इन दिनों बड़ी कंपनी भी training कभी कभी ही देती हैं जिससे process को सही रुप से समझने में मुश्किल होता था। आज youtube के द्वारा और अच्छे youtuber के द्वारा सुलभ हो गया है। अब सीखना आसान और सस्ता हो गया है। आपके प्रयास सराहनीय है।👍🌹
Well explained bro, thank you You explained almost everything of sealing in STG and also provided the better understanding of GVC and Ejector. Having clear voice to get understanding of the topics
Hi Bro I watched all your Vedios from yesterday regarding Turbine ...one of the best explanation you given with your Vedios .... thank you for your efforts
Thanks bro bohat achi informative video hay, self sealing k baray main bhi clear ho gaya ab k jab turbine full load pe hoti hay to Gland steam control valve ki position kam hoti hay or jab half load ya reduce load pe hoti hay to Gland sealing valve ki position ziyada ho jati hay ye sab self sealing ki waja se hay theek samjha hu na main bhai lazmi reply karna. Thanks bro once again.
Thanks for all youre lesson even if i can not understand youre language i still watxh youre videos ..i am from philippines i work in biomass power plant as a tender of power house operator.. I learn a lot sir thank u..hope youre new coming videos have a english subtitle..god bless
Highly informative video. The way you have explained the concepts is highly commendable ...thank u very much .. Learned lot of from your video...please keep posting videos
Thank you So much sir, aap bahut hi acche tarike se explain karate hai, sare doubts clear ho jate hai aapaka video dekhane ke baad. Aapka mail id ya contact details hai to please share kijiye.🙏🙏
nice work... missing in this video (1) which one is first take ejector (hogger) or Gland sealing with GSC fan or ejector (2) why maintain GSC level minimum (3) if turbine stop and GSC fan available then it is cooling to turbine casing temperature? plz update this in vidio discription.
Sir very nice video. I want to clear my concept. In my power plant we have HP/LP single casing turbine. We take gland steam from hp steam header where the pressure is 90 bar so how that pressure is reduced to pressure a little greater than atmospheric pressure. Attemperation reduces temperature so what will be the effect of attemperation on steam pressure. As introducing water spray decreases temperature but on the other side number of molecules increases.
I prefer your channel for power plant related topics..
I am getting new lessons everyday from your videos. No one can learn so much while in operation. Thank you very very much👍👍
Most welcome ☺️
इन दिनों बड़ी कंपनी भी training कभी कभी ही देती हैं जिससे process को सही रुप से समझने में मुश्किल होता था। आज youtube के द्वारा और अच्छे youtuber के द्वारा सुलभ हो गया है। अब सीखना आसान और सस्ता हो गया है। आपके प्रयास सराहनीय है।👍🌹
Really true
Thanks you Sir ji aapke samjhane ka tarika bahut hi achchha hai.
Bahut hi badhiya lesson tha sir thank you sir aapne apna knowledge sabke sath share kiya
Most welcome dear❤
Sir aap ki vedio hai aap bahut acche se samjhate hai aur mai use bahut acche se samjh pata hu thanku sir
Thanks dear
Shandar...u have very good knowledge about power plant.. 👍
Hello sir your all video is best . I done my BOE with the help of your video for power plant ..
Your videos helped me alot when I started work in operation duty
Thanks sir aap bahut achhe se smjhate ho
Most welcome dear
You are just like as God.
What a super understanding and way of describing , amazing
Thank you thank you so much ♥️
Extremely helpful
Thank you so much
Not even my professor in canada was able to explain it this well
Thank you so much
Sir Aap Power plant me work karne walo ke liye mashiha hai Itni simple language me samjha dete hai 🙏
It’s very much better for power plant engineers as well as for beginners nd concepts ll be clear very much for all who r having doubts
Thank you so much ♥️
Thanks a lot bro ,I am from Hyderabad, I know hindi 50% but I understand your videos very well, thanks lot for making such a wonderful videos
Well explained bro, thank you
You explained almost everything of sealing in STG and also provided the better understanding of GVC and Ejector.
Having clear voice to get understanding of the topics
Keep explaining us
Your way to explaining is awesome . Thank you for your help to understand a lot of about power plant operation.
Most welcome ♥️
thxs for good explanation
Most welcome ☺️
Samjhane ka sandar tarika he aap ka
Thanks a lot
Good
Very useful topic, Thanks
Good bless you
Thank you so much
Thank you vai... it's really knowledgeable for new people in a power plant...Love from Bangladesh.
Thank you so much❤
Superbly explained sir.
Thanks a lot dear ♥️
From your vedio I learned very good 👍 thanks
your way of explaination very easy...
Now my understanding of self sealing is clear. Thank you :)
Most welcome 😃
Your teaching very very good sir...
Thank you so much dear ♥️
Hi Bro I watched all your Vedios from yesterday regarding Turbine ...one of the best explanation you given with your Vedios .... thank you for your efforts
Thanks bro bohat achi informative video hay, self sealing k baray main bhi clear ho gaya ab k jab turbine full load pe hoti hay to Gland steam control valve ki position kam hoti hay or jab half load ya reduce load pe hoti hay to Gland sealing valve ki position ziyada ho jati hay ye sab self sealing ki waja se hay theek samjha hu na main bhai lazmi reply karna. Thanks bro once again.
Ha self sealing hi reason h control valve fluctuation k lie during load fluctuations.
Indeed a informative video explained in most easy way... Thank you
Very nice, very informative video
Such a great explanation supperb 👍
Thank you so much
Realy awesome way of explaining.
Thank you so much
Wonderful explaination 🙏🙏🙏🙏🙏
very nice lecture sir.i understand fully cleared
tnx a lot
Most welcome dear
Excellent explanation God bless you dear sir
Thanks a lot dear
Sir !! I am working in a Power plant your video are so valuable for me ,Thanks a lot sir .sir plesae tell about your self ....
Dear m presently working as shift incharge in a 90MW of total capacity of CPP.
Thanks for all youre lesson even if i can not understand youre language i still watxh youre videos ..i am from philippines i work in biomass power plant as a tender of power house operator.. I learn a lot sir thank u..hope youre new coming videos have a english subtitle..god bless
Thank you so much for watching me!
M trying to provide English subtitles in upcoming video thanks
apaka jo version hai maind mai joldi ghus jata hai thanks sir
Most welcome dear
Very nice I learn from your video
Thanks a lot
Thnx very much brother very informative video
Most welcome ♥️
Sir u explained very perfactly...
Thanks dear
Very well explained sir. THANKYOU
Most welcome dear
Ur best bro I need start up and maintainance of turbine
Sure I'll start
Very nice explained bro..!!
Thanks a lot
DM plant se related videos bhi bnaiye sir
Dear I have already uploaded please check my playlists of DMP
@@PowerPlantDiscussion ok sir and thanks for all awesome explanations it's very easy to understand 👏👏
Very valuable lesson thanks
Sir ji bahut he accha video h
Very good explanation.Thank you💯
Most welcome ♥️
Very fruitful information..thankss
Thanks
Thank you for your clear training.
Great understanding video
Aapka video bhut bdiya h sir👍👏.
Gas turbine pe ek video bnaeye compressor+combustion chamber+turbine+Alternator ko ek sath lekr with parts.
Sure dear I'll make
Good, knowledgeable video
Thanks
Love u sir from pakistan. Kamal ki video hy
Thanks a lot dear
Good teaching sir 🤝
Very nice explation... Thnx
Most welcome
Very well informative video
Thanks a lot
Itz superb shab...
Thanks dear
Hello sir big fan...from nepal
Thank you so much dear ♥️
Nice explain sir 👍👌
Thanks a lot dear
Now it hs cleared point to point .....
Thanks
wow nice explanations.
Thank you so much
Thanku sir... all my doubts have clear
Most welcome ☺️
Highly informative video. The way you have explained the concepts is highly commendable ...thank u very much .. Learned lot of from your video...please keep posting videos
Thank you thank you so much ♥️
9
9
9
9
Bahut acchey sir....
Thanks a lot dear
Sir i m ur big frnd i see all ur vdo thank u very much sir u r great nd God bless to ur family 👍👍👍
Perfact explaination sir👏
Very nice video sir
Fantastic information
Thanks
really good.....what is Eccentricity, sagging or hogging
Thank you..very informative
Very nice experience
Thank you so much
Sir gland steam cooler ek video banaye
Sure dear I'll make
Thank you So much sir, aap bahut hi acche tarike se explain karate hai, sare doubts clear ho jate hai aapaka video dekhane ke baad. Aapka mail id ya contact details hai to please share kijiye.🙏🙏
powerplantdiscussion@gmail.com
Nice vdo sir... thanks.. higher capacity unit me extraction k related vdo please bnaiye...
sir mujhe indristal me ro plant ka feed se lekar decharg tak ka system bataye please
I have already uploaded video on this topic, please search my playlists of DMP.
Nice informative video Sir❤️
Thanka a lot dear ♥️
Very Nice Sir plz keep it up
U do very good job
Great sir....
Thanks dear
Very nice sir good morning sir 🌹🙏🙏🌹🙏
Well done
Thanks
nice work...
missing in this video
(1) which one is first take ejector (hogger) or Gland sealing with GSC fan or ejector
(2) why maintain GSC level minimum
(3) if turbine stop and GSC fan available then it is cooling to turbine casing temperature?
plz update this in vidio discription.
Sure
Plz explain about vaccum pump
Sure I'll make
Ejector me gvc pr. -ve ki jagah +ve aa raha hai, ye problem solve kaise kare ? Jabki floyat bhi sahi kam kar raha hai.
Danyawaad bayyaji 🙏🙏🙏
Do you have benda & rolling machine for manufacturing J fins?
Very good 👍
Thanks a lot
Nice tutorial...grt one..
Thanks
Back pressure turbine Pai ek video banaye sir..
Very nice need more videos
Sir very nice video.
I want to clear my concept. In my power plant we have HP/LP single casing turbine. We take gland steam from hp steam header where the pressure is 90 bar so how that pressure is reduced to pressure a little greater than atmospheric pressure.
Attemperation reduces temperature so what will be the effect of attemperation on steam pressure. As introducing water spray decreases temperature but on the other side number of molecules increases.
Very good sir
Sir jab ejector se non condensible gases remove krte hai tab vacuum bn jata hai hai fr alag se bnana pdhta hai ?
Good job 👍👌
Thanks a lot 😃
Goodwork❤
Sir I want to know about antisurge control system for centrifugal compressor
Thank you very much sir ❤🙏🙏🙏
Sir,
TG BREAKER Kab use krte hai
Sync.TG to GRID or GRID to TG SYNCH. ke
Advantage & disadvantage . Plz ispar vedio banao sir
Sure dear I'll make
Great bro, subscribed.
Nicely explained.
How vacuum created by injector and why.
Read Bernoulli's principle
My next video on ejector system, I have explained how vacuum is created please wait for the video.