Cromford Wharf N gauge shelf Layout Part 2 (Painting the Rail sides, Point Levers, buffer stops)

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ก.ย. 2024
  • After a long wait, finally able to get on with more work on the N gauge Layout,
    This time painting the sides of the rails, look at the wiring, Buffers stops, point levers and ground signals.

ความคิดเห็น • 3

  • @gregkelleher8994
    @gregkelleher8994 หลายเดือนก่อน +1

    I've just come across your new project and I'm about to watch episode 3. A quick question, what are the dimensions of your layout? Cheers.

    • @PaulsRailwayModels-vz9oz
      @PaulsRailwayModels-vz9oz  หลายเดือนก่อน +1

      Hi Thank you for watching , The layout is 80cm x 33cm x 26cm LWH and with the fiddle yard its 141cm L

    • @gregkelleher8994
      @gregkelleher8994 หลายเดือนก่อน

      @@PaulsRailwayModels-vz9oz thanks for that. Cheers.