Pre-Cast Concrete Pile Drive Installation Process | Get Service From Naif Engineering & Builders Ltd

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 ต.ค. 2024
  • In this video, We "Naif Engineering & Builders Ltd."' will show you how we installing precast concrete piles step By step using pile drive machine.
    The piles are usually driven in to the ground with the help of the hammers or vibratory drivers. Piles can also be inserted into the ground by jetting or partial auguring.
    For the installation process, first of all, the site is investigated and then piles are assessed based on strength and compressibility, etc. Groundwater level and artesian characteristics are also checked.
    To determine the level of foundation, information is collected from nearby structures and experiences of the piles in the close area. Before the execution of the work, complete working diagrams are prepared.
    This video visually explain how the Installation of Driven Precast Reinforced Concrete Piles carried out at Construction Sites.
    Our Services:-
    -----------------------
    • Design & Development
    • Modern Warehouse
    • Steel Structure Building
    • Piling-Foundation
    • Floor Coating Application
    • Supply Ready-Mix Concrete
    • Power Plant Construction
    • General Contracting
    • Construction Consulting
    • Leed & Green Building
    Contact With Us:
    -----------------------------
    Naif Engineering & Builders Ltd.
    //CONSTRUCTION OFFICE
    House #1062, 1st Floor
    Road #07 (Old 40), Avenue #08
    Mirpur DOHS, Dhaka-1216 Bangladesh.
    Hotline: +8801762-638816
    Tel: +88 02-58070485
    Email: info@neabl.com
    Website: neabl.com/

ความคิดเห็น • 1

  • @goodlifebd3903
    @goodlifebd3903 2 ปีที่แล้ว

    Vai sylhet e ki kora jabe 25 feet pre cast pile?