hi ps tell methis.... as soon as i have started the base and rover is it necessary to make off the rover until i survey the next point? or i have to move to the next point as the rover is on? shortly when moving between consecutive points to be measured shall i keep the rover on or off? MANY THANKS
Great information
What is the difference between FastStatic and PP Kimenatic? And when is is recommended to use one or another?
hi ps tell methis.... as soon as i have started the base and rover is it necessary to make off the rover until i survey the next point? or i have to move to the next point as the rover is on? shortly when moving between consecutive points to be measured shall i keep the rover on or off?
MANY THANKS
This is great Thank you very much.
How do you xtract a file from an R10 to the computer?
a lot of thanks
I need the simulator if possible
Sir Trimble tsc 3 data export in pan drive
POR FAVOR PUEDE ENVIAR EN ESPAÑOL?
woah never seen a negative utm coord.