is 1067mm (3'6"). Whilst in other Australian states the gauge varies from 1600mm (5' 3"), 1435mm (4' 8 1/2"), and 1067mm (3' 6"). The main rail corridor linking the main Australian cities from Brisbane, Sydney, Melbourne, Adelaide, Darwin, and Perth is "Standard Gauge" 1435mm (4' 8 1/2").

  • @Radionut
    @Radionut 10 ปีที่แล้ว +153

    Wow that track looks like my bad back

  • @cyborgbadger1015
    @cyborgbadger1015 9 ปีที่แล้ว +200

    I thought the drink was kicking in when I looked at those rails.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +17

    The train was eventually stopped about 4 minutes later. Some eye-witnesses contacted Train Control (they were train spotters - they had the number) - and Train Control rang the driver to stop. The train driver was not aware because it was wagons at the back of the train that came off.

  • @tasmaniantrains
    @tasmaniantrains 10 ปีที่แล้ว +8

    Thank you very much Paul, and greetings from Tasmania.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +7

    As the enginemen were unaware of what was happening behind them, the train continued to spray the track off its bed.
    I'm led to believe the train was doing the normal speed for that section (Derwent Park to Bridgewater) and that Tasrail ruled out speed as a contributing factor to the derailment (see TV News reports).

  • @okiown2
    @okiown2 10 ปีที่แล้ว +2

    thank you very much for the upload

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +5

    This was filmed in Australia, on the island state of Tasmania where an 1067mm gauge freight-only system operates. Up until 10 years ago the motive power was dominated by "English Electric" diesel locomotives but in recent times both GM-style and rebuilt EE locos have taken over.

  • @aidenmorillo2031
    @aidenmorillo2031 8 ปีที่แล้ว +79

    I Love Trains So Much

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +2

    The track was straight before the train approached, except for one small buckle near where wooden sleepers had been replaced with steel ones. The driver (one-man crew) obviously didn't see the buckle, or thought that the train would ride through with no problems.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +7

    The sleepers (ties) in this section are steel, and only had recently been inserted a few days before the derailment to replace old timber ties (the removed timber ones can be seen laying on the ground next to the track on the right).

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +9

    It was a very warm day (early January) and a section of track (not seen until 3:12, left of screen) had very recently been replaced with steel sleepers and was loosely ballasted (my speculation).
    Sadly the buckle is not filmed before the train's arrival. The zig-zagging track seen after the train has left was probably caused by the combined weight of the 3 locos and 24 loaded container wagons pushing the track around underneath it.

  • @Cyclist0623
    @Cyclist0623 11 ปีที่แล้ว +7

    Well that one has been just waiting to happen for a long time! What incredible tracks. They cannot have been laid that way. The bed must be terribly prepared, and totally unstable. One gets these quick, short back-and-forth sways when the bed won't support lateral forces from swaying and turning on curves. This bed's got it BAD!

  • @WSTLNZ
    @WSTLNZ 11 ปีที่แล้ว +2

    It's called a BUCKLE (normally caused by extreme heat) & is often prevalent in welded rail sections, where the rail expands but cannot lengthen into (short rail section) "fish-plated" joints, thus is UNDER COMPRESSION which moves outward (often a rapid event) mostly situated at a slightly out-of-line rail joint, near loose/newly-reworked ballast.
    There had been major resleepering here & in a short distance the "ballast" would have been loosened; as when resleepering the track is often "LIFTED".

  • @vrfan
    @vrfan 11 ปีที่แล้ว

    Thanks for uploading. Interesting video.

  • @pcorf
    @pcorf 10 ปีที่แล้ว +29

    A train with some real twist.

  • @bellelavictorie61
    @bellelavictorie61 9 ปีที่แล้ว +2

    Those steel bars were straight before the train ran over it. Just thinking of the amount of energy necessary to turn railroad tracks into spaghetti is mind-boggling.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +3

    I'm led to believe that a buckle had formed in the track during the day but went un-noticed as there was no activity on the line until No. 736 had arrived late in the afternoon. (The buckle was located about 15-20 metres past were the camera is positioned, to the left of screen).

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +2

    Yes, Tasmania has 3'6" (1067mm) narrow gauge system. The same as Queensland and Western Australia. Over history however, Tasmania has had numerous gauge lines around the island, ranging from 2' gauge to 5' 3" broad gauge.

  • @DarkSignal59
    @DarkSignal59 9 ปีที่แล้ว +63

    when i saw the thumbnail i thought : " no train can pass through that, whoever made the tracks has no knoledge of how tracks work " >:O
    and then the unexpected happened : how that train got passed the part at 3:00 i'll never know, regardless of the later derailment ._.

    • @Awesomeman1987
      @Awesomeman1987 9 ปีที่แล้ว +3

      DarkSignal59 hahaha, I thought that he swung the camera around just in time to catch it derailing, but nope, she somehow held on thru that chicane.

    • @deanruth1815
      @deanruth1815 9 ปีที่แล้ว +1

      Show us the farstes and longest trains

    • @tasmaniantrains
      @tasmaniantrains 9 ปีที่แล้ว +11

      DarkSignal59 The tracks in the thumbnail shows the track after the train had gone through, not before. There was a slight buckle in the track before the train went through (sadly not seen), and when the train went through it, it pushed the track around.

    • @RussellCardozo
      @RussellCardozo 9 ปีที่แล้ว +7

      iAmDaos it's not the one who made the track it's the one who made the wheels of the train, . Many tracks become like this one due to hunting oscillation.

    • @RRBuilder611
      @RRBuilder611 9 ปีที่แล้ว +1

      ChunkyMagicrug That's and understatement. He was probably on weed, shrooms, drunk, and who knows what other drugs he was on. He was just messing when he designed it. He said "Hey come look at this! Lets see what people would do if they saw that! Huh? What? Oh this is real? It was just a joke!" Now, go to 3:00. That happend because of Mr. Shrooms n' Weed.

  • @annehaight9963
    @annehaight9963 8 ปีที่แล้ว +23

    Now that is some messed up track. I wonder if the narrow gauge was part of the problem? At the beginning I was thinking that train looked awfully wide for that narrow track. One problem and gravity takes over, and the next thing you know the train is pulling the rails all over the place.

  • @AtsfMike559
    @AtsfMike559 10 ปีที่แล้ว +5

    From the video, it looks as like they have had problems with that section of railway line in the recent past, as evidenced by the loose, crooked tracks, and that pile of ties off to the side. So work had been done there just prior to the accident. Next, it looks to me like whoever paved the roadway at the crossing, left asphalt over the railheads, which might pose more of a problem in narrow gage as the trains are lighter than say, 4' 8 1/2" standard gage. Great video. Mike in Fresno, Ca.

  • @robertgift
    @robertgift 11 ปีที่แล้ว +2

    Great catch! Thank you for your comments about it.
    How fortunate that someone knew who to call to get the train stopped!
    Did you see that area before the train arrived and rolled over it? Anything unusual about it?
    Thank you.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +3

    New Zealand has some fantastic railways. In recent years old Queensland locomotives re-built in New Zealand have been operating in Tasmania.

  • @pbwake65
    @pbwake65 9 ปีที่แล้ว +5

    Railways come from Great Britain. Why is it that in some countries the engineers can't gauge the track properly! The trains wouldn't come off the tracks in the first place. The GB Gauge is four feet and eight-and-a-half inches or 1435mm. If your country's track is a different gauge, then there are machines available that can lay decent track by computations around the track bed area for single or double track configurations. These machines can also sort out the stability of the track on the ballast. Have a look at Huyton Roby videos. To see how we do this in GB. At one time the track in say the North America was not straight and here in GB we had to build special locomotives at the Vulcan Locomotive Works just to run over North American tracks.

  • @coldblue9mm
    @coldblue9mm 11 ปีที่แล้ว +3

    The recently retied track was unstable and went out of alignment under the train. This is called a "Track Buckle" or Solar Misalignment (due to heat). Sometimes they are referred to as "Sun Kinks". Whatever you call them, this track should have had a proper slow order placed on it until it was stable. Or you can distress the track by removing some rail. Usually a couple of inches or so. Somebody was asleep during the tie replacement procedure.

  • @Muswell
    @Muswell 9 ปีที่แล้ว +2

    That has to be the longest train ever in the World. Didn't think I was ever gonna see the end of it !

    • @bagnome
      @bagnome 9 ปีที่แล้ว +2

      That's about how long the average train is here in the US and are, and I believe that is the same with Australia.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +2

    Yes, the steel or wooden beams that the two rails sit on, they're called 'sleepers' in Britain, Europe and Australasia.

  • @slendersausage
    @slendersausage 11 ปีที่แล้ว +1

    I agree with you that this was also a contributor to the issue along with the narrow gauge and weight of the load.

  • @microbusss
    @microbusss 11 ปีที่แล้ว +1

    oooo I want those level crossing signals!
    Great catch too

  • @roids70
    @roids70 11 ปีที่แล้ว +1

    wow i did not know this happened, its awesome to know the things that happened in our home state

  • @TheMichaelWilcock2016Railways
    @TheMichaelWilcock2016Railways 11 ปีที่แล้ว +1

    Always amazed how there are no fences along trackside in your country.
    Mike in Wales

  • @FredNurk
    @FredNurk 11 ปีที่แล้ว +5

    5:33 He won't get too far with the shovel !

  • @scdevon
    @scdevon 10 ปีที่แล้ว +17

    Why were they traveling at that speed on such lousy track? That track is insanely bad.

  • @ChachaChapati
    @ChachaChapati 9 ปีที่แล้ว +1

    Fascinating little island...

  • @MilwaukeeF40C
    @MilwaukeeF40C 9 ปีที่แล้ว +44

    What shitty alignment work.

    • @TheSonic10160
      @TheSonic10160 9 ปีที่แล้ว +4

      It uh, probably wasn't like that before the train went over it.
      I've seen some of their tracks though, really poor trackwork. Rough as shit.

    • @keithbarber4502
      @keithbarber4502 9 ปีที่แล้ว

      Samuel Zelter b

    • @tackssherbo7104
      @tackssherbo7104 9 ปีที่แล้ว

      Neddskorg Today's the first day I ever heard of a heat buckle. Will make a serious mental note of that and take trains only when it rains!

    • @tackssherbo7104
      @tackssherbo7104 9 ปีที่แล้ว

      Neddskorg Yikes. Better stick to a mule. :)

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +1

    Its apparent that the whole section was so loosely-packed - if not packed at all, that the rail bed has just given-way under the weight of the train. With no-where to go the continuously-welded rail moves side-to-side, creating the "wobble" look.

  • @KJBFAMILY
    @KJBFAMILY 11 ปีที่แล้ว +2

    the track is not laid like that. Thermal expansion in the rails will cause it to deform at the weakest point. ie corners. Same thing with bridges that is why they have gaps in them to allow for the expansion/contraction of the material used during different times of the day/season. In the case of the rail system hot steel will be considerably longer than cold steel. Normally not an issue unless you are dealing with very long lengths connected together.

  • @BushCampingTools
    @BushCampingTools 8 ปีที่แล้ว +10

    Pretty embarrassing being an Aussie with such crappy tracks, not jus there but Australia wide compared to many countries.

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +2

    Apparently there was some track buckling there before the train arrived, although not thought as serious enough to cause concern or at least film it.
    Some people/enthusiasts who follow and watch trains regularly will often have the phone number for Train Control (it's a publicly listed number), so its not surprising that somebody was able to contact Train Control once they saw that some wagons moving but off the rails.

  • @bettyboop65340
    @bettyboop65340 11 ปีที่แล้ว

    thank you

  • @2401aditya
    @2401aditya 10 ปีที่แล้ว +7

    At 3:12 I was like WTF, are they railway tracks or a rock n roll track ..!!

  • @pjm329
    @pjm329 9 ปีที่แล้ว +14

    This train was going way too fast for those horrible track conditions.

  • @WSTLNZ
    @WSTLNZ 11 ปีที่แล้ว +1

    And of course it's also a "given" that 4'8+1/2 " gauge - WAS the usual gauge at that time.! As "existing" collery railways (using horses as their locomotive power) NEEDED an extra wide "gauge" to allow two horses working SIDE BY SIDE (without damaging their hooves on rails either side) & that George Stephenson was farsighted in realising that individual lines would eventually NEED to be joined together, thus the need to have the same ONE gauge, (which is now used throughout much of the world).

  • @rico334
    @rico334 11 ปีที่แล้ว +1

    What did you do to the track to make it do that ? How else would you know to set the camera up at this particular point ? ? ?

  • @RODALCO2007
    @RODALCO2007 11 ปีที่แล้ว +2

    That is a long train for the 3ft6 gauge. It is going pretty fast going for those curves before it derailed.

  • @brianspurrell9670
    @brianspurrell9670 9 ปีที่แล้ว +1

    Summer in Australia. It is brutal on rail alignments. The rail looks buckled even before it the train gets to the section of track in question. Concrete ties would help stabilise the rail.

  • @WSTLNZ
    @WSTLNZ 11 ปีที่แล้ว +1

    Oh..?
    And i "think" from memory..
    The Japanese hi-speed (bullet) trains.. also RUN on 3'-6" gauge track.
    Usually the tighter the gauge .. the better kept is the trackwork.
    As Railway companies actually DO understand the concept of: "good maintenance relates to LOWER operation & maintenance costs".

  • @Salmagundiii
    @Salmagundiii 11 ปีที่แล้ว +1

    I think that could be a factor. I was surprised to see that narrow gauge trains are able to transport those huge Maersk shipping containers. They are 8 ft. wide. So on standard gauge they have a roughly 20% overhang on each side. On 3'6", it's almost 30%.

  • @shadyG4life
    @shadyG4life 10 ปีที่แล้ว

    Unfortunately I will never get that 6 min back

  • @ActivistVictor
    @ActivistVictor 11 ปีที่แล้ว +1

    I'll admit I was expecting a bit more, but I'm also glad it wasn't worse than this. I never like it when people get hurt.

  • @slendersausage
    @slendersausage 11 ปีที่แล้ว

    the weight of the train is kept in the length, width and low to the track making sure that it can run on narrow gauge.

  • @karelfromholland
    @karelfromholland 11 ปีที่แล้ว

    Bad rail maintenance. Good video ;o)

  • @HotForgeChaos
    @HotForgeChaos 8 ปีที่แล้ว

    Got any footage of the ex-NZR DC and DQ classes running around?

  • @nb117
    @nb117 8 ปีที่แล้ว +1

    The speed on that line in the US would be like 10 MPH at most. Yikes !!

  • @KrazeeClark
    @KrazeeClark 11 ปีที่แล้ว +1

    Thank you, that's a great answer to why it jumped off the track. Once it was off the track, why didn't the engineer know immediately? Wouldn't there be tons of drag from 9 cars derailing and being dragged along?

  • @satyanarayanasatyam6047
    @satyanarayanasatyam6047 10 ปีที่แล้ว

    Nice video

  • @sonnydean1617
    @sonnydean1617 9 ปีที่แล้ว +5

    Those Sherman neckties should have been replaced!

  • @MrJohndoakes
    @MrJohndoakes 10 ปีที่แล้ว +7

    Classic derailing ACTION!

  • @abhisheksoni9841
    @abhisheksoni9841 11 ปีที่แล้ว

    Its really axciting too see thanks to show mee ths

  • @megatwingo
    @megatwingo 11 ปีที่แล้ว

    Very interesting footage. Thumbs up! :)
    Greetings
    Mega

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +1

    Yeah, one of those things. I know the video guy on reflection knows he should have filmed the track buckle before the train came.

  • @anuragparanjpe
    @anuragparanjpe 8 ปีที่แล้ว +3

    is this narrow gauge?

  • @ThePostal67
    @ThePostal67 11 ปีที่แล้ว +1

    That is interesting, the engineer probably had not a clue as it probably was fairly straight when he approached.. In the engine you rarely hear the trouble behind you. Embarrassing to arrive without some cars.. Glad no injuries, my dad worked a train in the states, the EJ&E, now absorbed by CN and the accidents they used to have always took lives..

  • @Okanagan48
    @Okanagan48 11 ปีที่แล้ว +1

    Narrow rail looks so odd when your used to seeing Canadian rail lines standard gauge.

  • @thegeforce6625
    @thegeforce6625 10 ปีที่แล้ว

    nearing 1 million views!

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว

    线很瘫软!感谢您的评论

  • @rsmith4508
    @rsmith4508 10 ปีที่แล้ว +5

    Thats is one JANKY ASS track!

  • @TheGalooch
    @TheGalooch 9 ปีที่แล้ว +2

    Looks like we gotta come down there and teach you boys some Gandy dancing!

  • @Marcikutyaful
    @Marcikutyaful 11 ปีที่แล้ว +1

    The density of the stone ballast wasn't sufficiently high, the longitudinal tension because of the rising temperature laterally pushed out the track at at the changing of layers.
    I can see this from the exactly other side of the Earth. Greetings from Hungary!

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว +1

    The train on this day was unusually long - 49 wagons. Fortunately the train didn't "fall off" the track as nobody wants to see derailments - for both passengers and freight - with the cost burden of line closure and recovery and ultimate inconvenience for customers.

  • @telfud2
    @telfud2 10 ปีที่แล้ว

    Unfortunately you will never be an individual.
    My God, cant u come up with a more original comment than that.
    U are so original dude.

  • @ZakkRobinson
    @ZakkRobinson 11 ปีที่แล้ว

    As someone who is British, I couldn't agree with you more! Its like a glorified refugee camp here in the UK!

  • @ejcmoorhouse
    @ejcmoorhouse 11 ปีที่แล้ว

    I should imagine the sun has a part to play in bending the tracks as do the big trains on the narrow tracks. More maintenance is needed here.

  • @CZ350tuner
    @CZ350tuner 10 ปีที่แล้ว +2

    The other 3 are 2 supervisors and 1 health & safety observer.

  • @BumAngel2001
    @BumAngel2001 8 ปีที่แล้ว

    When I saw the empty carts I knew all hell was gonna brake lose because they didn't have the weight, but the good thing is that empty carts hit the weak point

  • @fmaxwellable
    @fmaxwellable 10 ปีที่แล้ว +5

    It was caused by swaying motion of the train called "hunting oscillation."

    • @budhansen2815
      @budhansen2815 10 ปีที่แล้ว +1

      no...that was just rotten sleepers..

    • @MilwaukeeF40C
      @MilwaukeeF40C 9 ปีที่แล้ว

      Bud Hansen
      Reverse curves don't help, especially with rotten sleepers.

  • @bliesberg
    @bliesberg 10 ปีที่แล้ว +5

    For how bent up that track looks there's no way they should have been driving that fast.

  • @Fundgrube40
    @Fundgrube40 11 ปีที่แล้ว +1

    you did a very good job!!!!!

  • @tasmaniantrains
    @tasmaniantrains 11 ปีที่แล้ว

    This is absolutely right.

  • @sooper2dooper3
    @sooper2dooper3 10 ปีที่แล้ว +1

    they should make the tracks straighter.

  • @elnogga
    @elnogga 11 ปีที่แล้ว +1

    nope, a typical Australian railway is the (Stephenson) Standard gauge which is 1,435 mm (4 ft 8 1⁄2 in). aka the international standard.

  • @holnrew
    @holnrew 11 ปีที่แล้ว +3

    They sound like British class 37 locomotives, I wonder if they have the same engine.

  • @antimosh
    @antimosh 11 ปีที่แล้ว

    ZA Class, thought i could hear an EE V12 growl

  • @robzed2
    @robzed2 11 ปีที่แล้ว

    For goodness sake, the tracks were twisted up DURING the derailment, they weren't like that before the train tore it up!

  • @k0smon
    @k0smon 10 ปีที่แล้ว +1

    In need of some major maintenance.

  • @wmralder
    @wmralder 11 ปีที่แล้ว

    Am I mistaken or do those ties (sleepers) look to be steel? That or a concrete shape unique to Australia. If it's steel then it's hard to ballast them effectively with gravel. Whichever it was they held the tracks together even with a large lateral displacement.

  • @StrikerHS
    @StrikerHS 10 ปีที่แล้ว +29

    where is the derailment?

    • @ShutUpH00ker
      @ShutUpH00ker 10 ปีที่แล้ว

      Yeah.. it ain't Silver Streak.

    • @mikelewis4183
      @mikelewis4183 10 ปีที่แล้ว

      luchatroka alvarado guajardo

    • @wdowa94
      @wdowa94 9 ปีที่แล้ว +5

      at 3:00

    • @luchatrokaalvaradoguajardo5185
      @luchatrokaalvaradoguajardo5185 9 ปีที่แล้ว

      en australya-(BRISBANE) movimiento de tierra (dezlisamiemnto) de terrerno un temblor (hearthcuaque) saludos desde ameryka -¡ republika mexicana

    • @davinaclem8391
      @davinaclem8391 9 ปีที่แล้ว

      luchatroka alvarado guajardo the derailment is in Tasmania & was caused by the heat

  • @chuckyvanhoose8480
    @chuckyvanhoose8480 9 ปีที่แล้ว

    I'm surprised the train didn't get in derailment

  • @andyrob3259
    @andyrob3259 9 ปีที่แล้ว +3

    How do you not know your train has derailed? Do you not feel so,e drag in the train? Are you not constantly looking behind the train at your consist as well as ahead? I'm assuming these are not professionals?

    • @984francis
      @984francis 9 ปีที่แล้ว +1

      I would think that being in the cab of the front loco of three, one would have no idea what has happened halfway along a long train until the drag is enough to slow the mess.

    • @Gdddghhrwscbkjgesdcc
      @Gdddghhrwscbkjgesdcc 9 ปีที่แล้ว

      In theory, the cars detaching should have caused a loss of air pressure in the brake lines which would have been noticed in the locomotive and caused the brakes to apply automatically. It is possible however to clamp off a section of the train's brakes - like if you know you have faulty brake hoses. The last cars looked like they were ready for the scrap yard.

  • @szlakowiec
    @szlakowiec 10 ปีที่แล้ว +6

    Powiedziałbym, że jechał wyjątkowo śmiało jak na stan techniczny torowiska. Nie było ograniczenia ? A może nie zauważył ? Kanał SUB.

  • @adarshk7
    @adarshk7 10 ปีที่แล้ว +1

    This looks like the heat issue became too much... Also do they work on the ballasts often?

    • @tasmaniantrains
      @tasmaniantrains 10 ปีที่แล้ว +2

      The Ballast has infrequently been replaced over the years. The height of the track has also risen substantially over the years because of the higher ballast bed (in some places the track is now the same height as old station platforms along the way). This section of line is scheduled to close in mid 2014

  • @warfinn8816
    @warfinn8816 10 ปีที่แล้ว +2

    Alright, who's idea was it to make a squiggly line track?

  • @4onados
    @4onados 11 ปีที่แล้ว

    Is Australia a small distance between the rails or is it a narrow-gauge railway?

  • @RODALCO2007
    @RODALCO2007 11 ปีที่แล้ว

    It looks good and sounds great

  • @mrduplone
    @mrduplone 10 ปีที่แล้ว

    Wow. It must take so long to crane up all the stock, move them to a safe section and get going then.

  • @rolfen
    @rolfen 11 ปีที่แล้ว

    That shape on the tracks can't be good.