इतना पैसा लगेगा Electric vehicle Charging Station Open करने में | Public Charging Station Cost

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 ต.ค. 2024

ความคิดเห็น • 698

  • @indianfever
    @indianfever  3 ปีที่แล้ว +9

    Open Your Free Demat Account On Angel and Invest in Share Market:
    tinyurl.com/y35kubte​
    Open Your Demat Account On Zerodha in Rs. 300:
    bit.ly/2WyWCSQ

    • @ermaheshjangalagi1422
      @ermaheshjangalagi1422 3 ปีที่แล้ว

      Hi nice... But which business is best... Low investment of money...

  • @anildeshkar906
    @anildeshkar906 5 ปีที่แล้ว +8

    As EV become popular, govt should make it mandatory to provide charging stations at mall parking and also corporation parking area. By the time shopping is done, the vehicle will be charged.

  • @vishald.7046
    @vishald.7046 4 ปีที่แล้ว +3

    Solar panel lga ke charging de sakte kya...uske uper subsicidy milegi kya?

  • @umeshmajhi
    @umeshmajhi 4 ปีที่แล้ว +15

    Assumption that all machine will be utilized for 20 hrs a day is insane, even if you are setting it up at a posh area.

  • @vijaykumar8271
    @vijaykumar8271 4 ปีที่แล้ว +1

    Karnatak me cost kitna hoga??
    Aur only highways par hi dalna padega kya...?? Kya inside bi daalsakte hai...??ans plz..

  • @vppatil84
    @vppatil84 4 ปีที่แล้ว +3

    Hello
    Can you tell in which location EV cars are getting sold ?
    Also which location would be more beneficial?
    Any government subsidies are applicable?

  • @jaihindjaibharat324
    @jaihindjaibharat324 5 ปีที่แล้ว +49

    20घंटे बिजनेस आवर,,मतलब सुबह 5से रात 1बजे तक,,,,अगले सात आठ साल तो उम्मीद बिलकुल नही है

    • @Sudhirkumar-xv8cy
      @Sudhirkumar-xv8cy 3 ปีที่แล้ว +1

      Admi india me bahut bekar hai mil jayenge 2hour bhi chalega

    • @Sudhirkumar-xv8cy
      @Sudhirkumar-xv8cy 3 ปีที่แล้ว

      Sorru24hour bhi chalega

    • @sohanjeetsodhi8773
      @sohanjeetsodhi8773 3 ปีที่แล้ว

      work on plan now and till 2028 we can work on it

  • @mukesh2400
    @mukesh2400 3 ปีที่แล้ว +1

    Solar system can install? Cafe also can open for waiting ? Small store outlet also can open

  • @amitjain9997
    @amitjain9997 5 ปีที่แล้ว +18

    Are we allowed to open utilities like department store, cafe etc on EC charging station for clients to refresh while car is charging?

    • @indianfever
      @indianfever  5 ปีที่แล้ว +4

      Yes you can... But you need to approval from your development authority

    • @vikrambudhwar4725
      @vikrambudhwar4725 4 ปีที่แล้ว

      Good thoughts Sir

    • @rahulpawar6705
      @rahulpawar6705 4 ปีที่แล้ว

      if you open department store ,cafe then the the per unit charges from discom will change .

  • @STAGEANDPLAYER
    @STAGEANDPLAYER 3 ปีที่แล้ว +7

    KYA YEH PLANT SOLAR PANNEL PAR BASED KARKE NAHIN LAGAYA JA SAKTA HAI ?

    • @testingxperts2600
      @testingxperts2600 3 ปีที่แล้ว

      Why not use 💡 produced by solar panels

    • @dharmeshparmar3597
      @dharmeshparmar3597 3 ปีที่แล้ว

      @@testingxperts2600 but sir....solar panel produce electricity in season wise....i monsoon solar pannel not to produce electricity.....and At night also not to produce electricity

    • @aj5892
      @aj5892 3 ปีที่แล้ว +1

      Agar solar panel dalne jaoge toh bahut paisa lagega aur place bhi bohot bada lagta hai usse aur bohot sare technical issue bhi aate hai isliye log voh option readily accept nahi karte

    • @ishanpandya_
      @ishanpandya_ 3 ปีที่แล้ว +1

      @@aj5892 Solar panels per government subsidies bhi deti hai

    • @JagdeepSingh-vn5nh
      @JagdeepSingh-vn5nh 3 ปีที่แล้ว

      Think twice before investment. Its like lottery. May or may not work

  • @drsrinivasbhaskarchaganti3653
    @drsrinivasbhaskarchaganti3653 3 ปีที่แล้ว +1

    Very important is this topic.
    Please share with your friends.
    Dear friends,
    I think 100% people don't know the practical applications on grid .
    Please understand what is the every day grid transmission , what is the actual traffic on the grid on peak hours and off peak hours .
    How much electricity is required for water pumping applications , how much electricity is required for commercial purposes and industrial applications.
    Like this if we consider each sector and it's peak and off peak hours total requirements.
    What is the total power generation and distribution one should understand.
    In India the per hour power generation is 317000 MW and in India there are minimum 100000 petrol pump outlets on pan India basis or in 28 states and 8 union territories and in India there are 230000000 vehicles running on roads and registered in RTO'S of India.
    If we consider each one individual petrol pump or outlet with a minimum storage capacity of 20000 litres of diesel or petrol then each one litre will have only 3 kWh or units of energy stored.
    So each petrol pump has 60000 kWh or units stored energy or 60 MW stored energy.
    Total petrol pumps outlets are 100000 and each petrol pump has 60 MW stored energy then it will be 6000000 MW of energy supplied to these 23000000 vehicles running every day on the Indian roads so where is the energy or electricity to supply for these many vehicles.
    If each vehicle battery is charged with in 35 seconds then where is the electricity generation.
    How can grid function on this sudden imbalance and over balancing of the sudden requirements from various sectors.
    Please understand this generation and distribution or transmission and where are the extra lines to take the extra load .
    Like this there are many unanswered questions.
    Thanks
    Dr Srinivas Bhasker chaganti
    Scientist
    91-8555045244

  • @SurinderSingh-io4uh
    @SurinderSingh-io4uh 5 ปีที่แล้ว +165

    How much bribery we have to pay to the corrupt officers

    • @indianfever
      @indianfever  5 ปีที่แล้ว +58

      That will depend on corrupt officers..

    • @Luckylucy100
      @Luckylucy100 5 ปีที่แล้ว +29

      As per location .. 😂😂

    • @ExplorerBhai
      @ExplorerBhai 5 ปีที่แล้ว +20

      Genuine question

    • @PrashantKumar-yz7pk
      @PrashantKumar-yz7pk 5 ปีที่แล้ว +6

      At least 20 laks.

    • @amarvedwal3821
      @amarvedwal3821 5 ปีที่แล้ว +19

      उस रिश्वतखोर भ्रष्टाचारी को फ़ास्ट चार्ज़िंग से करंट लगा कर चार्ज कर दो....हरामी को....? भ्रष्टाचारी को तो प्लान से सबक सिखाओ.....करंट लगाना, उस सुअर को....👍

  • @indianfever
    @indianfever  5 ปีที่แล้ว +28

    Aapko Minimum Estimate cost itna aa jaayega.. agar aap public charging station daltey hai toh... agar apka koi suggestion yaa question ho to comment karey baki video ko LIke and Share karna naa bhuley.. Thank you...

    • @piyushkumardwivedi1304
      @piyushkumardwivedi1304 5 ปีที่แล้ว +5

      Electricity bill you didn't calculate

    • @ashishdas7447
      @ashishdas7447 5 ปีที่แล้ว +6

      😂 24 gante kya station k taar ghuse rahe ge gadi me. Raat Ko to hoge he nahi log ghr pr charge kre ge. Din me bhi adha time charge lage rahe ge tub bhi 4 lac he hua saal ka😂😂 LoL.

    • @jattdhillon1990
      @jattdhillon1990 5 ปีที่แล้ว +1

      Electricity bill kaha se bharye ga? Half information.

    • @alongwithnature9358
      @alongwithnature9358 5 ปีที่แล้ว +1

      @@jattdhillon1990Electric Bill is being very high.

    • @akash20196
      @akash20196 5 ปีที่แล้ว +8

      Kya gawar logo ki tarah electricity bill calculate nahi kiya bol rhe ho....wo video me bol to rha hey ki per unit margin ....matlab unit ka rate pay karne ke bad ka munafa.....
      Kind note... Ye que karne wale please ye idea ke bare me na socho....aapka mind piwer low hey😂

  • @Raghav.ydv2k4
    @Raghav.ydv2k4 3 ปีที่แล้ว

    Sir apna hi ek solar system buld up karawa ke extra charging port two laga slow wale me to fir utna amount mere pass sidha aa jaega ??🙏 Please tell

  • @prabeenpadiyal330
    @prabeenpadiyal330 5 ปีที่แล้ว +7

    1इस में लागत पर बैंक लोन का ब्याज नहीं लगाया है।
    1बिजली प्रति युनिट कीमत?
    इस को लगने बाला समय मैंशन नहीं किया है।
    किसी भी स्टेशन लगाने बाले को यह चीज़ें जानना बहुत जरूरी है।
    जानकारी के लिए यह वीडियो बहुत बढ़िया है,अगर थोड़ा अधिक मेहनत की होती तो सोने पर सुहागा होता।पूरी बिस्तृत जानकारी के साथ वीडियो कि इंतजार रहेगा।

  • @JigneshAmbasana
    @JigneshAmbasana 3 ปีที่แล้ว

    Solar pannels system ka calculate kar ke de sakte he ?

  • @anilkumarsharma1205
    @anilkumarsharma1205 4 ปีที่แล้ว

    kya aajkal jaisey phone bina contact key charge ho jatey hain vaisey hee battery bhee charges ho jayegee
    agar design hee changing ho jayegee to koi bhee gari ka battery torch ki taraha badal detey hain to yeh sab station bananey ki jarorat nahi rahegii

  • @shubhanshusharma758
    @shubhanshusharma758 5 ปีที่แล้ว

    What type of batteries are used in such vehicles?How much time does it take to get charged? The scooter which i am using takes 8 hours of charging and it contains lead battery.And can scooters having lead batteries can get charged by this or not and fast charging is possible for such scooters?

  • @anubhavm2822
    @anubhavm2822 5 ปีที่แล้ว +7

    Very informative video. Such business costing and business plan videos are information giving to any start-up or an MSME. if this information is available on TH-cam it is be very helpful.

  • @aryamaan_chaudhary
    @aryamaan_chaudhary 3 ปีที่แล้ว

    IPLT Rhino Truck ke liye 250kw charger lagegA aap batao ki kya process hai..?? Kaise connection liya jaye Uttar Pradesh me

  • @rakeshse11
    @rakeshse11 5 ปีที่แล้ว +10

    Nice information bro, while applying actually we need to account by lots of things. But initial information is good.

  • @dimondheartmotivation9083
    @dimondheartmotivation9083 3 ปีที่แล้ว

    Sir solar based charging stations hai kya..

  • @alokniranjan627
    @alokniranjan627 3 ปีที่แล้ว

    For this establishment how much big solor plant required. Please give information.

  • @akshaysantoshpatil
    @akshaysantoshpatil 5 ปีที่แล้ว

    Saare 5 type ke charging unit lena compulsory hai kya. 5 mese.koi ek ya 2 nhi le sakte kya?

  • @rawindersingh3670
    @rawindersingh3670 3 ปีที่แล้ว

    sir mera ye khna h ki alag alag states me alag alag bijli charges hain .
    uss hissab se alag alag type ke vihicle se kitne paise charge krne chaiye aur kitni roj hum charging karnge ki jisse hume uchieet munafa ho.,

  • @yashvaiti3342
    @yashvaiti3342 3 ปีที่แล้ว

    Hi Ravi nyc content. Well my question is wch is a good training course for EV stations installation including govt. policies n permission included in that course ?

  • @imranbasha2846
    @imranbasha2846 4 ปีที่แล้ว +1

    Vehicle charge honey main kitna time lagega,,,

  • @shriramkshirsagar2578
    @shriramkshirsagar2578 3 ปีที่แล้ว

    Solar power if possible can we use fir recharge. Pl reply.

  • @atulmits
    @atulmits 3 ปีที่แล้ว +2

    क्या total 20 hours कोई charge करेगा? या इतने customers मिलेंगे?

  • @sachinguptaofficial1802
    @sachinguptaofficial1802 5 ปีที่แล้ว +4

    Sir my question is this power station come under government, so wil governmentl help us to establish this power station, help like financial support bcoz It is pilot project for government so government also try to expand this power station as soon as possible
    Give Answer please

    • @dineshshah5597
      @dineshshah5597 3 ปีที่แล้ว

      In Ahmedabad Gujarat where to get the form for all the informations please send their address also so and information also thank you

  • @narinderpalheer555
    @narinderpalheer555 3 ปีที่แล้ว

    Can u tell us about the company to whome we should contact for dealership.

  • @kumarsushil25
    @kumarsushil25 4 ปีที่แล้ว +1

    What is land requirment in 4 lane road? Land front 60 or 70 feet is sufficient or not?

  • @AbhijitMagar
    @AbhijitMagar 5 ปีที่แล้ว

    Bich raste me petrol disel khatam hoga to petrol pump me security charges pay karke petrol disel le sakte hai can ya bottle me charging point kaise leke jayenge.

  • @vaishalisrecipe5966
    @vaishalisrecipe5966 2 ปีที่แล้ว

    So brilliant sir 👍 thank for u r information with selected point 👍🙏

  • @chiragjain8981
    @chiragjain8981 5 ปีที่แล้ว +3

    Ye btaie ki,2+ 3 wheeler ke lie,kitni fast and slow charging machines lgegi

  • @shashitm1084
    @shashitm1084 4 ปีที่แล้ว +5

    I don't think that there is much scope for public charging infrastructure without committed contracts with specific user's demand. Because, if this transition happens, the most convenient practices will be adopted. Like, if there's an office of say 1000 people using cars, maximum of 100 may buy EVs even after the EVs come more into trend. Those 100 will be required to charge only during their stay in the office. Now, the developer who runs the facility will obviously go for an ABT option and buy electricity at lower prices from open access. Even if each of the cars is charged with one hour, the batteries will be full. And the whole activity will be scheduled in the afternoon time to make sure Solar power is consumed. As the state governments have already fixed maximum prices of ₹5/kWh, the developer will try his level best to accommodate his costs only by subscription and as per kWh cost per month. He will buy Electricity with a sufficient margin in open access. So people will rarely use commercial EV charging infrastructure. Even if the charging infrastructure is developed in highways for long commuters, they will be mandated to be built around refreshment centres and hotels. Where usually the business received by the vehicle owners in refreshment is far more than the charging electricity. In such cases, owners will usually not charge for EV charging and try to attract crowd.
    So there's no scope of developing charging stations dedicated to charging. Only fast charging has to be done in this way and these fast charging points can't be used quite frequently on EVs. They're an emergency measure only. This heats the batteries and derates them faster. So most people will try to slow charge at home.

  • @chitwanagarwal3580
    @chitwanagarwal3580 4 ปีที่แล้ว

    Hey suppose if I dont take electricity from government and install a solar plant and battery pack(to use extra solar energy at night) and run my station 24*7 what will be cost the of the whole project and calculation...

  • @sureshkumari7444
    @sureshkumari7444 3 ปีที่แล้ว

    chote charging point ke liye kitni land requirement hai?

  • @anujchandra9169
    @anujchandra9169 3 ปีที่แล้ว +1

    minimum investment required is rs.5,000,000. Its there in official website of MINISTRY of POWER.

  • @kapilgoel183
    @kapilgoel183 2 ปีที่แล้ว

    Any smaller charging station for three wheeler

  • @vandanjethava9467
    @vandanjethava9467 3 ปีที่แล้ว

    Ye plant ke upr solar lga de to chlega?

  • @Kristopherkarthik
    @Kristopherkarthik 3 ปีที่แล้ว

    All two wheelers won't support for fast charging then what is the need to put fast charger as mandatory in PCS.
    Do we have rule to put only slow charging station at any govt offices like that?

  • @AyushSingh-py6un
    @AyushSingh-py6un 3 ปีที่แล้ว

    Sir can we use solar panel

  • @rahulpatidar9905
    @rahulpatidar9905 4 ปีที่แล้ว +1

    bhai mere, aapne vo transformer and software ki fixed cost ko to include hi nhi kiya...bss bta diya ki 8lacs and 50k lgega ?

  • @saurabhjadhav6282
    @saurabhjadhav6282 4 ปีที่แล้ว +1

    Sir please suggest in which scale of business does this business falls?? Small scale or large scale?? And what are the minimum documents required to get all permissions from state or central government.

  • @surendraswami5364
    @surendraswami5364 9 วันที่ผ่านมา

    ek two vehicl charging me kitna smya legta sir ji

  • @akhilrajput7782
    @akhilrajput7782 3 ปีที่แล้ว

    Can we apply solar panel to supply electricity to charging port?

  • @yesha1680
    @yesha1680 4 ปีที่แล้ว

    Kya hum apne electric station pr soler penal lga skte h

  • @riturajkakoty567
    @riturajkakoty567 5 ปีที่แล้ว +1

    In our country Electricity is major problems, where out of 24 hours only 4-6 hours we get electricity, first improve electric shortage problems, it is very important to save our environment through electric vehicle, But, when all vehicles are electric from where the power we get.

    • @saurabhthakur5939
      @saurabhthakur5939 5 ปีที่แล้ว

      Rituraj Kakoty kaha rahta h Bhai Jo 4 ghante hi light aati h

  • @Brijinderpalsurapuri
    @Brijinderpalsurapuri 5 ปีที่แล้ว +47

    This earning is if all ports are booked for 20 hrs per day..

    • @RD-ij2sz
      @RD-ij2sz 3 ปีที่แล้ว +6

      Right . Achieving All ports 20 hours booking is very difficult atleast for the next 3/4 years since the population of electric vehicles will be low . Also people will try to maximise charging at home ...

    • @piyushkonher8405
      @piyushkonher8405 3 ปีที่แล้ว

      I believe those who are living in apartments and societies may need to get this charged outside, as socities cant provide different connection for individuals to charge

  • @parthsabhaya6046
    @parthsabhaya6046 3 ปีที่แล้ว

    What about government guidelines and permissions ... Is there any government web page for the guidelines study

  • @siddubannimath5040
    @siddubannimath5040 5 ปีที่แล้ว +22

    Until 2025 ,we will not get clear idea about ev charging,
    And if evs are running fine ,then most of the petrol pump will run the charging station along with fuels,
    So only charging station is a bad idea,
    If you have petrol pump ,then add the charging station at border of pump,it might benefit from in upcoming years

    • @royroshan821
      @royroshan821 5 ปีที่แล้ว +2

      Bro ev charging station k space ki jarurat padti h jaha atleast 1 car 20-25 min rukar charge kar sake so petrol pump don't have that much space ....So it will need separate station in future

    • @siddubannimath5040
      @siddubannimath5040 5 ปีที่แล้ว

      @@royroshan821 depend upon ev traffic at charging station , expansion will eventually happen

    • @theashishbharti1988
      @theashishbharti1988 5 ปีที่แล้ว

      Existing petrol pump pe charging station nahi aaega bcoz petrol pump pe space hi nahi hota itna....
      Haan highway pe kuch petrol pumps ke pas acchi space rehti h, they can use that space
      But city me to naya hi kholna padega

    • @siddubannimath5040
      @siddubannimath5040 5 ปีที่แล้ว +2

      @@theashishbharti1988 the number of EVs on road are very negligible ,most of the ev owners charge at there houses,
      Most of the EVs today are only for city purpose or daily 80 KM's ride,
      Adding EVs charging only feasible on highways and not in cities small petrol pump,
      It's even risky business to add charging station at present ,as govt is not having a proper planned vision on ev s and charging station ,
      Owners of petrol pump can add one or two charging stands at there pump,has at present there are very less on roads,

    • @vlnveer
      @vlnveer 5 ปีที่แล้ว +2

      have you heard "chicken or the egg" question,
      "EVs and the charging station" is the same question.
      Most of people waiting for EVs and
      Most of waiting for charging station.
      EVs need proper AWARENESS.

  • @ajaymane2841
    @ajaymane2841 3 ปีที่แล้ว

    muze charging station Maharashtra mai Thane district mai Badlapur ke liye apply karna hai to kaha apply kare

  • @grizzlygames6939
    @grizzlygames6939 2 ปีที่แล้ว

    How we can calculate the electricity consumption and its charges in operational cost

  • @nitinmittal213
    @nitinmittal213 3 ปีที่แล้ว +5

    Getting a connection, setting up transformer and high voltage cables, panels, etc. is very expensive!

  • @yashsanghvi1753
    @yashsanghvi1753 5 ปีที่แล้ว +4

    Can you make a descriptive video on setting up a manufacturing unit of bio degradable plastic

  • @karan357
    @karan357 3 ปีที่แล้ว

    20hrs charging karne log aayenge uski koi guarantee nai... par agar utna karna hai to 24hrs station open rakhna padenga... to maintenance b double hi jayenga... jaise technician cost wagera wagera...

  • @surenderkumar-ln8kx
    @surenderkumar-ln8kx 5 ปีที่แล้ว

    How many areas must for changing stations

  • @vandanjethava9467
    @vandanjethava9467 3 ปีที่แล้ว

    Ye sub lene ke liye process kya he gov. Ki koi ?

  • @Ahadansari-h1o
    @Ahadansari-h1o 4 ปีที่แล้ว

    Can we use solar panels

  • @surjitsingh3393
    @surjitsingh3393 5 ปีที่แล้ว

    1 car full charge hone me kitna time legi and ek car ko charge krne me kita kharcha ayega and profit kya hoga

  • @babababaji2239
    @babababaji2239 3 ปีที่แล้ว

    2940 kw ka electricity ka bill kitna dena hoga discom ko ye bhi bata dijiye

  • @mkverma7258
    @mkverma7258 3 ปีที่แล้ว

    You have not considered Interest on capital and depriciation cost on machines. For 20 hrs utilization in a day manpower requirement will also go up. Thus actual profit will be lower than what you have shown.
    Is there any subsidy available ?

  • @maheshkhatanamk2959
    @maheshkhatanamk2959 5 ปีที่แล้ว

    Charging stations kholne ki processing kya hogi

  • @rahulbahuguna123
    @rahulbahuguna123 5 ปีที่แล้ว

    Accha estimation hai. but KWh ki jagah KW aur KW ki jagah KWh units galat likhe hain. Isme 20 hr me day night cost fluctuation factor nahi added hai, Aur agar solar panel lagata hai to uski calculation alag hogi. ROI me standby transformer calculate nahi kiya hai.

  • @mukesharora8223
    @mukesharora8223 3 ปีที่แล้ว +2

    Expenses calculation is wrong 50000*12 + 20000*12 due to working hours (20 hours) Salary expenses minimum 50000*12* 2shifts + 20000*12*2shifts

  • @supermathematicsbyyogeshsi8092
    @supermathematicsbyyogeshsi8092 4 ปีที่แล้ว +1

    Sir NOC kaise milegi please about

  • @JayantaKumar94Bn
    @JayantaKumar94Bn 4 ปีที่แล้ว

    Kya petrol pump may suru kar sakata hu. thanks

  • @aakashsharma7509
    @aakashsharma7509 4 ปีที่แล้ว

    Sir Hyundai ka authorized service center kholne k liye kya karna hoga?

  • @rajsinghgill4030
    @rajsinghgill4030 5 ปีที่แล้ว +1

    सर गाड़ी चार्ज करने के लिए कितना टाईम लगेगा । और गाड़ियों के लिए कितनी जगह होनी चाहिये

    • @indianfever
      @indianfever  5 ปีที่แล้ว

      Sir gaadi charge karney mai fast charging mai 1-2 ghntey mai

    • @indianfever
      @indianfever  5 ปีที่แล้ว

      Space ki koi bhi requirment nahi bas otna space rakhiye ki jitney bhi aap charging port lagwa rahey waha sey gaddiya nikal jayeye...

  • @vinodbele769
    @vinodbele769 4 ปีที่แล้ว +2

    १ चाजिंग मशिन लगा नही सकते क्या ?डिमांड आने पर मशिन युनिट बढायेंगे.

  • @apudas9184
    @apudas9184 5 ปีที่แล้ว

    Kesa start kara ya businesses...ya businesses ka liya koi lon mil sakta he kya...?

  • @krishnamohanranga9507
    @krishnamohanranga9507 3 ปีที่แล้ว

    क्या सोलर एनर्जी से भी कर सकते हैं

  • @akkikumar5309
    @akkikumar5309 4 ปีที่แล้ว

    Actual kharcha issue Kahi jyada commercial location Ka Hoga kyonki residential location me rehwasi objection lenge (parking ki bhi problem hogi). Aur commercial location par koi bhi business Kiya ja Sakta hai like restaurant, medical etc. Toh ye koi kyon kare kyonki crores of rupees ki toh jamin hi Hoti hai(commercial) aur Uske baad customer Apne Ghar parhi charge karega(except emergency). Mere pass electric vehicle hai aur in last one year meko sirf one-two time hi MERI gadi road par descharge hui hai. Aur phir jaha discharge ho jaruri Nahi ki charging station bhi wahi ho jab Dhaka hi lagana hai toh me gadi ko apni Ghar ki Tarah lekar jaunga na ki charging station ki taraf

  • @shobhitmittal3854
    @shobhitmittal3854 5 ปีที่แล้ว +2

    I changing a two wheeler in hybrid mode. It will work on electric as well as petrol and 20 paise per km cost will effective to a customer...

  • @siddharthpaschapur
    @siddharthpaschapur 3 ปีที่แล้ว

    Thank you for informative video

  • @mayurgolhar796
    @mayurgolhar796 2 ปีที่แล้ว

    Kya Nagpur me chalega ye bussiness?

  • @sagarw4197
    @sagarw4197 4 ปีที่แล้ว +1

    Sir, When you calculated using 20 Hrs how many chargers you have considered.. whether it is 20 Hrs in total or 20 Hrs each charger

    • @niranjan17ful
      @niranjan17ful 3 ปีที่แล้ว

      plz see the video again.. you will get to know..

  • @ranjeetmadde9398
    @ranjeetmadde9398 5 ปีที่แล้ว +5

    25lacs me electric car lo upar se Maintenance charging ke paise alag isse acha hai 15lacs tak to achi suv aa jayegi.

  • @praveen8
    @praveen8 5 ปีที่แล้ว +8

    Great video to understand the context of charging station investments & returns. Thanks alot.

  • @1795satyaveer
    @1795satyaveer 5 ปีที่แล้ว +2

    Sir ji abhi electric car ya bike bahut kam hai.....aise m to lgane k baad bhi chalana mushkil hoga.

  • @aman_chandravanshi
    @aman_chandravanshi 5 ปีที่แล้ว +14

    I think after including hidden charges. The cost will reach nearly 50 Lakhs. And profit margin of 12 lakhs/yr.

    • @mansooraga318
      @mansooraga318 5 ปีที่แล้ว +1

      Ur right dear

    • @vivekvadoliya9647
      @vivekvadoliya9647 5 ปีที่แล้ว +3

      For me the gross costing was 39 lc in 2018. And marginal income for the last financial year was 10 lc. If you have bullish pocket money then Solar installation would be benficial for indirect electicity consumption. You can sell EV batteries from that place. Software installation is a optional expense.

    • @aniruddhashahapurkar9244
      @aniruddhashahapurkar9244 5 ปีที่แล้ว

      @@vivekvadoliya9647 where is your plant located?

    • @nishantpatil6691
      @nishantpatil6691 5 ปีที่แล้ว

      @@vivekvadoliya9647 where's plan... please try to share all.your experience how u done

    • @vivekvadoliya9647
      @vivekvadoliya9647 5 ปีที่แล้ว

      @@aniruddhashahapurkar9244 Jamnagar, Gujarat. But unfortunately is not viable income generater for me.

  • @vishvajeet7064
    @vishvajeet7064 4 ปีที่แล้ว +2

    I've 5 rupees in my pocket... What should I do?

  • @ramchandersingh8665
    @ramchandersingh8665 3 ปีที่แล้ว

    Govt. Permission /licence is compulsory or not

  • @anilkumarsharma1205
    @anilkumarsharma1205 4 ปีที่แล้ว

    yeh battery ko recharge karna kya hota hain, kya battery ka purana pani nikal dein aur naya pani daal dein to kya vo recharge ho jayegee
    ya pahley sey recharge pani ko khali battery main daal dein to bhee kya vo nayee ho jayegee
    ya ek potable battery ko lo yani purani battery ko nikalo aur nayee dalo, dunia ki sabhi battery companies cell ki taraha ek hee design ki battery banao aur cell ki taraha battery badalo
    simple tarika hain

  • @manojjhariya9419
    @manojjhariya9419 4 ปีที่แล้ว

    Solar panel se charge Mar shakte hair kya?

  • @surendraswami5364
    @surendraswami5364 9 วันที่ผ่านมา

    four vehicle me kitna smya legta sir ji bta

  • @vaibhavgurav107
    @vaibhavgurav107 3 ปีที่แล้ว

    Sir gov ki koi help ya subsidy hai kya

  • @shaileshgatorbhai6067
    @shaileshgatorbhai6067 3 ปีที่แล้ว

    Kaya charging stations me koi government sabsidi milati he

  • @aravindbachu5502
    @aravindbachu5502 4 ปีที่แล้ว

    What are list of permits and licenses we need to get?

  • @mohitmor8056
    @mohitmor8056 5 ปีที่แล้ว

    dear sir .please clarify my query in detail.you told us that total sale per day =2940 units @2.5 =7350 per day income.but how much we have to pay to bijli deptt.for 2940 units

  • @evergreendigital932
    @evergreendigital932 3 ปีที่แล้ว

    Very Good Informaction

  • @sudheersharma9315
    @sudheersharma9315 3 ปีที่แล้ว +1

    The real problem is that can we generate 2940 per day now a days...

  • @bullseye1441
    @bullseye1441 3 ปีที่แล้ว +1

    Uprse log rukege toh waha shop bhi de sakte hai rent pe .
    Usse monthly lakho milege

  • @dipaklodh3995
    @dipaklodh3995 3 ปีที่แล้ว

    सिर्फ थ्री ब्हिलार का चार्जिंग ष्टेशान केलिए कितना खर्च आयेगा?

  • @nareshisrani1667
    @nareshisrani1667 5 ปีที่แล้ว +1

    Agar solar power charging station lagana hai to coast kitna hoga

  • @abhishekdubey9859
    @abhishekdubey9859 5 ปีที่แล้ว

    Sir isko open krne ke liye gov. Se loan mil sakta hai kya

  • @mohammedinam9667
    @mohammedinam9667 5 ปีที่แล้ว +3

    If we consider 100kw capacity car what would be its charging time to make full oncharge?

    • @aman_chandravanshi
      @aman_chandravanshi 5 ปีที่แล้ว +1

      Bro, 100Kwh is the battery size of 2 cars. Cars have nearly 50-70kwh batteries. And it takes 7hrs in slow charger for 50kwh. And 1-1.5 hrs in DC faat charging

    • @arneroland5197
      @arneroland5197 5 ปีที่แล้ว

      Aman Chandravanshi we have a Nisan Leaf 30kw here in Norway, and it takes up to 15 hours to slow charge it at home if the battery is empty 🙏🏻😅 A fast charger , the 50kw will full charge the battery in 30-40 minutes .

    • @aman_chandravanshi
      @aman_chandravanshi 5 ปีที่แล้ว +1

      @@arneroland5197 Good for you, but there are actually 4 types of charger AC-AC slow AC-AC fast, DC fast, DC slow
      All of them has different speeds. And i was considering whatever is popular here. Anyway how can you understand hindi, as you are watching this video?
      😅

    • @arneroland5197
      @arneroland5197 5 ปีที่แล้ว +4

      Aman Chandravanshi 👍🏻🙏🏻😅 I always liked India and I have been there 🇮🇳, but I don’t really understand much Hindi . I was just curious so I watched the video anyway. I know only a few words . Jai Hind 👍🏻🙏🏻😅 🇮🇳

    • @aman_chandravanshi
      @aman_chandravanshi 5 ปีที่แล้ว +2

      @@arneroland5197 ohkay good to know😁

  • @feelings7746
    @feelings7746 5 ปีที่แล้ว +1

    Sir is me koi gst vagera lagega ya nahi lagega

  • @imgyan11
    @imgyan11 3 ปีที่แล้ว

    Bhai minimum land Requirement kitni honi chiye?
    Plzz reply as soon as possible.