#14 Updates from Farm 9 Nov 2024

แชร์
ฝัง
  • เผยแพร่เมื่อ 17 ม.ค. 2025

ความคิดเห็น • 4

  • @premraghav5231
    @premraghav5231 2 หลายเดือนก่อน +1

    Best wishes. New farmers love to see such updates

  • @mirzanadeemulla674
    @mirzanadeemulla674 หลายเดือนก่อน

    Hi , how area of your land, and which place. in the borewell how many inches of water , you were able to get. what is the capacity of the tank and how much it costed you. thanks . all the best

    • @EcosafeFarmer
      @EcosafeFarmer  หลายเดือนก่อน

      5.21 Acres, Near Palacode (Dharmapuri District in Tamilnady). Water output from the bore is only 1.5". At the moment, we are able to run the bore motor for around 2 hours, then we had to give it a break of 2 hours, then we can resume pumping. It takes almost 3 days to fill the sump of capacity ~75k litres.
      Sump cost ~ 1.7L, we constructed using solid blocks, and mesh plastering