Very good informative vedio for the new ppl. However , u missed one very important advise for travellers towards CPEC M -14 that they must hv a short stay at Hakla rest area for getting anything like fuel, tire pressure check, going to wash room, getting sufficient drinking water, nd eating nd drinking things for the long 3-4 hour journey, because there is no any rest area in between for next 300 km to DiK. Such advice is always very useful. Hope in any next vlog, u will add this point also. Appreciated. Malik Aslam, 19-12-2021.
Quetta kuchlak Zhob CPEC western route work in full swing on package 5 and 4 from Quetta side most of the mud filling done on both sections and concrete work also start on pck 5 on water ways which huge project beautifully deighn wider then M14 Motorway both side much side shoulder available plus about 30 feet distance between two lanes request govt to start work early on package 3 2 1 and Zhob DIKhan 210 missing section which China didn't funded in early arvest should be redesigned it can become more short just to 160km and after Peshawar DIKhan Motorway no need to bring near DIKhan as old design was to saggu it's route should be straight to from yarik to Daraban Mughal kot danasar then Zhob .. thanks
Shehzad bahi d i khan sa agr bike pa koi bnda jaye is m14 pa unofficially to hkla pohnch kr kis side sa islmd jye ga .. Yh to ap peshwr moterway sa a rhy thy ispa to bike not allowed ha
@@qaisershahzadqureshi1847 What would happen at the same toll plaza while coming from DI Khan to Islamabad , i mean how will they charge us as we would not have any ticket ???
Motorway police ny charge ly liya ha kya bahijan agr ni liya ha tu bol kr b koi ic rod par safr na kry bot bury rod acsidant ho rhy hain ic rod pr koi roll ni ha na koi help sarvrs b ni ha ji or rat ko tu bol kr b safr na kry
Qureshi Sb. whether the left loop for the travelers coming from M-1 Peshawar, Abbottabad areas (and intend to use M-14 for Mianwali/D.I Khan) is opened at Hakla or not? You have earlier very kindly informed that this is still closed and waiting for inauguration by IK. We don't know that this inefficient PM and his team will get it inaugurated in the earliest possible because his ability is only for delaying the projects of N-League and doing nothing on his part, but how proudly IK inaugurates the projects of the previous Govt. Even this project of N-League got three years late due to historical inability and false intentions of this Govt. of nonsense people. May Allah pull this Govt. out for an early end. Aameen.
ماشاءاللہ بھائی جان بہت پیاری ویڈیو بنائی ہے آپ نے اللہ پاک آپ کو سلامت رکھے
Very good informative vedio for the new ppl. However , u missed one very important advise for travellers towards CPEC M -14 that they must hv a short stay at Hakla rest area for getting anything like fuel, tire pressure check, going to wash room, getting sufficient drinking water, nd eating nd drinking things for the long 3-4 hour journey, because there is no any rest area in between for next 300 km to DiK. Such advice is always very useful. Hope in any next vlog, u will add this point also. Appreciated. Malik Aslam, 19-12-2021.
Ok nice suggestion
Eight rest areas are under construction.
🔍↕️
Very good information
Ajmal sha and asad khan
Masha Allah very nice stay blessed.
Very informative video love and best wishes from Canada
Thanx akhlaq sab...support my chanel in canada
Great job and informative video bro ❤️❤️🌺
Very informative video for new entrance. Thanks
Thank you so much for your guidance. Very nice video.
NYC you make it easy for me
Quetta kuchlak Zhob CPEC western route work in full swing on package 5 and 4 from Quetta side most of the mud filling done on both sections and concrete work also start on pck 5 on water ways which huge project beautifully deighn wider then M14 Motorway both side much side shoulder available plus about 30 feet distance between two lanes request govt to start work early on package 3 2 1 and Zhob DIKhan 210 missing section which China didn't funded in early arvest should be redesigned it can become more short just to 160km and after Peshawar DIKhan Motorway no need to bring near DIKhan as old design was to saggu it's route should be straight to from yarik to Daraban Mughal kot danasar then Zhob .. thanks
Now the NHA should continue the road from Hakla to Draban. it will reduce the distance of Quetta from Islamabad by bypassing DIKhan.
Excellent
Ye video M1 motorway ki hai. Aur sirf 1 minute se b kam akhri clip M1 se DIK interchange for dik islamabad motorway hai.
The best guide lines you posted Sir.
Sr please ak vedio m.m road jo ban rha hy us bhe bana lain detail say kitny section hain companys kon kon si hain plz
Keep up the good work. 👍🏻
Thanks for good information kemari karachi 23.12.2021
Thankyou for your guidance through out the project
Thanks very informative vedio
very nice and good guidance video
Excellent 👍👍👍👍
Nice sharing
Bahi
Isb sy agr bannu jna hai tu konsy interchange py utrnaa huga?? And totala ketna faslaa hoga???
ماشاءاللّٰه الحمداللّٰه 🇵🇰
AoA Bhai Plzzz Rawalpindi 2 Isakhel Full Route Video Banain!! Mainy 4 Din Baad Ana H Mianwali Plzz Jaldi Video Lain!
Osm
Qureshi sab please also update about the under construction valley of package 4...
good one .
Quetta s Islamabad aur Karachi motorway kab bany gi
MASHA ALLHA
good info but kia ye CPEC road bike k lye khula hoa he..
No
Good inf on rmation
But tell us
From m1 to niazi intr chang
K metr
Garmio m yaha grime zada ho gi lahza yaha tarhat lagy
👍
Nice
Shehzad bahi d i khan sa agr bike pa koi bnda jaye is m14 pa unofficially to hkla pohnch kr kis side sa islmd jye ga ..
Yh to ap peshwr moterway sa a rhy thy ispa to bike not allowed ha
Behtr ha k bike wala dhok syedan interchange se out ho k old fateh jang road use kre
@@qaisershahzadqureshi1847 chalen thk ha bahi thanks for information
Pakistan ky sary shrio m ring road kab bany gi
Ya Allah govt ko Quetta bi deak dy ty ky why bi metro bus ban sky
AoA Islamabad inter change ki parchee kahan deposit ho gee and confirm karna and thank you.
Yet no need
What would happen at the same toll plaza while coming from DI Khan to Islamabad , i mean how will they charge us as we would not have any ticket ???
they r getting only 30 rupe
@@qaisershahzadqureshi1847 ok, that's great to know. Thank you ☺️
Sir es pe bick allow he ya ni?agr he to bick kha se entry kar sakty hen
Not allowed
Thank you, how many interchanges are made e.g. can we turn to to Kot Mor or Jand ??
11....kot mor pe no interchange
Kya bikes allowed hain cpec per
No
bhai, Islamabad se D.I.KJANtk total ketna fasela beta ha.?
350
Bahi atni late kun ho gy
Bai pindigap to kohat road ki kya update hai?
Soon
Bhai! Ab halka sy d i khan tk cpec complete hai ya kahn kam rhta hai suna hai Fateh jang interchange py road band hai kindly confirm kr den
Open ha me aj Islamabad sa Pindigheb Aya hu. Kaam chal rha ha lekin gari k guzarnay k Lia jaga available ha. So no issue
Open open
Islamabad sa haqla interchange ktny km ha or time kitna lagta ha,?
25 k.m frm zeropoint...25 mint
Hakla, Dik
Islamabad sa Dik ,?
@@Mashallah11112 350
ملتان تا ڈی آئی خان موٹروے کا بھی کیا کوئی پروجیکٹ یے مستقبل میں؟؟
No
Jand say karpa ka kia bana
aik 2 din me video aa re ha
Bahi airport ky lay pewsher to airport
What happened to the road ticket which you had taken at entry point on M1.. Did you pay toll or not?
Not....it was just formality,any how after inauguration it wll b applicable
@@qaisershahzadqureshi1847 What would happen at the same toll plaza while coming from DI Khan to Islamabad , i mean how will they charge us as we would not have any ticket ???
Motorway police ny charge ly liya ha kya bahijan agr ni liya ha tu bol kr b koi ic rod par safr na kry bot bury rod acsidant ho rhy hain ic rod pr koi roll ni ha na koi help sarvrs b ni ha ji or rat ko tu bol kr b safr na kry
Right
When CPEC open?
25
Itna dour route wrong info
Qureshi Sb. whether the left loop for the travelers coming from M-1 Peshawar, Abbottabad areas (and intend to use M-14 for Mianwali/D.I Khan) is opened at Hakla or not? You have earlier very kindly informed that this is still closed and waiting for inauguration by IK. We don't know that this inefficient PM and his team will get it inaugurated in the earliest possible because his ability is only for delaying the projects of N-League and doing nothing on his part, but how proudly IK inaugurates the projects of the previous Govt. Even this project of N-League got three years late due to historical inability and false intentions of this Govt. of nonsense people. May Allah pull this Govt. out for an early end. Aameen.
Yet not opened ,cant opened till hakla makeshift toll plaza is not functional...any how 2 loops opened for trafic. u r right M.14 delayed 2 year
Rubbish Driving
Masha Allah very nice stay blessed.