Raising main full installation

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 มิ.ย. 2021
  • thus work done at pratapgarh district medical college. 33/440 Volt substation installation. all the done by Milan Goyal. the two raising main installed here in pratapgarh district medical collage one is 1000 amp And second is 630 am.
    #pratapgarhmedicalcollage
    #raisingmain
    #raisingmainkyahotihai
    #raisingmainfullinstalation
    #milangoyalreaction
    #technicalguruji
    #technicalgyan
    #khansir
    #narendramodi
    #electricalworks
    #LT HTworks

ความคิดเห็น • 8