l safety and awareness message to companies involved in trench work on their construction sites(s). Let's all work together to keep every job site safe! Don't neglect calling Miss Utility whenever the ground is being disturbed, ensure your company has a valid ticket number, wait for marks, verify Ticket Check postitive response and work safely. Let's all have an attitude of safety, every job, every day!
Thanks for the educational video. I have a question: I incorporated the images from your video into my research. How can I get permission to use the images and publish them in journal articles? Thank you.
why loudy music ?????? cant hear the instructor
I'm watching from Ghana 🇬🇭❤
l safety and awareness message to companies involved in trench work on their construction sites(s). Let's all work together to keep every job site safe! Don't neglect calling Miss Utility whenever the ground is being disturbed, ensure your company has a valid ticket number, wait for marks, verify Ticket Check postitive response and work safely. Let's all have an attitude of safety, every job, every day!
always do 1,5:1 slope for any excavation with depth less than 20 feet. it's a standarized safety for all type of soils
Thanks so much brother
Why is the pickup driving backwards up the street at 6:49?
Thanks be to the Lord. Amen.
Thanks for the educational video. I have a question: I incorporated the images from your video into my research. How can I get permission to use the images and publish them in journal articles? Thank you.
👍
👍
November
Good lesson
good techniques
If ypu are working in a city and replacing main waterpipes, what is you security measures for soil collapses?