CMC Installed on Ocean Blackrinho Drillship-ASTICAN Installation
ฝัง
- เผยแพร่เมื่อ 30 พ.ค. 2021
- Pioneering work at our Astican Deepwater Quayside facilities at the Reina Sofía dock, with the largest crane used in the Port of Las Palmas. Able to lift 1,300 tonnes and a 138-meter-long boom that makes lifting a CMC compensator and placing it on top of the drillship tower seem like an easy task.
Ship repair in Canary Insland - ยานยนต์และพาหนะ