HPS Schönox Case Study Massey Building - Iberia Bank

แชร์
ฝัง
  • เผยแพร่เมื่อ 13 ม.ค. 2025
  • This project was completed by Gleen's Flooring in Birmingham, AL. This building had an existing concrete substrate with a 3" deep cavity. Schönox SEZ PLUS, VD, and US were used on this job.

ความคิดเห็น •