guys i need some insight, when i assign timetable based why some of the zone's demand is not doing the trip? is it because time tabular each line routes? or demand time? or assignment time? all of above i input from 05.00 to 22.00 (real operation of BRT). and also put regular service as headway which is depends on each route (15-40min).
guys i need some insight, when i assign timetable based why some of the zone's demand is not doing the trip? is it because time tabular each line routes? or demand time? or assignment time? all of above i input from 05.00 to 22.00 (real operation of BRT).
and also put regular service as headway which is depends on each route (15-40min).