  • 5500m2 of Optima TFC+ has been used in the completion of the brand new Science, Engineering and Environment building on Salford University’s Peel Park campus.
    As you can see from the photos, a striking colour palette has been used in the modified window interface details. Interpon’s D2525 Ostuni Y2211I, 3030 High Gloss & 7022 High Gloss in 3.0mm Aluminium 3103 Grade PPC were selected.
    The unique overhang window details were created using the 20mm overlapping joint that is standard in Optima TFC+. A bespoke sharp edge detail was added to window interface locations for dramatic effect creating a stunning visual contrast between the bright red window pods against the white vertical cladding as per the architect’s original design intent.
    Sotech assembled a full-size sample rig in the factory for the client, architect, main contractor and installer to view a full scale mock-up of the final proposed solution. This ensured that any design details or install sequences were scrutinised and fully understood before the project began onsite. Sotech then created a full 3D model of the project alongside their long-term partners Metclad Contracts. This allowed both parties to identify and avoid potential issues at the design stage before panels were fabricated and delivered to site.
    Project name: Science, Engineering & Environment Building, Salford University
    Location: Salford
    Sector: Education
    Installer: Metclad
    Main Contractor: Morgan Sindall
    Architect: Shepphard Robson