ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
Thank you sir for very informative video🙏🙏🙏
Very very tha ks
Nice vedio sir ji
Thanks
Nice vedio sir
Sir, is there any chance of waterproofing membrane punching in time of hole drilling ???
A video in this regard will be given
Sir at first u told drilling 3m and 2nd time 6m. Confirmed sir please
You may please be aware that minimum depth of hole for consolidation grouting should not be less than 3.00m. If rock strata is class 4 and above then depth of hole should be up to 6.00 m.
Sir can you tell me which code we have to refer for grout material
IS 1578(Part - VII): 1972
Thank you sir for very informative video🙏🙏🙏
Very very tha ks
Nice vedio sir ji
Thanks
Nice vedio sir
Thanks
Sir, is there any chance of waterproofing membrane punching in time of hole drilling ???
A video in this regard will be given
Sir at first u told drilling 3m and 2nd time 6m. Confirmed sir please
You may please be aware that minimum depth of hole for consolidation grouting should not be less than 3.00m. If rock strata is class 4 and above then depth of hole should be up to 6.00 m.
Sir can you tell me which code we have to refer for grout material
IS 1578(Part - VII): 1972