Good evening sir How much of labour required to remove cement sand plaster from 100 sq.ft wall Manually and by using mechanical chisel Plz reply sir its urgent
Helpfull in rate analysis for new engineers. make a rate analysis for Lead and lift for hill side cutting (hill cutting for formation) of soil, ordinary rock and hard rock.
Good evening sir
How much of labour required to remove cement sand plaster from 100 sq.ft wall
Manually and by using mechanical chisel
Plz reply sir its urgent
Approx two labour for 100 sqft, and one labour for mechanical chisels
plese give your excel file link
Sir is gtx1050 is good for 3d autocad modeling or I should go for the mx250 or 150 laptop please reply
1 km distance ka kaise nikalenge,
Usper bhi bana. Dijiye
Thanks sir my feedback your comming video
hello sir, please make a video on all building items individual rate analysis because your videos very help for me and my all civil engineer friends .
Ok, will make soon, due to business i could not make video from a long time
Helpfull in rate analysis for new engineers. make a rate analysis for Lead and lift for hill side cutting (hill cutting for formation) of soil, ordinary rock and hard rock.
Sir can you share or guide rate analysis of transportation cost per cum/ km
Don't have right now, have to prepare, as I m working in real estate
Sir plywood shuttering ki rate analysis pr vedio bnado plz
Ok , sure, will upload soon
increse in thickness of wall & cover @ of concrete , reinforcement on same diamention for 0.60mx060m
drain
You have not taken dipper for disposing the earth
Rate analysis of rubble soling
Thank you !!
please do it in english language
Hi
I need to talk you.
May call at 7042679755
Make a video next topic
Upload a video 2-3 this sunday
Pls so requested
It takes time to prepare video, as I do job, I do not have so much spare time, but I will try to upload 1 video tomorrow