It is disheartening to note that the announcement of arrival is incomplete as the announcer only says Bangalore nayyi Delhi exp hesitate to mention the name of karnataka exp train number and complete originating station that is KSR Bangalire while on the other hand about Mumbai chatrapathi shivaji Maja Raj terminal with train number . This kind of partiality and injustice is not called for.
It's with every state bro..In Bangalore and SWR, Kranteevera Sangoli Rayyana with Bengaluru is fully used while the journey originates from KSR..but now due to COVID days the train name and number is different. So the objection of train name you can discount.
Well captured. That means very soon end to end journey will thru Electric Loco. Diesel loco will be dream one day like Steam locos. Once upon a time that both ruled the IR. Something is good.
@@shubhamsakhare5857 I started traveling in this sections from 2010...at that time it was electrified till renigunta...then gundakal,wadi etc...now to electrify whole section of 941 KMS it took a decade to finish it off... incredible works from CORE and indian railways
@@shubhamsakhare5857 Come to Rajasthan nwr the routes are electrified But still trains run by diesel locomotive 😁😁 .You can see new livery of emd locomotive
दक्षिणेकडून येणार्या सर्व गाड्यांना आता सोलापूरपर्यंत नियमितपणे e loco लागणार असे दिसते,great news,diesel loco era is over ,मी त्या मार्गावर steam to diesel असा बदल देखील पाहिला आहे
@@shubhamsakhare5857 That's really lethargic from Solapur division, given that it is expected that sooner or later these lines will go under the wire !!
@@karankumbhar7749 Solapur Division was not prepared for demerger of Daund from SUR division & merger with Pune Division. Crew/staff/Loco management has become difficult now.
Since the route has become electrification now almost, whether the complete route between Gulbarga and Daund is a double track or some part is a single only?
Hi Shubham, Heard that 12163/4 LTT-Chennai express, Udyan express and 16351/2 express are also in contention for getting E-Loco soon Can you check on this ?
It is disheartening to note that the announcement of arrival is incomplete as the announcer only says Bangalore nayyi Delhi exp hesitate to mention the name of karnataka exp train number and complete originating station that is KSR Bangalire while on the other hand about Mumbai chatrapathi shivaji Maja Raj terminal with train number . This kind of partiality and injustice is not called for.
It's with every state bro..In Bangalore and SWR, Kranteevera Sangoli Rayyana with Bengaluru is fully used while the journey originates from KSR..but now due to COVID days the train name and number is different. So the objection of train name you can discount.
Once the Solapur Mohol electrification is complete, Bengaluru Delhi as well as Bengaluru Mumbai trains will run full electric.
Well captured. That means very soon end to end journey will thru Electric Loco. Diesel loco will be dream one day like Steam locos. Once upon a time that both ruled the IR. Something is good.
How fast the time passed from Diesel to piggyback to e-loco , with in a bink of eye we have e-locos now
A very sad thing it is for Diesel Locomotive lovers.
@@shubhamsakhare5857 I started traveling in this sections from 2010...at that time it was electrified till renigunta...then gundakal,wadi etc...now to electrify whole section of 941 KMS it took a decade to finish it off... incredible works from CORE and indian railways
@@shubhamsakhare5857 Come to Rajasthan nwr the routes are electrified But still trains run by diesel locomotive 😁😁 .You can see new livery of emd locomotive
@@chirayusharma5595 It has both diesel and electric specially hr panto.
Very glad to see this vedio.
Thanks for the information 🙏
Thanks for watching 🙌
Lovely catch bro 😍loco was ❤ bt will miss diesel day's 😢😢
Thanks for watching ❤️ End of beautiful diesel era
Can you pls make a video of karnataka exp going towards wadi and having a loco change at solapur
Nothing will be visible in the night.
😥😭😭😭😭😭 RIP ALCO CHUGGING. THOSE DAYS ARE GONE FOREVER
A wonderful Era comes to an end
if only the railways will complete the daund solapur section electrification.... why the delay???
Look at those Electrics invading diesel heavens 😍
Very sad to see this kind of invasion.
New year eve New catch of Udyan Exp. wish you happy english new year 2022
Happy New Year
दक्षिणेकडून येणार्या सर्व गाड्यांना आता सोलापूरपर्यंत नियमितपणे e loco लागणार असे दिसते,great news,diesel loco era is over ,मी त्या मार्गावर steam to diesel असा बदल देखील पाहिला आहे
Great🙌 Thanks for watching 🙌
End And Beginning Of NEW ERA 🙌
Yes!
How many trains are handling E locos at SUR?
Karnataka Exp, Udyan Exp & Chennai LTT Exp.
@@shubhamsakhare5857 and likely with 16351/52 too
Konark will follow soon
What about hasan express??
It will get later.
Then what about basava express and hassan express?
There is no staff/crew available at Solapur to handle Electric Locos yet. They will continue to run with Diesel Locomotives.
@@shubhamsakhare5857 That's really lethargic from Solapur division, given that it is expected that sooner or later these lines will go under the wire !!
@@karankumbhar7749 Solapur Division was not prepared for demerger of Daund from SUR division & merger with Pune Division. Crew/staff/Loco management has become difficult now.
Since the route has become electrification now almost, whether the complete route between Gulbarga and Daund is a double track or some part is a single only?
Jeur - Washimbe section is single line in the entire Daund - Gulbarga section.
Really Great news and great video
Thanks for watching 🙌
I'm very happy because electric loco came kk express
Thanks for watching 🙌
Thanks for the nice update sir
Thanks for watching sir 🙌
Which shed loco belongs to? Is it TKD or GZB.👌👌👌👍
ERODE LOCO SHED
Instead of Wadi it has diesel loco between Solapur and Kurduwadi..
Diesel loco between Solapur - Daund.....not Kurduwadi due to crew unavailability
@@shubhamsakhare5857 EMD ki kya galti thi saare maje to Alco le gaya apne time pe.. just a thought..
How about himsafar and kevadiya
Not yet due to crew/loco poor management
Any work happening on Solapur - Mohol Electrification?
Yes. Foundation building work started.
@@shubhamsakhare5857 What is the completion date set for Solapur - Mohol Electrification ?
Will electric loco really be able to pass under that bridge? I don't see any space for panto to be raised.
Also, any idea by when Udyan will have traction change at SUR?
Yes Electric loco can pass under the Bridge, a successful trial was carried out during CRS inspection & bridge is commissioned for operation.
Hi Shubham,
Heard that 12163/4 LTT-Chennai express, Udyan express and 16351/2 express are also in contention for getting E-Loco soon
Can you check on this ?
Udyan already completed its successful trail
You can check my video today at 4:00 PM.
From where u got this information???
Which information?
Excellent
Nice catch
Thanks for watching 🙌
Kadak.........kadak...
.
Thanks for watching 🙌
Great news bro
Thanks for watching 🙌
@@shubhamsakhare5857 still how many express starts with elocos upto solapur
Modi hai to mumkin hai
👍🏼👍🏼👍🏼
Super 💝
ED ❤️🚂
Thanks for watching 🙌
Awesome
Thanks for watching 🙌
Traction change to Solapur
Yes
Diesel missing 😭😭😭
Missing very much
Tamil loco driving a kannadiga train.
Yes! Thanks for watching 🙌
Beautiful❤
Thanks for watching 🙌
Diesel engine 😭😭😭😭
Sad news