Dear Raghuvir ji Can u please elaborate the current condition of damaged sukhtawa bridge. Is there any temporary bridge, on which cars can cross. In case of higher rain or overflow, temporary bridge working or closed temporarily. For bhopal nagpur travel
Raghav bhai apki company ne abhi tak is NH69 ka number kyu nhi change Kiya iska new number NH46 hai NHAI ki website pr b likha hai iske number change ke bare me
approach ka kaam max contractor khabab aur ghatiya karte hai.. gadi kisi bhi structure ke upar se jati hai to boht jerk feel hota hai. i hope aap logo ne approach slab dhang se kiya hoga aur soil compaction structure ke pass me bhi acche se hua hoga.
Raghav bhai, why are not the final ends of the approach roads to the bridge concretised to align with the bridge level? I have noticed that the joint tends to fracture and cause potholes because of the vibrations.
👌👌👍👍🙏🙏
Kisaan ekta zindabad 💪💪💪👍
Nice video
Thanks
welden great
Thanks
bhaiya aap bahut achcha video banaa
Thanks
nice video❤️❤️❤️❤️
Thanks
Ashi video bnate ho aap
Thanks
Good commentary along with vedio paver excellent technical support 👍
Thanks
I am. Waiting for your videos 😐🌹
A gyi he video
Fast comment fast like
Thanks
Frist Comment
Thanks
Road sahi he itati se betul tak
Ha bhai
Aaj aaj ki video theek hai
Thanks
Naya series chalu karo girder launching ka
Hanji
Hii
Hello
30k + सब्सक्राइब कि बधाईयाँ °®
Dhanywad Bhai ab 100k krvao.jalldi.....
@@Raghavsingh143 जी बिलकुल सर 😊°®
Ram ram bhai ji..🙏🏻🙏🏻🚩🚩
Ram ram
Machna bridge ki bhi update dijiye
Jarur
Very much nice
Thanks
Payer ka detailed vedio banao bai plz
Paver vogele 1800 ka
@@Raghavsingh143 ha bai controls samjhao
Bhai video quality 1080p rakho
Achha next time se krunga
Super
Thanks
Bhai Fave Reveal
Jarir
hevey driver ke lehe like to bantha hai
Hanji
Sir tawa dam dikhaiye na kbhi
Jarur
👍
Thanks
Good job sir👍👍👍
Thanks
Nice information 👍👍
Thanks
Technically very good videos .
Jai hind
Jai Badri Vishal
Jay hind
Bypass rod kb chalu honga shahpur bhaura ka
Bhaura ho jayega Diwali bad
Op
Nyc one bhai Ji ❤️
Thanks
Pader bypass and Sahpur aur Bhoura bypass kb start honga Sir g
Bhaura padhar Diwali bad
Bhai RMC plant ki video bnao kafi time se ni bnai
Jarur
Sir aapki compny ke malik kon hai
Aur video me batana जयहिंद sir जय श्री राम🚩🚩🚩
Shri jitendra Singh ji
Kon sa company ka crene hai
P&H
Sir sab bypass kab tak chalo hoga
Bhaura aur padhar Diwali bad ho jayenge
Bhoura bypass kb complete ho rha h sir
Diwali bad
Sir Koi Thermoplastic Marking or Signage ka work ho toh btao
Bhai company khud krti he
सर कुछ गर्डर में तार या केबल डालते है, वो क्यो?
Wo PSC grider hote he
@@Raghavsingh143 वो किस पुलिया में इस्तेमाल करते है
@@ankitgawande8269 aksar sabhi me... Jisme jada distance hota h. Usse strength aur load capacity badh jaati hai.
Highway per agle din kaha kaha Kam karna hai kon manage karta hai.
Pm sir he sabko apna apna Kam pta he kha Kya krna he aur kese krna he
Dear Raghuvir ji
Can u please elaborate the current condition of damaged sukhtawa bridge. Is there any temporary bridge, on which cars can cross. In case of higher rain or overflow, temporary bridge working or closed temporarily.
For bhopal nagpur travel
Today 2 time over flow 12pm and in the evening 8 pm
@@Raghavsingh143 is there any alternate route for bhopal nagpur.
Ye PSC Girder nhi hai kya
Nhi
Konse company hai apki
Jsipl
Bhai selrrye kitni h aap ki
Kam chal jata he Bhai is mahngai me
Bhai content to ane wala he 😅
Truck or cran fase ga he fassega
Mitti gili he sukhtva ki 1milion view coming soon 😄😆
Hehehe. Hope ...1m view
Gujarat me kabhi kabhi siment vali road dikh jati he or kabhi kabhi damar vali road dikh jati he asa kyu?
Wo village aur city me concete road bnta he aur normal jagah per damar
Bharat Mata ki jai 🙏👍💪🇮🇳
Jitendra Singh Kon hai bhai
Inhi ki company he ye
Bhai apko ye tender kitne mai mila
Company ko595 cr
bhai craine aapke company ki hai kya
Nhi....rent
Crane on rent available, 100 ton, tata955 p&h, crawler
Which place
Bhai in garder m tensioning hui h ya nhi
Ye post stressed he
Sabhi bhaiyo ko Ram Ram 🚩🚩🚩🙏🙏
Ram ram bhai
Sir bridge pr waterproofing mastic asfhalt work ho to batayiga I am a contractor
Khud krti he company
@@Raghavsingh143 labour ki jarurat ho to batayiga
Konsi company he aap job karte hoo.
Jsipl
@@Raghavsingh143 hamare dadaji ki company ka name sadbhav infa strakchar he.
Sir main maximum heavy vehicles prr dekhta hu Nagaland registered... Iske peeche koi specific reason hai???
Less registration fees .
Less registration charges from RTO
Tex Kam hota he wha
first comment 🙏🏻 and first viewer
Thanks for your love and support
Sir har construction equipment vehicle Nagaland passing kyon hai
tax kam lgta hai un states me isliye
Sahi kha Bhai ne....Tax kam lagta he
Tax kam hota hai aur process easy hota hai RC banane ka...
Good work ... Love from Bhopal ❤️
Thanks
Jay Javan Jay kisaan majdur driver ekta zindabad 💪💪👍🙏
Raghav bhaiya aapk gurder casting ka or tension ka post tenson pre tenson ye sab samjhao kabhi
Jarur
Raghav bhai apki company ne abhi tak is NH69 ka number kyu nhi change Kiya iska new number NH46 hai NHAI ki website pr b likha hai iske number change ke bare me
Ho jayega Bhai...bahut jalldi
Gujrati waparieyo Key ma Key 🧐🥺🤔😔😰
Kab tak open ho jayega 4 lane, Suktawa new bridge 4lane rahega ?
Ek to abhi chalu ho jayega aur ek...next year
sir girder alag jagah kyu cast kiye jaate hai direct bridge par hi cast kyu nahi karte
Area ka problem hota he site per isliye jha jagah jyada hoti he wha cast krte he
Girders pre-tension hai ya post-tension.
Post
Chanage ki distance kis end se count ki jati h?
Jha se project start ho RHA he wha se....like ye project itarsi se betul he..isliye itarsi ka chainage 61 ch aur betul ka 135
approach ka kaam max contractor khabab aur ghatiya karte hai.. gadi kisi bhi structure ke upar se jati hai to boht jerk feel hota hai. i hope aap logo ne approach slab dhang se kiya hoga aur soil compaction structure ke pass me bhi acche se hua hoga.
Bhai zero zero match Kiya he...
लोड करेंगे ओ भी विडिओ दिखाव रात का विडिओ
A gyi video
Thanks for every update...
We are waiting for next time transformer pass through new bridge
😜👍🙏
@@Raghavsingh143 kis state me kaam chl rha h sr
Mp
Raghav bhai, why are not the final ends of the approach roads to the bridge concretised to align with the bridge level? I have noticed that the joint tends to fracture and cause potholes because of the vibrations.
Sir...in future we will laying BC and mastic work on top of the bridge and aproch slab so.. now that portion is due
Bai modi ka khaana par app na porfile par falying laga diya
Arrre kahna kya chahte ho
15aug a rhi he...isliye ....achha nhi lga RHA Kya apko..??