Road Drain Raft/PCC/BBS/Shuttering/Curing in Full Detail at Site || By CivilGuruji

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 ส.ค. 2024
  • #civilguruji #civilengineers #Road #Drainage #Construction
    Road Drain Raft/PCC/BBS/Shuttering/Curing in Full Detail at Site
    Practical Training course & Fee Detail:- www.civilguruj...
    Use Coupon Code:- GURUJI
    CALL NOW:- 9111001234
    ABOUT THIS VIDEO :-
    In this video Er. Fazal, Corporate Trainer of Civil Guruji (Civil Engineers Training Institute) is Explaining Road Drain Raft/PCC/BBS/Shuttering/Curing in Full Detail at Site
    oad is equipped with a (proper) drainage system, the water along the roads will collect and be removed from the road body. This will protect the road surface, especially in case of dirt roads, and make the water available for productive use. Typically, the raison-d’être of road drainage systems is to preserve the roads and prevent runoff from interfering with road operations. However, at the same time they are large water-harvesting systems and should be managed accordingly. When not well designed and managed, road drainage commonly causes uncontrolled flooding and erosion that affects the road body, neighbouring land, and the environment. It is also a missed opportunity in terms of water harvesting for productive purposes.
    The runoff is preferably “given back” to the land through water harvesting and the diversion of water to farmland, spread over rangeland, or used for forest development. This is to keep the hydrological connectivity of the road network (i.e., the connections between the roads and the streams in the watershed) from becoming very high and water being rapidly drained from the watersheds. This would cause amplified flood peaks and give water less time to infiltrate and for aquifers to be recharged. Rather than road drains connected to the streams in the watershed, it is better to have road drainage water run into vegetation bunds, farm fields, or pastures. This would also reduce sediment deposition in the streams.
    As part of designing drainage systems, decisions on the number and location of culverts and other cross-drainage structures along a road body have an important effect on the opportunities to collect water, retain moisture, and control erosion and sedimentation. Cross-drainage structures are commonly placed in line with existing natural drainage paths such as gullies and small streams. They allow water from the upper catchment to pass underneath roads and connect directly to the downstream portion of the catchment. Because of cost, the number of cross-drainage structures is often minimized. These cross drains then commonly constitute bottlenecks, whereby naturally distributed runoff water is concentrated at a few points.
    Culverts are important elements in road water management. They can be major sources of damage where they discharge water in an uncontrolled manner, but they can also guide the runoff from the catchment to places where it is used beneficially. Culverts, including their bed-sill and some of the ancillary structures, can also help control erosion.

ความคิดเห็น • 44

  • @bajrangkumarcivilengineeri4053
    @bajrangkumarcivilengineeri4053 3 ปีที่แล้ว +3

    Good Morning to all

  • @aditlapcha
    @aditlapcha 3 ปีที่แล้ว +1

    Bahot khas video tq for video

  • @mohdfaizantech
    @mohdfaizantech 3 ปีที่แล้ว +3

    Good information thank you so much sir 👍

  • @Crazy_A_to_Z_Civil_Engineer
    @Crazy_A_to_Z_Civil_Engineer 3 ปีที่แล้ว +1

    Ek no. 1 sir

  • @anshul6359
    @anshul6359 3 ปีที่แล้ว +1

    Excavation
    Pcc bottom level prepare
    Pcc laying
    R/f and shuttering
    Raft
    Wall

  • @pushpakpurohit2383
    @pushpakpurohit2383 3 ปีที่แล้ว +2

    Sir please provide paid mock interview chance to all job Seeker in big companies it will boost our confidence before real interview. I hope u consider my request soon.
    Thank you

  • @azhadkhan3777
    @azhadkhan3777 3 ปีที่แล้ว +1

    Sir big fan sir 🙇🏻‍♂️🙇🏻‍♂️👑

  • @abdulaleem4497
    @abdulaleem4497 3 ปีที่แล้ว +1

    Good idea.

  • @erkundanyadav
    @erkundanyadav 3 ปีที่แล้ว

    Good topic

  • @devjigami7161
    @devjigami7161 3 ปีที่แล้ว

    Very good Sirji

  • @sangeet3456
    @sangeet3456 3 ปีที่แล้ว +1

    Sir water treatment plant ka construction process bateiye please.

  • @nemosdiary8271
    @nemosdiary8271 2 ปีที่แล้ว

    show us modi ji's new instruction to make drain,drinking water pipe,lighting work all done together on roads

  • @alishchauhan1227
    @alishchauhan1227 3 ปีที่แล้ว +2

    Sir civil diploma kya skill lena chahiye best privet job ke liye please sir bataye

  • @manojdangi7655
    @manojdangi7655 3 ปีที่แล้ว

    Best vedio Thnk you sir

  • @Ch.Ravindra6110
    @Ch.Ravindra6110 4 หลายเดือนก่อน

    What are frd blocks to drainage construction

  • @forwardedmany_times
    @forwardedmany_times 4 หลายเดือนก่อน

    3 फीट चौड़ी नाली के उपर स्लेब डालना है। सरिया और स्लेब की मोटाई बताइए कि ट्रक निकल जाए।

  • @ravikeshari9183
    @ravikeshari9183 2 ปีที่แล้ว +1

    How to calculate the qty of steel in RCC drain

  • @krishnanandsutihar7900
    @krishnanandsutihar7900 2 ปีที่แล้ว

    Tqs sir ji

  • @bkishorbag4251
    @bkishorbag4251 3 ปีที่แล้ว

    Thanks you sir

  • @Fahimkhanwtc5980
    @Fahimkhanwtc5980 ปีที่แล้ว +1

    Road Drain

  • @dineshgujjar8273
    @dineshgujjar8273 ปีที่แล้ว

    Can you explain design of rcc waste weirs

  • @engrsohaibkhani5172
    @engrsohaibkhani5172 11 หลายเดือนก่อน +1

    Very informative 👍🤍

  • @anilmeena7572
    @anilmeena7572 ปีที่แล้ว

    What the cross section size of drain and thickness of RCC side walls

  • @civilconstructionknowledge8077
    @civilconstructionknowledge8077 3 ปีที่แล้ว +1

    Offline class kb sa start hu ga sir

  • @sarfarazshah1163
    @sarfarazshah1163 2 ปีที่แล้ว

    Bicke ke sentring divider kese banate hsi

  • @PavanYadav-jj4dt
    @PavanYadav-jj4dt 3 ปีที่แล้ว

    Is course mai drain ka work bhi sikhaya jayega kya

  • @SureshYadav-pi8hu
    @SureshYadav-pi8hu 3 ปีที่แล้ว

    Sir Kaisa oiling used krte hii

  • @im_dushyantg
    @im_dushyantg 3 ปีที่แล้ว +3

    Traning/Coarse Fee???

    • @anshulrathure708
      @anshulrathure708 ปีที่แล้ว

      Bhai mere pass aaja free me dunga training

  • @girishdeshmukh8381
    @girishdeshmukh8381 ปีที่แล้ว

    0.3 0.3 drain ka only centring work ka Rate kitna hoga

  • @mohammadvahid1318
    @mohammadvahid1318 3 ปีที่แล้ว +1

    Rajasthan m branch kholo sir

  • @manojkandu1515
    @manojkandu1515 2 ปีที่แล้ว

    Gp२ of repairing started

  • @keshavkrishna2723
    @keshavkrishna2723 2 ปีที่แล้ว

    COPs course sahi lag raha hai koi review de sakta hai kya

  • @shankarbhai111
    @shankarbhai111 11 หลายเดือนก่อน

    Why one wall is higher than than other in drains

  • @ramshaili.
    @ramshaili. 3 ปีที่แล้ว

    hii sir

  • @devashishmeena896
    @devashishmeena896 2 ปีที่แล้ว

    How to make final bill of contract

  • @GulshanKumar-tv7km
    @GulshanKumar-tv7km 2 ปีที่แล้ว

    Sir eska gradient clear kro

  • @RiyaKumari-nd8er
    @RiyaKumari-nd8er 2 ปีที่แล้ว

    Ye to bihar LG rha h sir

  • @naveensrivastava5467
    @naveensrivastava5467 3 ปีที่แล้ว

    Sir Civil Guruji how to calculate steel in raft

  • @parmarbhavin5533
    @parmarbhavin5533 3 ปีที่แล้ว

    Poster Me Kuch Aur Video Me Kuch
    Fake Video

  • @avishekthakur6458
    @avishekthakur6458 2 ปีที่แล้ว

    Nub cameraman. Doest show anything only the person who is explaning

  • @PavanYadav-jj4dt
    @PavanYadav-jj4dt 3 ปีที่แล้ว

    Is course mai drain ka work bhi sikhaya jayega kya