SMRT KHI C151 and ALS R151 trains Back-to-Back at NS16 Ang Mo Kio

แชร์
ฝัง
  • เผยแพร่เมื่อ 30 มิ.ย. 2024
  • Filmed 1/7/24
    Line: North-South Line
    Direction: NB towards (4) NS1 EW24 Jurong East via NS9 TE2 Woodlands
    SMRT KHI C151 - 105/106:
    TRN: 244 PM LN (Weekday Schedule)
    Depot of Origin: Bishan Depot
    Final Destination Depot: Ulu Pandan Depot
    Rolling Stock: Kawasaki Heavy Industries C151
    Motor: GTO Chopper (Mitsubishi Electric)
    SMRT ALS R151 - 815/816:
    TRN: 255 PM LN (Weekday Schedule)
    Depot of Origin: Bishan Depot
    Final Destination Depot: Bishan Depot
    Rolling Stock: Alstom Movia R151
    Motor: Alstom MITrac (SIC-VVVF)
    One lucky day I get an R151 following behind a C151 especially on NSL where both types of trains have only a handful of them on the NSL.
  • เกม

ความคิดเห็น • 7

  • @trainasseen7838
    @trainasseen7838 7 วันที่ผ่านมา +1

    short interval😮

  • @WLTransit100
    @WLTransit100 24 วันที่ผ่านมา +1

    Old meets new

    • @GTOChoppa
      @GTOChoppa  24 วันที่ผ่านมา

      Indeed

  • @ultrad9646
    @ultrad9646 19 วันที่ผ่านมา +1

    I’m the guy with the dark blue shirt with the mask hanging from his neck in the video 1:21

    • @ultrad9646
      @ultrad9646 19 วันที่ผ่านมา +2

      I’m just very surprised how I am in this video

    • @GTOChoppa
      @GTOChoppa  19 วันที่ผ่านมา

      @@ultrad9646 hey there

    • @ultrad9646
      @ultrad9646 18 วันที่ผ่านมา

      ⁠I also went into 815/816 too with my friend