Company Training Evolution E-002 Fire Attack and Water Supply drill

แชร์
ฝัง
  • เผยแพร่เมื่อ 6 ธ.ค. 2023
  • Placing an initial attack line of 200' and back-up line of 200’ into service and flowing a min. of 300 gpm using two apparatuses. A reverse lay from the second arriving unit using 5" hose to a water supply (300’ away) shall be used. The objective is to complete the evolution in under 4:00.

ความคิดเห็น •